Opendata, web and dolomites

SUCCESS project deliverables

The page lists 47 deliverables related to the research project "SUCCESS".

 List of Deliverables

SUCCESS: list of downloadable deliverables.
title and desprition type last update

Report on Marketing Tools, V3

Report on marketing tools, Version 3.
This deliverable will comprise a listing and a description of the created marketing tools and usage parameters to the extent possible

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Standardisation and Policies, V2

Report on standardization and policies, Version 2.
This deliverable will list the sessions of the standards organizations and describe the work packages that were suggested for introduction in the standards.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Penetration Test Results

Penetration Tests Results.
A report on the result of the penetration testing and student hackathons, and the impact on the SUCCESS design resulting from these tests.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Smart Grid Test & certification specifications, V1

Smart Grid Test & certification specifications, Version 1

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Guidelines and blueprints for data privacy in real time energy services

Guidelines and blueprints for data privacy in real time energy services, R M30

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

The Security by Design Concept V1

\"This report will capture the work related to the initial version of the first research concept: \"\"security by design\"\". Methodology and main laboratory results based on simulation will be described.
\"

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

First Solution Architecture (SA) and Solution Description (SD), V1

First Solution Architecture (SA) and Solution Description (SD) Version 1

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Information Security Management Components and Documentation, V1

Information Security Management Components and Documentation, Version 1

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Events, V3

Report on events, Version 3.
This deliverable will provide a list of the events, and details on the planning and the organization (incl. publicity etc.).

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

SUCCESS Scalability, V2

SUCCESS scalability, Version 2.

This deliverable will comprise the final project results regarding scalability of our toolkits. SUCCESS outputs, such as anomaly and intrusion detection toolkits, will need to be market-exploitable, requiring them to be scalabile, capable of supporting millions of devices and supra-national monitoring. This report will describe the status of our work in relation to this goal.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Overarching Demo in the Lab

This report will describe the results of the simulation activity performed for an exemplary reference case that will be used to simultaneously demonstrate the three research concepts in action.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Innovative approach to data privacy for energy services

Innovative approach to data privacy for energy services.
Elaborates an innovative approach to data privacy for energy services.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Information Security Management Components and Documentation, V3

Information Security Management Components and Documentation, Version 3

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

The Survivability by Design concept

This report will capture the work related to the third research concept: survivability by design. The research methodology used and the main laboratory results, based on simulation, will be described. The deliverable will be a revision of D2.6 based on the results of the work of the second project year.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Integration and Validation Plan - Test and certification specifications, V3

Integration and Validation Plan. Test and certification specifications, Version 3.
Describes the approach to validation and planning for certification testing.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

The Resilience by Design concept V1

\"This report will capture the work related to the initial version of the second research concept: \"\"resilience by design\"\". The research methodology used and the laboratory results, based on simulation, will be described.
\"

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Events, V2

Report on events, Version 2.
This deliverable will provide a list of the events, and details on the planning and the organization (incl. publicity etc.).

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Next Generation Smart Meter, V3

Next Generation Smart Meter, R M12, M24, M30

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Description of available components for SW functions, infrastructure and related documentation, V3

Description of available components for SW functions, infrastructure and related documentation, Version 3

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Smart Grid Test & certification specifications, V2

Smart Grid Test & certification specifications, Version 2.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Standardisation and Policies, V3

Report on standardization and policies, Version 3
This deliverable will list the sessions of the standards organizations and describe the work packages that were suggested for introduction in the standards.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

First Solution Architecture (SA) and Solution Description (SD), V2

First Solution Architecture (SA) and Solution Description (SD), Version 2

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Next Generation Smart Meter, Version 2

Next Generation Smart Meter, Version 2

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Progress Report

Annual report on Project Progress, Year 2 report.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

The Survivability by Design concept V1

\"This report will capture the work related to the initial version of the third research concept: \"\"survivability by design\"\". The research methodology used and the main laboratory results, based on simulation, will be described.
\"

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Trial site planning

Trial site planning. This deliverable will provide a final report on feedback to SUCCESS designers of the operational aspects of the system design, and report on the result of the laboratory tests of component integration and scalability.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Events, V1

Report on events, Version 1.
This deliverable will provide a list of the events, and details on the planning and the organization (incl. publicity etc.).

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

SUCCESS Scalability, V1

SUCCESS scalability, Version 1.
This deliverable will comprise the initial results regarding scalability of our toolkits. SUCCESS outputs, such as anomaly and intrusion detection toolkits, will need to be market-exploitable, requiring them to be scalabile, capable of supporting millions of devices and supra-national monitoring.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Integration and Validation Plan - Test and certification specifications, V1

Integration and Validation Plan. Test and certification specifications, Version 1.
Describes the approach to validation and planning for certification testing.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Integration and Validation Plan. Test and certification specifications, V3

Integration and Validation Plan. Test and certification specifications. R M9, M15, M30

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Description of available components for SW functions, infrastructure and related documentation, V2

Description of available components for SW functions, infrastructure and related documentation, Version 2

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Operational Trial Results, V2

Operational Trials results, Version 2.
This deliverable will comprise the final results regardsing the implementation of the field trials in Ireland, Italy and Romania. This second and final version of the report on operational trial results will describe the final outcome of each of the trials.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Certification Preparation, V1

Report on Certification Preparation, Version 1.
This deliverable will describe the certification process as agreed with the advisory board. Technical details will be references in the respective documents.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

First Solution Architecture (SA) and Solution Description (SD), V3

First Solution Architecture (SA) and Solution Description (SD),Version 3

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Certification Preparation, V2

Report on Certification Preparation,Version 2.
This deliverable will describe the certification process as agreed with the advisory board. Technical details will be references in the respective documents.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

The Resilience by Design concept V2

\"This report will capture the work related to the final ebaloration of the second research concept: \"\"resilience by design\"\". The research methodology used and the laboratory results, based on simulation, will be described. This report will be a revision of D2.4 based on the results of work in second project year.
\"

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

The Security by Design concept V2

This report will capture the work related to the final elaboration of the first research concept: security by design. Methodology and main laboratory results based on simulation will be described. This deliverable will be a revision of D2.2 based on the results of the work of the Second Project year.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Marketing Tools, V1

Report on marketing tools, Version 1.
This deliverable will comprise a listing and a description of the created marketing tools and usage parameters to the extent possible

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Marketing Tools, V2

Report on marketing tools, Version 2.
This deliverable will comprise a listing and a description of the created marketing tools and usage parameters to the extent possible

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Description of available components for SW functions, infrastructure and related documentation, V1

Description of available components for SW functions, infrastructure and related documentation Version 1.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Operational Trial Results, V1

Operational Trials results, Version 1
This deliverable will comprise the initial results regardsing the implementation of the field trials in Ireland, Italy and Romania. This first version of the report on operational trial results will describe the preparatory work for the trials, use case evaluation criteria and the trial design and security assessment methodologies.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Integration and Validation Plan - Test and certification specifications, V2

Integration and Validation Plan. Test and certification specifications, Version 2.
Describes the approach to validation and planning for certification testing.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Information Security Management Components and Documentation, V2

Information Security Management Components and Documentation, Version 2

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Report on Standardisation and Policies, V1

Report on standardization and policies, Version 1.
This deliverable will list the sessions of the standards organizations and describe the work packages that were suggested for introduction in the standards.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Integration and Validation Plan. Test and certification specifications, V2

Integration and Validation Plan. Test and certification specifications, Version 2.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Next Generation Smart Meter, V1

Next Generation Smart Meter, Version 1

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31

Integration and Validation Plan. Test and certification specifications, V1

Integration and Validation Plan. Test and certification specifications Version 1.

Programme: H2020-EU.3.7. - Topic(s): DRS-12-2015

download deliverable 

Documents, reports 2019-05-31