The page lists 19 deliverables related to the research project "BEBA".
title and desprition | type | last update |
---|---|---|
Technology, performance and functional assessmentThis deliverable will document the performance results and the functional operation of stand-alone BEBA prototypes, as well as the initial integration in a controlled network environment. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Intermediate dissemination, standardization and exploitation planThis deliverable reports the dissemination and ONF promotion/standardization achievements, as well as the plans for the next period. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
BEBA data plane extensionsThis document describes the BEBA data plane requirements in terms of novel primitives. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Revision of the BEBA data plane software design, implementation and accelerationThis document will revise D.3.3 and will describe the final BEBA data plane software design and implementation. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Trial assessmentDemonstration of BEBA at network scale, in both controlled and real world deployments. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Demonstrators, pilots, prototypes | 2019-07-23 |
Preliminary Applications’ design and developmentThis deliverable will describe the preliminary design of the middlebox and network-wide applications and services developed on top of BEBA. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Revision of BEBA data plane extensionsThis deliverable will revise D3.1 and will freeze the data plane primitives that will be invoked through the full BEBA API and will be implemented and accelerated in task 3.2 and 3.3. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Basic BEBA abstraction APIThis deliverable will document the first proposed API for the basic stateful operation support. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Reliability and security improvementsThis deliverable will document reliability and security improvements provided by the developed offloading, verification, and security mechanisms. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Support mechanisms for control task offloading.This document will identify and specify mechanisms to permit offloading of control plane tasks into BEBA’s stateful dataplane. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Extended BEBA abstraction proof of concept prototypeThis deliverable document all the software prototypes provided by WP2. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Demonstrators, pilots, prototypes | 2019-07-23 |
BEBA data plane software design, implementation and accelerationThis deliverable documents the design and implementation of the BEBA data plane components as well as the acceleration strategies of the critical operations. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Final dissemination, standardization and exploitation planThis deliverable revises D7.2 and provides the final report regarding the dissemination and standardization activities, adding open source promotion ones. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Extended BEBA abstraction APIThis deliverable documents the definition of the extended BEBA API. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Real world trial planningThis deliverable will plan the real worl trial deployment (layout, test cases, possible obstacles, experimental methodology, etc.). Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Basic BEBA abstraction proof of concept prototypeThis deliverable will provide a proof of concept prototype for the basic BEBA API. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Demonstrators, pilots, prototypes | 2019-07-23 |
Use case and application scenarios This deliverable will document use cases and application scenarios, along with the relevant nodes’ programmability requirements. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Verification and exploitation or control tasks delegationThis deliverable will report on the advantages of control task offloading, and will design novel formal verification and model checking techniques for BEBA’s stateful dataplane. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |
Final Applications’ design and development This deliverable will revise and extend D5.2 by describing design and implementation of the middlebox and network- wide applications and services developed on top of BEBA. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014 |
Documents, reports | 2019-07-23 |