The page lists 29 deliverables related to the research project "WYRED".

 List of Deliverables

WYRED: list of downloadable deliverables.
title and desprition type last update

Year 2 Quality and Evaluation Annual report

Annual evaluation of project processes and outcomes.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-03-06

Second cycle Activity artefacts collection

Second cycle Activity artefacts collection

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-03-06

Participant Protection Policy v4

The document wil be developed in parallel to the other process definition, but separate to give appropriate emphasis to the ethical dimension.
It will follow the same iterative structure as the hadbook.

The final version will be delivered in M36.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-02-20

Second networking report

Networking reports (D4.3-D4.4) will collect the results of tasks 4.4 and 4.5.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-02-20

Inclusion report 2

The Inclusion reports (D2.2 - D2.4) will be delivered at the end of each project year with the results of the work package implementation.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-02-20

Key research questions v2

Key research questions v2

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-02-20

Corpus of session reports v2

The Corpus of session reports collects the results of the synchronous and asynchronous dialogue sessions and the analysis of the data generated by the process.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-02-20

Participant Protection Policy v3

The document wil be developed in parallel to the other process definition, but separate to give appropriate emphasis to the ethical dimension.
It will follow the same iterative structure as the hadbook.

The 3rd version will be delivered in M24.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-02-20

Inclusion report 3

The Inclusion reports (D2.2 - D2.4) will be delivered at the end of each project year with the results of the work package implementation.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-02-20

Second cycle Activity toolkit

The toolkit of generative research activities (templates and guidelines) will be put together by the lead research partner in collaboration with some of the youth partners. This will be made available on the WYRED platform.
The activity toolkits will be delivered according to the two cycles implementation.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Other 2020-02-20

Platform v3

The Web-based platform, the mobile app and the suite of analytics instruments will be developed according to the Task 3.2 and will be delivered and upgraded through the 3 versions (M6, M19 and M36).

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-02-20

Training actions

They are a set of actions close related with ethical issues involved in the project and the need to raise awareness among the participants about data protection, privacy, safguarding and other issues.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Other 2020-01-31

Participant Protection Policy v1

The document wil be developed in parallel to the other process definition, but separate to give appropriate emphasis to the ethical dimension.
It will follow the same iterative structure as the hadbook.

The 1st version will be delivered in M2.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

Evaluation and quality plan

Design of the overall evaluation approach and array of specific quality control procedures.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

Corpus of session reports v1

The Corpus of session reports collect the results of the synchronous and asynchronous dialogue sessions and the analysis of the data generated by the process.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

Inclusion report 1

The Inclusion reports (D2.2 - D2.4) will be delivered at the end of each project year with the results of the work package implementation.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

First cycle Activity artefacts collection

Artefacts of different kinds, such as videos, sculptures, publications, music, reports, and images, produced during the participant research phase, will be initially stored in the group spaces, and then in the WYRED knowledge base.
The artefacts collections will be delivered according to the two cycles implementation.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-01-31

Network manifesto

Network manifesto (D4.1). It has the objective to make the WYREd activities comprehensible to potential participants.
It will be delivered early so to engage a sufficient critical mass of young participants in the first and second cycles of WYRED activity.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

Platform v1

The Web-based platform, the mobile app and the suite of analytics instruments will be developed according to the Task 3.2 and will be delivered and upgraded through the 3 versions (M6, M19 and M36).

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-01-31

Initial networking report

Networking reports (D4.3-D4.4) will collect the results of tasks 4.4 and 4.5.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

WYRED Association Articles

Set-up of the WYRED Association at the midpoint of the project, after the 1st cycle is finished.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

Participant Protection Policy v2

The document wil be developed in parallel to the other process definition, but separate to give appropriate emphasis to the ethical dimension.
It will follow the same iterative structure as the hadbook.

The 2nd version will be delivered in M12.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

First Cycle Recommendations collection

The recommendations contained in the reports will be proposed in different formats (videos/reports/artefacts) by the research partners and the young participants in the research consortium.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

Key research questions v1

The Key research questions are the prioritised list of questions, selected among the lists of questions generated by the tasks 5.2 and 5.3 in each country.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

First cycle Activity toolkit

The toolkit of generative research activities (templates and guidelines) will be put together by the lead research partner in collaboration with some of the youth partners. This will be made available on the WYRED platform.
The activity toolkits will be delivered according to the two cycles implementation.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Other 2020-01-31

Platform v2

The Web-based platform, the mobile app and the suite of analytics instruments will be developed according to the Task 3.2 and will be delivered and upgraded through the 3 versions (M6, M19 and M36).

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-01-31

Logo

The design of a logo and slogan for the network is part of the engagement activities.
A competition will be designed.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-01-31

Year 1 Quality and Evaluation Annual report

Annual evaluation of project processes and outcomes.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 

Documents, reports 2020-01-31

Inclusion criteria

It describes the definition of the scope of the work and the key inclusion and diversity bench marks and criteria for the project.

Programme: H2020-EU.3.6.1.2. - Topic(s): REV-INEQUAL-10-2016

download deliverable 