Opendata, web and dolomites

EnerGAware project deliverables

The page lists 16 deliverables related to the research project "EnerGAware".

 List of Deliverables

EnerGAware: list of downloadable deliverables.
title and desprition type last update

Game Requirements

Report presenting the game requirements of the EnerGAware serious game obtained from the games preferences and expectations gathered from the Tenant Survey and the Gameplay scenarios focus groups.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Baseline monitoring and evaluation report

Report presenting the results of the assessment of the impact indicators at the end of the baseline period of the pilot implementation.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Preliminary project website

Development of a website for the project.
This project web portal will be regularly updated containing main project information, deliverables and dissemination events.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31

Energy data management, communication and processing

Report describing the energy data collection and communication middleware platform (T3.5). It also describes the data processing rules defined in T3.6.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Serious Game Beta Version

First publicly publishable version of the serious game that can be deployed as a pilot in real conditions.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Building energy consumption and thermal comfort simulation engine

Report presenting the results of T3.4.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Other 2019-05-31

User Requirements

Report presenting the user requirements of the EnerGAware serious game and the categorisation of the social housing community obtained from the analysis of the socio-economic characteristics, energy habits, learning methods, and energy efficiency and IT awareness collected by means of the Tenant Survey.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Report on dissemination activities of EnerGaware Project (First year)

This deliverable will report dissemination activities already performed and those planned for the following period, including targeted audiences, methods, timings, indicators and impact measurements.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Game design and Software specifications and architecture

Report presenting the results from T3.1 and T3.2 related to: the game design, e.g. gameplay features, and rules; and software architecture, e.g. block diagrams and flows of the game elements and data, and development specifications.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Report on dissemination activities of EnerGaware Project (Second year)

This deliverable will report dissemination activities already performed and those planned for the following period, including targeted audiences, methods, timings, indicators and impact measurements.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Serious Game Early Prototype

First (and temporary) playable version of the game, aimed at validating the basic elements of the game and prevent potential risks in the beta version development.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Pilot implementation methodology

Final version of the Report including the pilot implementation plan, results from the energy audit, design of the tailored energy data collection and communication infrastructure, description of the information and communication methods used with the social tenants participating in the pilot, and risk assessments.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Monitoring and evaluation methodology report

Report describing the impact indicators necessary to assess the impact of the EnerGAware serious game implementation, together with the calculation methods and interpretation guidelines.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Pilot implementation methodology (Preliminary)

Preliminary version of the Report including the pilot implementation plan, results from the energy audit, design of the tailored energy data collection and communication infrastructure, description of the information and communication methods used with the social tenants participating in the pilot, and risk assessments.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Building Requirements

Report presenting the building requirements of the EnerGAware serious game and energy monitoring system, and the categorisation of the social housing building stock, obtained from the analysis of the building characteristics, the energy end-uses, existence of renewable energy generation and aspects of the energy metering and data communication infrastructure, gathered by means of the Tenant Survey.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Documents, reports 2019-05-31

Final Project Web site

Game web portal integrating the project web site previously developed and the EnerGAware serious game, including web 2.0 and media tools.

Programme: H2020-EU.3.3.1. - Topic(s): EE-11-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-31