Opendata, web and dolomites

INNOWAG SIGNED

INNOvative monitoring and predictive maintenance solutions on lightweight WAGon

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "INNOWAG" data sheet

The following table provides information about the project.

Coordinator
UNIVERSITY OF NEWCASTLE UPON TYNE 

Organization address
address: KINGS GATE
city: NEWCASTLE UPON TYNE
postcode: NE1 7RU
website: http://www.ncl.ac.uk/

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Project website http://newrail.org/innowag/
 Total cost 1˙500˙562 €
 EC max contribution 1˙500˙562 € (100%)
 Programme 1. H2020-EU.3.4.8.5. (Innovation Programme 5: Technologies for sustainable and attractive European rail freight)
 Code Call H2020-S2RJU-OC-2015-01-2
 Funding Scheme Shift2Rail-RIA
 Starting year 2016
 Duration (year-month-day) from 2016-11-01   to  2019-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    UNIVERSITY OF NEWCASTLE UPON TYNE UK (NEWCASTLE UPON TYNE) coordinator 370˙000.00
2    TECHNISCHE UNIVERSITAT BERLIN DE (BERLIN) participant 173˙500.00
3    UZINA DE VAGOANE AIUD SA RO (AIUD) participant 157˙000.00
4    PERPETUUM LIMITED UK (SOUTHAMPTON) participant 143˙750.00
5    POLITECNICO DI MILANO IT (MILANO) participant 133˙125.00
6    Inertia Technology B.V. NL (ENSCHEDE) participant 112˙000.00
7    VYZKUMNY USTAV ZELEZNICNI, AS CZ (PRAHA BRANIK) participant 109˙500.00
8    HAVELLANDISCHE EISENBAHN AKTIENGESELLSCHAFT DE (BERLIN) participant 97˙125.00
9    LUCCHINI RS SPA IT (Brescia) participant 86˙000.00
10    UNION DES INDUSTRIES FERROVIAIRES EUROPEENNES - UNIFE BE (BRUXELLES) participant 67˙500.00
11    NEW OPERA AISBL BE (BRUXELLES) participant 51˙062.00

Map

 Project objective

This proposal responds to the first Open Calls issued by the Shift2Rail Joint Undertaking, as part of Shift2Rail Horizon 2020 programme. It specifically addresses the topic S2R-OC-IP5-03-2015: Intelligent freight wagon with predictive maintenance. This topic is complementary with topic S2R-CFM-IP5-02-2015: Start-up activities for Freight Automation. The INNOWAG project will work towards increasing rail freight competitiveness and the development of the next generation of lightweight and intelligent freight wagons by addressing specific challenges in the three essential areas, identified by the call, through three subsequent work streams, namely: - Work Stream 1 (WS1): Cargo condition monitoring; - Work Stream 2 (WS2): Wagon design; and - Work Stream 3 (WS3): Predictive maintenance. Moreover, INNOWAG will consider the compatibility between the solutions proposed and researched in the three areas, as well as their integration into a novel concept of wagon. The aim of the proposed INNOWAG project is to develop intelligent cargo monitoring and predictive maintenance solutions integrated on a novel concept of lightweight wagon, which would respond to major challenges in rail freight competitiveness, in relation to the increase of trans The INNOWAG project will determine how to effectively integrate innovative technologies for cargo condition monitoring into a novel high performance lightweight freight wagon, supported by effective health monitoring technologies, and predictive maintenance models for sustainable and attractive European rail freight. The development of novel technology concepts and predictive maintenance models and procedures will be separately addresses by the INNOWAG work streams. The concept underpinning the INNOWAG project relies on the actual needs of rail freight for increasing its competitiveness and attractiveness. The INNOWAG project therefore aims at developing a rail freight service that fits the needs of modern manufacturing and supply chain.

 Deliverables

List of deliverables.
Dissemination tools Websites, patent fillings, videos etc. 2020-03-13 11:37:59
Models for reliability, statistical information, real time health status of the rolling stock, prognostic analysis, and economic data Documents, reports 2020-03-13 11:38:02
Modelling and analyses of novel lightweight design solutions Documents, reports 2020-03-13 11:39:00
Wizard tool for maintenance policy optimisation Documents, reports 2020-03-13 11:38:57
Exploitation Report Documents, reports 2020-03-13 11:39:02
Freight vehicle lightweight concept design Documents, reports 2020-03-13 11:38:08
Report on the use of the results by Shift2Rail Documents, reports 2020-03-13 11:39:03
Integration of cargo monitoring and predictive maintenance solutions on the lightweight wagon concept Documents, reports 2019-11-08 11:12:49
Energy concept for cargo condition monitoring Documents, reports 2019-11-08 11:12:50
Wireless data communication concept for cargo condition monitoring system Documents, reports 2019-11-08 11:12:48
Benchmark and market drivers for an integrated intelligent and lightweight wagon solution Documents, reports 2019-05-31 16:24:44
Set up an exploitation plan for the project Documents, reports 2019-05-14 09:09:43
Overall measurement concept for cargo condition monitoring system Documents, reports 2019-05-14 09:09:44
Dissemination and communication plan Documents, reports 2019-05-14 09:09:44
Project website Websites, patent fillings, videos etc. 2019-05-14 09:09:43
Project management and quality plan Documents, reports 2019-05-14 09:09:44
Specifications and requirements for INNOWAG technologies and solutions Documents, reports 2019-05-14 09:09:43
Cost-driven and reliability driven analysis of wagon condition data Documents, reports 2019-05-14 09:09:43

Take a look to the deliverables list in detail:  detailed list of INNOWAG deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "INNOWAG" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "INNOWAG" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.5.)

FR8RAIL III (2019)

Smart data-based assets and efficient rail freight operation

Read More  

LOCATE (2019)

Locomotive bOgie Condition mAinTEnance

Read More  

FR8RAIL II (2018)

Digitalization and Automation of Freight Rail

Read More