The page lists 25 deliverables related to the research project "BRESAER".

 List of Deliverables

BRESAER: list of downloadable deliverables.
title and desprition type last update

Performance assessment in real buildings with simulated interventions

This deliverable is the result of the activities carried out in Task 6.8. BRESAER system will be evaluated by the implementation of the envelope system at model level in four virtual demo buildings.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Final report on the interaction with standardization system

This deliverable is the final result of the activities of Task 7.1.Standarization, with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution. The deliverable will resume the activities and feedback collected from the interaction with the standardization technical committees (TCs) related with the project in order to improve the development and the exploitation strategy of the project, checking the feasibility and guide the characteristics of a future standardization of the project results.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Guides for installation, commissioning and maintenance of BRESAER system

This deliverable is the final result of the activities carried out in Task 4.1. It is the guides for installation, commissioning and maintenance of BRESAER system.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Final year´s performed communication activities

According to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the last year and the conclusions of all project.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Fourth year´s performed Communication activities

According to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the fourth year.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

BRESAER system costs and payback calculations

This deliverable is the final result of the activities carried out in Task 2.4. It will define an update and refinement of the initial calculations once the envelope components are optimized and enhanced.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Future standardization proposals

This deliverable is the result of the activities of Task 7.1.Standarization, with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution. The deliverable will summarize the outcomes of the project into future new or revised standards so they can be easily found and used by the European or international industry sector and will present a list of specific standardization proposals. These proposals will fit the standardization procedures and requirements to be ready for inclusion in the development of future new standards or into revised ones.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Final version of the Data Management Plan

This deliverable provides the final version of the Data Management Plan, implemented by the consortium.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Open Research Data Pilot 2020-03-24

Performance assessment of the real demonstration

This deliverable is the result of the activities carried out in Tasks 6.2 and 6.7. It will collect the evaluation of the real demonstrator through measurements and energy modelling, inluding analysis of possible causes for any divergence between measured and calculated results.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Design guide and computer tool refined

This deliverable will be the second version of the D2.3 after a refinament process of the computer tool once used during the design phase of the demonstration stage to develop in WP6.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Other 2020-03-24

Business models definition

This deliverable will present different proposals of suitable business models that could support the commercialization of BREASAER project result. The deliverable will include also a summary of the result of the validation activities proposed in Task 7.5. The selected business models will be subject a “light” business plan (D7.17) that will also be a central part of the Exploitation Plan.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Current status of the real demonstrator with monitored results

This deliverable will collect the preliminary status of the demonstration building prior to intervention including monitoring results of a full one year.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

BRESAER system potential in Europe based on the Geo-clusters analyses

This deliverable is the result of the activities carried out in Task 2.5. It is the development of Geo-cluster maps to indicate the BRESAER technology impact\'s potential and its applicability.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Other 2020-03-24

BRESAER system tested and validated

This deliverable is the result of the activities carried out in Task 3.7. It is the validation of the BRESAER system under CPD\'s standards.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Third year´s performed Communication activities

According to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the third year.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Initial costs and payback calculations for the demonstration locations

This deliverable is the result of the initial activities carried out in Task 2.4. It will define the initial estimation of the economic impacts of the system when used in a retrofitting project.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

2nd version of the Data Management Plan

The objective of the 2nd version is to update the initial Data Management Plan, in order to fine-tune it to the data generated and the uses identified by the consortium since not all data or potential uses are clear from the start.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Open Research Data Pilot 2020-03-24

First report on the interaction with the standardization system

This deliverable is related to the activities of Task 7.1.Standarization, with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution. The deliverable will resume the activities and feedback collected, during the first 36 months of the project, from the interaction with the standardization technical committees (TCs) related with the project in order to improve the development and the exploitation strategy of the project, checking the feasibility and guide the characteristics of a future standardization of the project results.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Second year´s performed communication activities

According to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the second year.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Logistics efficiency and initial installation analysis of BRESAER system

This deliverable is the first result of the activities carried out in Task 4.1. It is the validation of the BRESAER system in terms of production, transport, workshop assembling, on-site installation and maintenance.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Preliminary constructive design

This deliverable is one of the result of the activities carried out in Task 3.1, 3.2, 3.3, 3.4 and 3.5. It will define the preliminary constructive design for each envelope component (structural elements of façade and roof, lightweight industrialized ventilated façade module, multifunctional insulation panels, combined solar thermal air and PV envelope component and dynamic window).

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Report on existing standards and standardization landscape

This deliverable is the result of the activities of Task 7.1.Standarization, with the objective of facilitate through standardization the acceptance and utilization by the market of the developed solution. The deliverable will present an identification of related applicable standards by identifying the existing standards and the on-going developments (at European and international levels) applicable to BRESAER solution. It is proposed at the very beginning of the project as it will constitute an important output that could influence the technical definition of the BRESAER system and its components.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

First year´s performed communication activities

According to the Initial Communication plan, the objective of this Deliverable is describing whole communication activities developed during the first year.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

BRESAER system conceptual design and methodology for a systemic building refurbishment

This deliverable is the result of the activities carried out in Task 2.2. It will define the conceptual design of the system, the methodology to achieve a systemic building refurbishment overview, the representative base cases to apply the system and the conceptual energy stratategies for its implementation.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24

Building Energy Management System (BEMS) definition

This deliverable will collect all the developments carried out in Task 5.1. It will be defined all the requirements of the BEMS, the ICT solutions for system controlling, the data model, and the external systems integration.

Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-02-2014

download deliverable 

Documents, reports 2020-03-24