Opendata, web and dolomites

BEBA project deliverables

The page lists 19 deliverables related to the research project "BEBA".

 List of Deliverables

BEBA: list of downloadable deliverables.
title and desprition type last update

Technology, performance and functional assessment

This deliverable will document the performance results and the functional operation of stand-alone BEBA prototypes, as well as the initial integration in a controlled network environment.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Intermediate dissemination, standardization and exploitation plan

This deliverable reports the dissemination and ONF promotion/standardization achievements, as well as the plans for the next period.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

BEBA data plane extensions

This document describes the BEBA data plane requirements in terms of novel primitives.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Revision of the BEBA data plane software design, implementation and acceleration

This document will revise D.3.3 and will describe the final BEBA data plane software design and implementation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Trial assessment

Demonstration of BEBA at network scale, in both controlled and real world deployments.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-07-23

Preliminary Applications’ design and development

This deliverable will describe the preliminary design of the middlebox and network-wide applications and services developed on top of BEBA.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Revision of BEBA data plane extensions

This deliverable will revise D3.1 and will freeze the data plane primitives that will be invoked through the full BEBA API and will be implemented and accelerated in task 3.2 and 3.3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Basic BEBA abstraction API

This deliverable will document the first proposed API for the basic stateful operation support.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Reliability and security improvements

This deliverable will document reliability and security improvements provided by the developed offloading, verification, and security mechanisms.



Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Support mechanisms for control task offloading.

This document will identify and specify mechanisms to permit offloading of control plane tasks into BEBA’s stateful dataplane.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Extended BEBA abstraction proof of concept prototype

This deliverable document all the software prototypes provided by WP2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-07-23

BEBA data plane software design, implementation and acceleration

This deliverable documents the design and implementation of the BEBA data plane components as well as the acceleration strategies of the critical operations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Final dissemination, standardization and exploitation plan

This deliverable revises D7.2 and provides the final report regarding the dissemination and standardization activities, adding open source promotion ones.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Extended BEBA abstraction API

This deliverable documents the definition of the extended BEBA API.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Real world trial planning

This deliverable will plan the real worl trial deployment (layout, test cases, possible obstacles, experimental methodology, etc.).

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Basic BEBA abstraction proof of concept prototype

This deliverable will provide a proof of concept prototype for the basic BEBA API.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-07-23

Use case and application scenarios 

This deliverable will document use cases and application scenarios, along with the relevant nodes’ programmability requirements.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Verification and exploitation or control tasks delegation

This deliverable will report on the advantages of control task offloading, and will design novel formal verification and model checking techniques for BEBA’s stateful dataplane.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23

Final Applications’ design and development 

This deliverable will revise and extend D5.2 by describing design and implementation of the middlebox and network- wide applications and services developed on top of BEBA.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-05-2014

download deliverable 

Documents, reports 2019-07-23