Opendata, web and dolomites

ProACT project deliverables

The page lists 28 deliverables related to the research project "ProACT".

 List of Deliverables

ProACT: list of downloadable deliverables.
title and desprition type last update

ProACT training workshops and seminars (D7.7 Part C)

Update 2 of 2 to D7.7: ProACT training workshops and seminars: to showcase the work of the consortium highlighting state of the art research and ICT-AT activities. Initial workshops in month 16 with updates future events in months 32 and month 42

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

ProACT ICT-AT Solutions Release (Final Release) (D2.5 Part C)

Update 2 of 2 to D2.5: ProACT ICT-AT solution releases: Final Release - version to be used beyond the project timeframe (M39)

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

Report on dissemination, exploitation and communication activities and events (D6.4 Part C)

Update 2 of 2 to D6.4: Report on dissemination, exploitation and communication activities and events. Initial deliverable M12 with further updates in M27 and M42 (in line with project reporting periods)

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

A set of analytical methods to measure ecosystem performance (D3.3 Part C)

Update 2 of 2 to D3.3: Document detailing a set of analytical methods to measure the ProACT ecosystem performance.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Whitepaper: Needs and requirements of ProACT IC for Multimorbidity Care and Support (D1.3 Part B)

Update 1 of 1 to D1.3: This will be a public document addressed to any stakeholder in the value chain in order to identify challenges that have both socio-economic as well as scientific-technological domains.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Report on ProACT EU Transferability Study

Report on ProACT EU Transferability Study. Focus will be primarily on an EU wide survey into the knowledge and expectations that traditional health and social care providers have about technological innovation for the delivery of integrated care. The survey will look into the multiple factors that determine the uptake of integrated care platforms or the resistance against it among the different stakeholders (health professionals, social care workers, providers, funding agencies).

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

ProACT training workshops and seminars (D7.7 Part B)

Update 1 of 2 to D7.7: ProACT training workshops and seminars: to showcase the work of the consortium highlighting state of the art research and ICT-AT activities. Initial workshops in month 16 with updates future events in months 32 and month 42

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

A set of person centred analytical methods (D3.2 Part B)

Update 1 of 2 to D3.2: Development of a set of person-centred analytical methods for risks and outcomes.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

A Set of Person-Centred Analytical Methods

Development of a set of person-centred analytical methods for risks and outcomes.

The initial report will be delivered in month 10 with updates in months 22 and 39.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Report on the cost benefits of ProACT ICT-AT

Report on the costs and benefits (in monetary value) ProACT ICT-AT (PaaS and SaaS).

Initial report in month 18 with an update in month 42.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Report on dissemination, exploration and communication activities and events (D6.4 Part B)

Update 1 of 2 to D6.4: Report on dissemination, exploitation and communication activities and events. Initial deliverable M12 with further updates in M27 and M42 (in line with project reporting periods)

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Business Case Report for ProACT

Business Case Report for ProACT.

Initial report month 18 with update in month 42.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

ProACT Training workshops and seminars

ProACT Training workshops and seminars: to showcase the work of the consortium highlighting state of the art research and ICT-AT activities.

Initial workshops/seminar in month 16 with updates/future events in months 32 and 42.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

ProACT ICT-AT Solutions 1st Release

ProACT ICT-AT solution releases: 1st Release – version for the test trial (M9, CASALA). 2nd Release – version for the main PoC trial (M24). Final Release – version to be used beyond the project timeframe (M39, CASALA).

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

Ecosystem trial strategic plan (D1.4 Part B)

\"Update 1 of 2 to D1.4: This document will outline the framework for the trials: where, how, with which tools, which roles and partners, third party legal and ethical requirements. Plans will include protocol for conducting \"\"friendly\"\" pilot study (Part A, due M9); protocol for conducting large-scale trial (Part B, due M23); and protocol for conducting feasibility study (M28).\"

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Set up of ProACT website, social media & digital dissemination & communication tools

Set up of ProACT website, social media & digital dissemination & communication tools.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-02-25

ProACT ICT-AT Solutions Release (Second Release) (D2.5 Part B)

Update 1 of 2 to D2.4: ProACT ICT-AT Solution Release: 2nd Release - version for main PoC trial (M24)

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

Report on dissemination, exploitation and communication activities and events

Report on dissemination, exploitation and communication activities and events.

Initial deliverable month 12 with further updates in months 27 and 42 (in line with project reporting periods)

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Report Detailing the Care Models/Pathways

This will identify the key stakeholders to engage with during the requirements gathering phase, care pathways of the patient and challenges in supporting patients at home.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

A Set of Analytical Methods to Measure Ecosystem Performance

Document detailing a set of analytical methods to measure the ProACT ecosystem performance.

Initial deliverable is due month 10 with updates in months 22 and 39.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Report specifying the conditions for effective BC with ICT-AT in ProACT

Report specifying the conditions for effective behavioural change with ICT-AT in ProACT.

Initial deliverable is due month 9 with updates in months 19 and 39.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Report on innovative value network of ICT-AT in EU

Report on innovative value network of ICT-AT in Europe.

Initial deliverable month 18 with update month 40.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Ecosystem trial strategic plan (D1.4 Part C)

\"Update 2 of 2 to D1.4: This document will outline the framework for the trials: where, how, with which tools, which roles and partners, third party legal and ethical requirements. Plans will include protocol for conducting \"\"friendly\"\" pilot study (Part A, due M9); protocol for conducting large-scale trial (Part B, due M23); and protocol for conducting feasibility study (M28).\"

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

A set of analytical methods to measure ecosystem performance (D3.3 Part B)

Update 1 of 2 to D3.3: Document detailing a set of analytical methods to measure the ProACT ecosystem performance.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Ecosystem Trial Strategic Plan

This document will outline the framework for trials: where, how, with which tools, which roles and partners, third party legal and ethical requirements. Plans will include: Protocol for conducting “friendly” pilot study (M9); Protocol for conducting large-scale trial (M23); Protocol for conducting the feasibility study (M28). This deliverable will link to milestone 1.

Due date is month 9 with updates in months 23 and 39.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Whitepaper: Needs & Requirements of ProACT IC for Multimorbidity Care & Support

This will be a public document addressed to any stakeholder in the value chain in order to identify challenges that have both socio-economic as well as scientific-technological domains. Report will also be update in month 39.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Report specifying the conditions for effective behaviour change with ICT-AT in ProACT (D4.1 Part B)

Update 1 of 2 to D4.1: Report specifying the conditions for effective behavioural change with ICT-AT in ProACT

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25

Evaluation report on outcomes from pilot trial

Evaluation report on outcomes from the pilot trial.

Programme: H2020-EU.3.1.6. - Topic(s): PHC-25-2015

download deliverable 

Documents, reports 2020-02-25