Opendata, web and dolomites

FIESTA project deliverables

The page lists 38 deliverables related to the research project "FIESTA".

 List of Deliverables

FIESTA: list of downloadable deliverables.
title and desprition type last update

Sustainability and Business Plan V1

This deliverable will describe the sustainability plan of FIESTA, and specify the business plan that will be put in place at the project end. The deliverable will be provided in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Training, Consulting, Testing and Validation V1

This deliverable will report on the full range of training, consulting, testing and validation services that will be established and provided in FIESTA. It will reflect the outcomes of tasks T6.3 and T6.4. The deliverable will be produced in two successive iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Training, Consulting, Testing and Validation V2

This deliverable will report on the full range of training, consulting, testing and validation services that will be established and provided in FIESTA. It will reflect the outcomes of tasks T6.3 and T6.4. The deliverable will be produced in two successive iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Dissemination and Activity Report V2

This deliverable will report on the impact of the dissemination activities carried out in Task 7.1 and also provide a plan for the upcoming period. The deliverable will be produced in three year ending iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Dissemination and Activity Report V3

This deliverable will report on the impact of the dissemination activities carried out in Task 7.1 and also provide a plan for the upcoming period. The deliverable will be produced in three year ending iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Best Practices for Experiments Design and Conduction

Based on the main outcomes of the piloted experiments reported on D5.2 and the evaluation of the protocols, techniques and mechanisms to ensure interoperability, this document will show the steps and recommendations to design, deploy and evaluate interoperable IoT experiments over different IoT platforms.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Ecosystem Planning and Reporting V1

The first iteration of this deliverable will be the desk plan including the specification of processes, responsibilities and targets. The second iteration will describe and evaluate the effectiveness of the operating desk.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Ecosystem Planning and Reporting V2

The first iteration of this deliverable will be the desk plan including the specification of processes, responsibilities and targets. The second iteration will describe and evaluate the effectiveness of the operating desk.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Design of Global Market Confidence Programme on IoT interoperability

This deliverable will report on the whole range of processes and rules that will comprise the programme. It will reflect the outcome of Task T6.1.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Dissemination and Activity Report V1

This deliverable will report on the impact of the dissemination activities carried out in Task 7.1 and also provide a plan for the upcoming period. The deliverable will be produced in three year ending iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Sustainability and Business Plan V2

This deliverable will describe the sustainability plan of FIESTA, and specify the business plan that will be put in place at the project end. The deliverable will be provided in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Stakeholder Engagement Reporting V1

This deliverable will report of the successes of stakeholder engagement and report on their satisfaction with the service offering.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Stakeholder Engagement Reporting V2

This deliverable will report of the successes of stakeholder engagement and report on their satisfaction with the service offering.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Certification Suite V2

This deliverable will be the prototype implementation of the FIESTA toolkit for interoperability testing, validation and certification. A report will be delivered as well. The deliverable will be produced in two successive iterations and will reflect the outcomes of task T6.2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Experiments Implementation, Integration and Evaluation V2

This deliverable will report the initial performance results achieved over the selected experiments running on the project testbeds. The deliverable will be released in two cycles at the end of the second and third-year of the project. Following the end of the first cycles/release, experiementers will provide feedback for improving the EaaS infrastructure of the project. The second cycle/release will be based on the improved FIESTA EaaS infrastructure.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Certification Suite V1

This deliverable will be the prototype implementation of the FIESTA toolkit for interoperability testing, validation and certification. A report will be delivered as well. The deliverable will be produced in two successive iterations and will reflect the outcomes of task T6.2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Final Report

The Final Report summarises the achievements of the project and will be publically disseminated.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Experiments Implementation, Integration and Evaluation V1

This deliverable will report the initial performance results achieved over the selected experiments running on the project testbeds. The deliverable will be released in two cycles at the end of the second and third-year of the project. Following the end of the first cycles/release, experiementers will provide feedback for improving the EaaS infrastructure of the project. The second cycle/release will be based on the improved FIESTA EaaS infrastructure.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Specification and implementation of Testbed interfaces V1

This will include the results of T3.2 and will provide specification, reference implementation and demonstration of the common interfaces for integrated testbeds.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

EaaS Model Specification and Implementation V2

It will reflect the outcomes of task T4.1. It will include a prototype implementation, along with an accompanying report. The deliverable will be released in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

Specification and implementation of common Testbed interfaces V2

D3.2 Specification and implementation of common Testbed interfaces (M15, M24): This will include the results of T3.2 and will provide specification, reference implementation and demonstration of the common interfaces for integrated testbeds.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

Authentication, Authorization, Data Protection and Reservation of Resources V1

It will reflect the outcomes of task T4.2. It will include a prototype implementation, along with an accompanying report. The deliverable will be released in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

Infrastructure for Submitting and Managing IoT Experiments V2

It will reflect the outcomes of tasks T4.4 and T4.5. It will include a prototype implementation of the portal infrastructure and development/deployment/management tools, along with an accompanying report. The deliverable will be released in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Semantic models for testbeds, interoperability and mobility support and best practices V2

This will include the results of T3.1 and T3.3 and will also provide the common semantic models and interoperability evaluation tools with these tasks.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

Global Market Confidence and Certification Programme Specifications

This deliverable will report on the findings that will drive the global market confidante and certification actions.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Stakeholders Requirements

This deliverable will be the representative of the skateholders requirements to be used on the technical development of the infrastructure.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

IoT Platforms and Testbeds Analysis

This deliverable will report on the platforms and testbed analysis.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Authentication, Authorization, Data Protection and Reservation of Resources V2

It will reflect the outcomes of task T4.2. It will include a prototype implementation, along with an accompanying report. The deliverable will be released in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

EaaS Model Specification and Implementation V1

It will reflect the outcomes of task T4.1. It will include a prototype implementation, along with an accompanying report. The deliverable will be released in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

FIESTA Meta-Cloud Architecture and Technical Specifications

This deliverable, will be the guide of the development, and will report the Meta-Cloud Architecture (including the relevant directory of IoT resources) and will define the technical specification of the project.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Experiments, Tools and KPIs Specification

This deliverable will be a deliverable comprehending three parts, the specification of the Experiments, the detail of the needed tools for experimentation and the KPIs for validate the solution.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Tools and Techniques for Managing Interoperable Data sets V1

It will reflect the outcomes of task T4.3. It will include a prototype implementation, along with an accompanying report. The deliverable will be released in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Tools and Techniques for Managing Interoperable Data sets V2

It will reflect the outcomes of task T4.3. It will include a prototype implementation, along with an accompanying report. This deliverable is the second iteration.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Infrastructure for Submitting and Managing IoT Experiments V1

It will include a prototype implementation of the portal infrastructure and development/deployment/management tools, along with an accompanying report. The deliverable will be released in two iterations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Concept and Development for IoT data analytics and IoT stream and service management V1

This will include the results of the T3.4 and T3.5 and will provide description and development of common data analytics components, reasoning and linking solutions and will also include the control and adaptation solutions for IoT streams and services using real-time monitoring and management methods.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

Concept and Development for IoT data analytics and IoT stream and service management V2

This will include the results of the T3.4 and T3.5 and will provide description and development of common data analytics components, reasoning and linking solutions and will also include the control and adaptation solutions for IoT streams and services using real-time monitoring and management methods.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

Semantic models for testbeds, interoperability and mobility support and best practices V1

This will include the results of T3.1 and T3.3 and will also provide the common semantic models and interoperability evaluation tools with these tasks.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

Experiments design and specification

This report will describe the different scenarios and use cases that define an initial set of experiments according to the project lines and requirements specified in WP2, covering all project objectives.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30