Opendata, web and dolomites

TO-SYN-FUEL project deliverables

The page lists 7 deliverables related to the research project "TO-SYN-FUEL".

 List of Deliverables

TO-SYN-FUEL: list of downloadable deliverables.
title and desprition type last update

Feedstock composition and system mass/energy balance

Feedstock composition and system mass/energy balance. To determine feedstock composition and mass/energy balances to inform design specifications and
reactor design limits. This task will also establish mass and energy balances for the system to understand flowrates, and process heat/cooling demands. Results and operational experience from a dedicated 30kg/h pilot plant at FRA will be used as guidelines for the design. To be carried out until M4. Refers to task 2.1

Programme: H2020-EU.3.3.3. - Topic(s): LCE-19-2016-2017

download deliverable 

Documents, reports 2019-05-30

Branding materials

Visual identity and project branding material. All partners will be provided with these materials and will be asked to distribute it at events, workshops and all other opportunities to raise awareness on the project. This is to be completed between months 1 and 4 and refers to task 9.2

Programme: H2020-EU.3.3.3. - Topic(s): LCE-19-2016-2017

download deliverable 

Other 2019-05-30

Map and quantification of all inputs and outputs for TCR 300 and integrated TCR/PSA/HDO plant

Map and quantification of all inputs and outputs for TCR 300 and
integrated TCR/PSA/HDO plant. Data will be collected from demonstration-scale facilities (WP 3 and 4) to quantify relevant energy and material inputs and outputs of the TCR/PSA/HDO system and create an inventory referred to the functional unit. The
data will be used to map the inputs and outputs of each process which will be used for the LCA modelling. This is to be completed between months 10-15. Refers to task 6.3

Programme: H2020-EU.3.3.3. - Topic(s): LCE-19-2016-2017

download deliverable 

Documents, reports 2019-05-15

State of the art LCA model for TCR application selected

State of the art LCA model for TCR application selected. Establishment of state of the art LCA approaches applied to bio-refinery systems will be assessed and taken into
consideration for the selection process. A full LCA review publication will be disseminated through this task. This will be completed between months 1 and 6. Refers to task 6.1

Programme: H2020-EU.3.3.3. - Topic(s): LCE-19-2016-2017

download deliverable 

Documents, reports 2019-05-15

Definition of scope of sustainability metrics

Definition of scope of sustainability metrics. The will define the scope of the LCA in order to determine the methods and the choices that will be adopted during the study.
This is to be completed between months 5 and 10. Refers to task 6.2

Programme: H2020-EU.3.3.3. - Topic(s): LCE-19-2016-2017

download deliverable 

Documents, reports 2019-05-15

Catalogue of regulatory issues

Catalogue of regulatory issues. An intelligence and preparatory action aimed at collecting and sharing specific knowledge to better implement project actions and successful solutions delivered by the project in the follow up. The final output
is a document and a highly informative, easy to use and simple database. The results will be instrumental to T8.2 and T8.3. This is to be completed in months 3 and 14. Refers to task 8.4

Programme: H2020-EU.3.3.3. - Topic(s): LCE-19-2016-2017

download deliverable 

Documents, reports 2019-05-15

Website and social media feeds online

Website and social media feeds online. A project’s website will be published by month 3, in order to raise awareness about the project’s activities. All the website content will be promoted via social media (mainly linkedin and twitter) and electronic newsletter Social media engagement will be sought also through the launch of initiatives such as hashtags to engage with the general public, surveys and spontaneous public consultations among social media users (mainly Linkedin, Twitter). This will be completed between months 1 and 3 and refers to task 9.3

Programme: H2020-EU.3.3.3. - Topic(s): LCE-19-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30