# | ||||
---|---|---|---|---|
1 | PROSUM Prospecting Secondary raw materials in the Urban mine and Mining waste | 2015 | 3˙704˙327.00 | 3˙051˙577.00 |
The Institution WASTE OF ELECTRICAL AND ELECTRONICAL EQUIPMENT FORUM AISBL has been involved also in the following Horizon 2020 projects.