The page lists 19 deliverables related to the research project "TotalControl".

 List of Deliverables

TotalControl: list of downloadable deliverables.
title and desprition type last update

Second project video

Each year a short video (24 min) will be produced presenting core aspects or achievements of the project. This is the second video.

The deliverable is referring to task 5.1 and 5.2.

Measure of success: 1 of 4 videos available to the public at the TotalControl website.

Participants actions: DTU will work with professional videomakers to produce the video. Project partners will contribute to the content and take part in the videos as relevant.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2020-03-24

Tower load reduction with LiDAR-assisted control

Adaptation and tuning of LiDAR-based control for 7MW turbine; simulation test results; controller software update for implementation on 7MW turbine; brief report.

The deliverable is referring to task 3.1.5.

Measure of success: Simulation results demonstrating effectiveness.

Participant actions: DNVis responsible for the controller adjustments and software update, including writing the report.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Model predictive turbine control

Report on benefits and implementation issues with MPC; development of implementation suitable real-time application.

The deliverable is referring to task 3.1.4.

Measure of success: Simulation results demonstrating effectiveness and capability for real-time calculation.

Participant actions: DNV will develope a real-time scheme for MPC implementation, and write the report.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Upgrade of Fuga

Upgrade of Fuga for yawed rotors and strongly stable stratification, and report with testing and validation results.

The deliverable is referring to task 1.3.1.

Measure of success: Accuracy in new regimes with same level as Fuga accuracy in standard regimes.

Participants actions: DTU is solely responsible.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2020-03-24

SCADA-based conditions monitoring and fatigue estimation

Exploitation of the potential of conventional SCADA data for condition monitoring.

The deliverable is referring to task 2.1.4.

Measure of Success: Clarification of the potential of using SCADA data for WT condition monitoring.

Participant actions: DNV is the only actor.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Optimization of reactive power dispatch

Optimization of the reactive power dispatch between the wind turbines so that the total losses are minimized.

The deliverable is referring to task 2.3.

Measure of Success: Optimization of WPP set points conditioned on grid demands and operating conditions.

Participant actions: DTU is solely responsible.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2020-03-24

Controller adaptation for varying conditions and ancillary services

Report on turbulence-based de-rating/uprating, parameter adaptation method, implementation of delta control and fast frequency response including controller-based and inverter-based methods and implications for turbine design; controller software update for implementation on 7MW turbine.

The deliverable is referring to task 3.1.2.

Measure of success: Demonstration of effectiveness of proposed enhancements using aeroelastic simulations.

Participant actions: DNV is responsible for the controller development, simulation testing, implementation of controller changes, and writing of the report), SINTEF is responsible for the evaluation of VSM concept and effect of overpowering on turbine components. Besides that SINTEF will be contributing to the report.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Probabilistic framework to quantify the reliability levels of wind turbine structures under enhanced control methods

Statistical model setup that uses wind farm fatigue damage and power production models to predict annual reliability level and remaining lifetime of structural components of the turbine.

The deliverable is referring to task 2.4.

Measure of Success: Computationally fast quantification of reliability levels of turbine components as compared to target design level.

Participant actions: DTU is the only actor.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Project master plan including full transparency of resources, schedule and cost/performance

The purpose is to give a brief description of the appropriate procedures, the templates and the reporting tools developed for TotalControl.

The deliverable is referring to task 6.2.

Measure of success: The report contains all relevant information.

Participant actions: DTU will develop the procedures and the tools.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-10-09

Setup of the website

Setup of the project website, including collaboration and communication tools among partners, repository for dissemination material, newsletters and social networks links.

The deliverable is referring to task 5.2.

Measure of success: a full operative website.

Participant actions: DTU will design and maintain the website as well as newsletters and social media platforms to ensure that fully updated project information will be available online.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Demonstrators, pilots, prototypes 2019-10-09

Reference Wind Power Plant

Document containing the technical specifications of the Reference WPP.

The deliverable is referring to task 1.2.2.

Measure of success: Complete Reference WPP description for the subsequent simulation and testing tasks.

Participants actions: SINTEF main editor, contributions from all task participants.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-10-09

Dissemination and communication plan and annual reports on the dissemination and communication activities, 1

The dissemination plan will be monitored and updated. The dissemination and communication activities conducted in M1-12 will be summarized in an annual report to record and assess the progress in the project promotion. The annual internal workshop held within the consortium within the first 12 month of the project will be reported.

The deliverable is referring to task 5.1 and 5.3.

Measure of success: a document with the dissemination plan and workshops summarizing the dissemination activities including workshops and training activities.

Participant actions: DTU (with the support of all partners) will prepare a detail document with the dissemination plan and the annual report.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-09-02

Flow database for reference wind farm

Collection of all flow simulation results for the reference WPP.

The deliverable is referring to task 1.2.3.

Measure of success: Complete data base covering detailed wind field and WPP operation parameters for different atmospheric conditions (e.g. stability classes) and transients, publically avialable.

Participants actions: KUL, DTU, ORE will assemble the results data base. Hosted on the project website.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-09-02

Machine learning approaches to wind farm control

Report on the feasibility and applicability of machine learning approaches.

the deliverable is referring to task 1.3.4.

Measure of success: Detailed recommendations for applying the approach in practice.

Participants actions: DNV is solely reesponsible.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-09-02

Simple dynamic wind farm model

Report describing dynamic model with testing and validation results.

the deliverable is referring to task 1.3.3.

Measure of success: Simulations run rapidly enough for iterative tuning of relevant control parameters; consistency of 10-minute statistics compared to SCADA data.

Participants actions: DNV is solely responsible.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-09-02

Electro-mechanical model of reference wind power plant

Completed models of the Reference WPP in STAS and PSCAD/EMTP-RV.

The deliverable is referring to task 1.2.4.

Measure of success: STAS: calculation of reference plant modal frequencies and damping ratios, PSCAD/EMTP-RV: Compute voltage and current waveforms at the PCC.

Participants actions: SINTEF is solely responsible.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-09-02

Cost model for fatigue degradation and O&M

Development of cost models quantifying the cost of O&M and fatigue degradation of mechanical and electrical components.

The deliverable is referring to task 2.1.1, 2.1.2, and 2.2.3.

Measure of Success: Operational models that can be used to account for load effects in the development of cost optimized control schemes.

Participant actions: DVN GL is responsible for the analysis of correlation between fatigue loading and O&M), DTU is responsible for the cost model for mechanical components; and SINTEF is responsible for the cost model for electrical components.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2019-09-02

First project video

Each year a short video (24 min) will be produced presenting core aspects or achievements of the project. This is the first video.

Thedeliverable is refering to task 5.1 and 5.2.

Measure of success: 1 of 4 videos available to the public at the TotalControl website.

Participants actions: DTU will work with professional videomakers to produce the video. Project partners will contribute to the content and take part in the videos as relevant.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-09-02

Upgrade of DWM

Upgrade of the DMW for non-neutral ABL and turbine yaw control, and report with testing and validation results.

The deliverable is referring to task 1.2.5.

Measure of success: Level of accuracy reached for the new conditions compared to the current DMW accuracy for neutral non-yawed conditions.

Participants actions: DTU is solely responsible.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2019-09-02