Opendata, web and dolomites

WETFEET project deliverables

The page lists 10 deliverables related to the research project "WETFEET".

 List of Deliverables

WETFEET: list of downloadable deliverables.
title and desprition type last update

Dissemination materials for exploitation and outreach events

Dissemination materials produced for exploitation and outreach events

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Documents, reports 2019-05-31

Analysis of different potential configurations of non-rigid inter-moored devices

Report on analysis of different potential configurations of non-rigid inter-moored devices in what concerns loads, motions, risk of collision and performance of 5 non-rigid inter-moored devices

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Documents, reports 2019-05-31

Report with designs and specifications of a Symphony able to integrate the control cocoon, electro-mechanic PTO, structural membrane and dielectric generators

Report with one or more designs and specifications of a Symphony able to integrate the control cocoon, electro-mechanic PTO, structural membrane and dielectric generators

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Documents, reports 2019-05-31

Analysis of different potential configurations of rigidly inter-moored devices

Report on analysis of different potential configurations of rigidly inter-moored devices (compact aggregates) in what concerns loads, motions, risk of collision and performance

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Documents, reports 2019-05-31

Engineering challenges related to full-scale and large deployment implementation of the proposed breakthroughs

Report with engineering challenges related to full-scale and large deployment implementation of the proposed breakthroughs

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Documents, reports 2019-05-31

WETFEET website & file exchange service between partners

Fully functional WETFEET website & file exchange service between partners

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Other 2019-05-31

Designs and specifications of an OWC able to integrate the negative spring

D2.1 - Report with one or more designs and specifications of an OWC able to integrate the negative spring; enhanced added-mass; survivability submergence and dielectric generators

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Documents, reports 2019-05-31

Definition of materials and manufacturing procedure for the submerged polymeric PTO

Definition of materials and manufacturing procedure for the submerged polymeric PTO

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Documents, reports 2019-05-31

Two physical demonstration models

Two physical demonstration models for public presentations

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Dissemination plan

Dissemination plan including communication activity guidelines

Programme: H2020-EU.3.3.5. - Topic(s): LCE-01-2014

download deliverable 

Documents, reports 2019-05-31