Opendata, web and dolomites

ImmersiaTV project deliverables

The page lists 18 deliverables related to the research project "ImmersiaTV".

 List of Deliverables

ImmersiaTV: list of downloadable deliverables.
title and desprition type last update

Capture Components

This deliverable will consist, in each iteration, of releasing the hardware components and release of software interfaces developed needed to capture omnidirectional video.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Other 2019-05-28

User Evaluation

This report will detail, iteratively, the perception of the experience by the end-users, as well as the perception of professional content producers using the production tools from performance and service management perspectives. Usability aspects will also be included in this report.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Professional Requirements

This document will detail the professional requirements needed for both offline and live produced content, updated with the insight gained in the previous pilots

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Transmission, reception and overall delivery strategies of omnidirectional live streams

This deliverable will consist, in each iteration, of releasing the components needed to distribute and deliver omnidirectional video over WAN OTT networks and LAN controlled networks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Other 2019-05-28

Coding and Decoding Modules

This deliverable will consist, in each iteration, of releasing the components needed to encode and decode omnidirectional video.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Other 2019-05-28

Market analysis report

This deliverable describes the market for audiovisual immersive products and provides a set of recommendations as input for the use cases and the exploitation and innovation transfer activities in T.5.2.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Documentation and technical fact sheets

This deliverable provides all the printable support documentation of ImmersiaTV.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Technical Evaluation

This report will detail, iteratively, the technical aspects of the outcome of the pilots: what worked and what did not, what should be improved from a technical performance perspective.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Interaction & Display

This deliverable will consist, in each iteration, of software solutions for each of the display devices in the living room (traditional TV, second screen, immersive display)

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Other 2019-05-28

End-user Requirements

This document will detail the end-user requirements needed for an the content produced. Each iteration will extend the previous one with the additional insights gained, and the novel case scenario to be addressed

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Content Ideation, Production scenarios and requirement analysis

This document will describe the scenarios selected, ideas for the audiovisual language to be used for immersive content and across devices, both for offline and live content, and include the technical specification scenarios to be implemented

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Pilot Execution Reports

This deliverable will consist in a report of the pilots executed as well as batch demonstrators that will be further used by WP5 and WP2 to define needs in terms of exploitation and technical refinement, respectively.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Workflow integration & End-to-end tests

The outcome of the tests integrating the system will be explained in a report containing the result of the tests, current limitations, and suggestions for architecture and implementation improvements.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Other 2019-05-28

Quality of Experience

This deliverable will consist of releasing the components needed to render and interact with content based on omnidirectional video.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Content Creation

This deliverable is the dataset of produced content and raw audiovisual material

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Other 2019-05-28

Execution & Evaluation Plan

This report will explain how we plan to execute and evaulate the pilots to be performed

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Design Architecture

This deliverable, in each of its iteration will address the design and refinement of the overall architecture, taking into account the outcomes of task 2.3. It feeds the rest of the tasks in the work package

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Documents, reports 2019-05-28

Production Tools

This deliverable will consist, in each iteration, of releasing the production tools needed to produce content based on omnidirectional video.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015

download deliverable 

Other 2019-05-28