Opendata, web and dolomites

TRIANGLE project deliverables

The page lists 29 deliverables related to the research project "TRIANGLE".

 List of Deliverables

TRIANGLE: list of downloadable deliverables.
title and desprition type last update

Results of Third Open Call

This deliverable will describe the lessons learned and the results obtained during the execution of the third open call for experiments.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Implementation report on the testing framework Rel 2 and specification of Rel 3

This deliverable will report on the progress implementation achieved in the second version of the testing framework and provide the specification targeted by release 3 of the testbed. This deliverable will include inputs from developments carried out in WP3 and WP4.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Project metrics and collection of Triangle Technical Publications

Project metrics and list of scientific articles, published in international journals will be created and included on web site.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Report on the QoS management at the application level

This deliverable will contain the description of the mechanisms use to configure and control the QoS delivered by the testing framework at the application level.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Recommended TRIANGLE marks for certification of service

This deliverable will define the marks assigned after the testing process to quantify the compliance level of the applications and devices in accordance with the 5G requirements defined by NGMN and other standardization bodies.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Final test scenario and test specifications

This document reflect the final list of test scenario and specifications developed in WP2. It is not a Report as such, rather a technical phone book containing all details of each test case. The document is public and may be used for standardization activities.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

TRIANGLE testbed calibration and baseline

This deliverable will present the overall high-level TRIANGLE testing approach and a top-down description of the how the “TRIANGLE mark” is arrived when using the TRIANGLE testbed and testing framework. It will clarify the meaning of a given “TRIANGLE mark” score and how it is relative to a baseline reference. The document will report on testbed calibration activities against clearly defined reference scenarios and devices and finally report on a small-scale QoE human focus-group to verify synthetic QoE measures reported by TRIANGLE. This will be compared to real human QoE assigned MOS scores.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

TRIANGLE experiments and extensions

This deliverable will include all the 1 pager created for promoting the experimentation result on the TRIANGLE testbed

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Results of Second Open Call

This deliverable will describe the lessons learned and the results obtained during the execution of the second open call for experiments.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Implementation report on the testing framework of Rel 4

This deliverable will describe the final overall testing framework including all the tools and networking scenarios developed in WP3 and WP4 respectively.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Year 3 Periodic Report and Final Report Public Summary

These document will record the results achieved over the 3rd year project and will summarize the results achieved over the entire project lifetime.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Triangle QoE approach

This document will detail the TRIANGLE QoE approach and process of arriving at QoE metrics from atomic KPIs. The document will make clear that the TRIANGLE “MOS” scores are “synthetic” and not include a user in the testing loop.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Report on the networking capabilities provided by the testbed

This deliverable will describe 5G networking concepts supported by the testing framework.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Report on 5G evolution Y2

This deliverable will include the description of the new 5G features released by the standardization bodies. This deliverable will be used as input in the WP4 for the identification of new 5G functionalities that could be included in the testing framework.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Report on the distributed deployment of the testbed

This deliverable will detail remote access of the testing framework in order to enable its interconnection with new elements and the reuse of the current functionalities provided by the core framework.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Implementation report on the testing framework Rel 3 and specification of Rel 4

This deliverable will report on the implementation achieved in the third version of the testing framework and provide the specification targeted by release 4 of the testbed. This deliverable will include inputs from developments carried out in WP3 and WP4.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

D6.3 Project Promotional Materials

Different promotion materials including project logo will be created. This deliverable will include project information and administrative data, all presentation materials from conferences and workshops, clips of TV and radio interviews, press stories and results of the different experiments. Dates of the open call will be publicised on the web site.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Other 2019-10-29

Year 1 Periodic Report Public Summary

This document will record the results achieved after the 1st year project lifetime

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Business Plan for BaaS

A business plan for TRIANGLE sustainability using the BaaS model.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Triangle portal

The TRIANGLE project will develop a Web portal to promote, request and consume the TRIANGLE testbed services using the BaaS model.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-10-29

Formalization of the certification process, requirements and use

This deliverable will contain the formalization of the tests cases defined in WP2 for the 5G testing of applications and devices.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Report on 5G evolution

This deliverable will include the description of the new 5G features released by the standardization bodies. This deliverable will be used as input in the WP4 for the identification of new 5G functionalities that could be included in the testing framework.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Report on 5G evolution Y3

This deliverable will include the description of the new 5G features released by the standardization bodies. This deliverable will be used as input in the WP4 for the identification of new 5G functionalities that could be included in the testing framework.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Initial report on the testing scenarios, requirements and use cases

This deliverable will contain the preliminary set of 5G scenarios, requirements and use cases identified in WP2.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Results of Known experiments and First Open Call

This deliverable will contain the description of the known experiments carried out internally and those carry out during the first open call, and the lessons learned by the experimenters and the testbed operator.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Report on App lab Integration with FIRE testbed

This deliverable will describe the installation and integration of App Lab within a FIRE testbed.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Progress report on the testing framework Rel 1

This deliverable will report on the progress achieved in the first version of the testing framework with the initial deployment of existing tools for automatic flow control, measurement and reporting and user’s interfaces.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Open Call text and submission template

This deliverable will address the open call text, including the conditions and requirements for the experiments to apply for funding to become an experiment.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29

Year 2 Periodic Report Public Summary

This document will record the results achieved after the 2nd year project lifetime

Programme: H2020-EU.2.1.1. - Topic(s): ICT-12-2015

download deliverable 

Documents, reports 2019-10-29