Opendata, web and dolomites

Flourish project deliverables

The page lists 37 deliverables related to the research project "Flourish".

 List of Deliverables

Flourish: list of downloadable deliverables.
title and desprition type last update

Weed Detection and Predictive Tracking

This deliverable consists of a working prototype for the weed detection and tracking software, running on the Bonirob platform with live data-streams.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Coordinated UGV and UAV Operations

This deliverable will provide the framework for coordinated operation of the UGV and UAV operations,
making sure they successfully achieve their individual missions while being able to rendezvous or synchronize
when required.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

UAV Localization

A UAV localization module which gives robust and accurate estimates of the UAV position and orientation
on the field using a combination of the on-board sensor data and communication with the UGV.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

End-User Evaluation Report

A report on the evaluation of the system conducted by the end user. This report should drive future system specification.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Development Repository

A web-based repository for the software developments with access for all partner will be setup. It will furthermore support bug tracking and project-specific wiki pages.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Long-term Navigation Optimization Module

A module that will use the experience from previous operations in the same field, to predict likely conditions,
in particular possible slippage or ground softness. If possible, and when enough data will be available, this prediction could account for the weather reports and forecast. The performance of the terrain condition prediction will be assessed by integrating it in the control and planning framework and observing if and how it makes a difference.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Adaptive Mission Planning

A software module that takes coverage history and areas of interest as inputs from WP2 and plans a sequence of UAV missions, taking into account the current battery status the current map.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Data Analysis and Interpretation

\"• A software module for converting the raw data gathered by the UAV sensors into tested reliable
vegetation indices and plant growth and vitality indicators.
• A validation of the indices calculated using the UAV sensors with \"\"ground truth\"\" from the FIP.
• Correlations between vegetation indices, sensor data and farm inputs along with derivation methodology.
The initial version in M15 will work with the maps delivered in D2.2 at M15. The final version will work with the updated maps delivered in M35.\"

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

UGV-based crop and weed detection

The deliverable consists of a report about the crop and weed detection system including the evaluation.
In addition to that, the source code of the system will be shared among the partners. The intermediate deliverable at M15 will have limited functionality.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Data Management Plan

This document will outline the project’s data management plan. It will describe the types of data generated by the project, what standards will be used when publishing the data, how the data will be made available to third parties, and how the data will be preserved during and beyond the lifetime of the project.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Model Update After Local Treatment

This deliverable consist of a working prototype for the spraying application.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Project web-page

The website including a public document database will be operational from month 2 on. It will be updated continuously during the project

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Database and User Interface Specification

The deliverable will consist of the software specification for the database 7.1). Key metrics and interaction requirements must be specified at this time. Additionally the key user interactions, API/topics for communication, and required features of the user interface 7.4) should be specified.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

UGV Environment Modeling

The deliverable consists of a report about the UGV mapping system. The source code for the optimisation system will be released as open source software and will be shared among the partners.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Press Video

A press video explaining the aims of the project, the scientific results, and the impact to society in plain language.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Database and User Interface Development

This deliverable will consist of the development of the database and the user interface. Database deliverables
include a database backend and a visual web fronted that visualize key metrics as specified. User
interface deliverables include a functional fronted that communicates with the robotics system through
the specified API.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Cooperative Environment Modeling

This deliverable will provide the results of joint UAV/UGV environment modeling.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Local Collision Avoidance

A software module that computes a local obstacle map and system-compliant motions that are safe, collision free, and closely follow the mission path delivered by the module from Task 3.1.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

UAV Environment Modeling

A software module for combining the gathered sensor data with the output of the localization module into time-stamped, geolocated maps which are dynamically updated with every UAV mission.The final version will be delivered in M25.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

First Periodic Report

First periodic report for the project.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Dissemination and Exploitation Report

A report about achieved dissemination activities and the exploitation activities.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Planner Module(s)

A module that publishes a planned trajectory as a list of x,y,angle poses and a module that creates motion commands for the robot to drive along these way-points. The two modules might also be combined into
one.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Hardware and Software Specification

This deliverable will consist of the software specification of the new components in Flourish and those
components stemming from the existing UAV and UGV platforms that need to be adapted.
A second part of the deliverable will consist of the hardware modifications of the platforms, including
adaptation of the existing BoniRob platform to meet the precise ground intervention requirements, as
well as sensors and hardware modification needed for the aerial survey task.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Hardware Setup and Modification

This deliverable will consist of hardware modification to the UAV and UGV platforms. The modifications
include changes specified in D1.3.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Initial Data Acquisition

This deliverable will consist of log files recorded from the initial field tests.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Integration Evaluation Report

A report on the conducted evaluation of the system and its performance as well as a summary of the (integration and) testing weeks and related activities.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Navigation Interface

This deliverable will consist of the interface specification for pushing navigation commands to the UGV.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Brochure, Newsletter, and Knowledge Management Report

A nicely laid out brochure at M30 to inform the public about the project and its main objectives and content. Public newsletters will be send bi-annually from M24 on to inform the public about the Flourish project. A knowledge management report will be provided to keep internal and external experts informed about new knowledge or patents created in the project.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Second Periodic Report

2nd periodic report for the project.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Integration Plan

Integration plan showing how the new to develop components will integrate among each other and with the existing modules.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Traversability Analysis Module

A module that publishes a local map with annotations if a cell is traversable by the UGV or not, according
to its specifications.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Integrated System Ready and Components Available

A report about the conducted integration activities, problems and resolutions as well as a summary of the integration weeks and related activities.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Use-Case Analysis and Requirements

This deliverable will consist of the use-case specification of the new to develop components in Flourish and the mission scenarios that will be carried out during the field tests.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Weed Treatment Modules

This deliverable consists of a working prototype for selective spraying module and the mechanical weed treatment module, integrated on the Bonirob platform.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Localization Module

A UGV localization module which publishes both global poses (on
the field or in a GPS frame) and precise local poses regarding plants/rows on the field.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Integrated Perception and Weed Treatment

This deliverable consist of a demonstration of the integration of weed detection and tracking with both treatment modules: the mechanical weed treatment module and and the selective spraying module.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30

Third Periodic Report

Third periodic report for the project.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2019-05-30