Opendata, web and dolomites

RemovAL project deliverables

The page lists 4 deliverables related to the research project "RemovAL".

 List of Deliverables

RemovAL: list of downloadable deliverables.
title and desprition type last update

Data Management Plan

Data Management Plan (DMP) The first version of the DMP will be provided at M4 of the project. Since DMPs are expected to mature during the project, a more developed version of the plan will be included as additional deliverable at M30. This new version will include improvements based on lessons learned during the first half of the project.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-14-2016-2017

download deliverable 

Open Research Data Pilot 2020-03-06

RemovAL Project Identity, including website and logo

Launching of site and maintenance. First site version and logo delivered by M3

Programme: H2020-EU.3.5.3. - Topic(s): SC5-14-2016-2017

download deliverable 

Other 2020-03-06

Definition of Slag properties for stone wool productionne wool production

The definition includes the required range (wt.-%) of main components, a negative list (not accepted by ROCKWOOL) and a specification of required physical properties (e.g. grain size).

Programme: H2020-EU.3.5.3. - Topic(s): SC5-14-2016-2017

download deliverable 

Documents, reports 2020-03-06

Laboratory tests on alkali recovery and red mud de-alkalization for different BR

This report will include the results of the testing of different BR at lab scale (at least one publication or conference presentation is expected from this work).

Programme: H2020-EU.3.5.3. - Topic(s): SC5-14-2016-2017

download deliverable 

Documents, reports 2020-03-06