Opendata, web and dolomites

RE-SERVE project deliverables

The page lists 49 deliverables related to the research project "RE-SERVE".

 List of Deliverables

RE-SERVE: list of downloadable deliverables.
title and desprition type last update

Report on validation of ICT concepts using live 5G network, gateway and Pan-European infrastructure, V2

This report will describe the 5G based network configuration used to the validation of services defined in Tasks 5.1 and 5.2 and the results of performance measurements made in relation to these services.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Second report on project progress

Project plans and progress with respect to the plan will be elaborated for both the project as a whole and for the individual work packages in the annual report. Challenges and changes of plan which emerged during the reporting period will be described. Progress towards the KPIs defined for project progress will be described.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Recommendations to policy makers, enterprises (business model design) and other stakeholder groups for designing regulatory frameworks and incentive systems

D6.4 ensures the economic feasibility of the analyzed energy system design and specifies recommendations to policy makers, enterprises (business model design) and other stakeholder groups for designing regulatory frameworks and incentive systems.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on Requirements on scalable ICT to implement voltage control concepts, V2

This deliverable will describe the high level design based on the requirements of the new concepts for voltage control and their relation with the 5G base ICT systems.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

WP 2 Drafting of Ancillary Services and Network codes definitions, V2

This deliverable will collect the output of the research performed in WP2 and provide input for the work in the WP6 defining the ancillary services and network code definition concerning frequency control.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Regulatory, governance and legal issues of the transition towards 100% RES, V2

This deliverable will propose a set of key regulatory principles (options) to be considered when determining the appropriate governance framework for the future electricity transmission networks (beyond 2040)

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Definitions of ancillary services and network codes, V2

This deliverable will will analyse environmental, economic and societal CSR aspects of different potential energy systems design on the basis of current designs and designs as outcomes of the other work packages (specifically the results of WP1, WP4, WP5, and WP6.1). Definitions of ancillary services and harmonised network codes will be developed with staggered deployment related to the roadmaps for RES deployment.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on the 100% renewable Irish Scenario, V2

This report is an updated of D5.7 and describes the simulation experience performed extrapolating a futuristic scenario of 100% renewable in Ireland. The results obtained in the first campaign in month 24 are reviewed and improved after one more year of experience.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

WP 3 Drafting of Ancillary Services and Network codes definitions, V2

This deliverable will summarise the output of the research performed in WP3 and provide relevant input for the work in the WP6 defining the ancillary services and network code definition concerning voltage control.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Definition of ICT requirements for Linear Swing Dynamic Operations, V2

This deliverable covers the investigation of the ICT requirements of the new concepts for frequency control and relates them to the capabilities of 5G base ICT systems. The communications and energy architectures required for use of the concepts in relation to the test-bed experiments of WP 5 will be defined.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Adaption of research concepts based on simulation, live ICT tests and field trial results, V2

This report is the last version of a series of reports that incrementally describe the process of transferring the knowledge from the simulation to the field. Here we plan to capture the complete process that happened through the project including three complete iterations between theory and implementation

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on trial of frequency control in Laboratory and validation of initial network codes and ancillary service definitions, V2

This last version of the report D5.2 is providing conclusions on the use of high reporting rate synchronized measurements on wide area as enabler of RES participation in the frequency control operation.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on events

Reports on the RE-SERVE events organised by FEN will be released regularly at the end of every project year. Details about the carried out activities, the groups of interest involved and the response of the audience will be reported. Based on the feedbacks received, planned changes for improvements to be implemented in the coming events will be described.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

CSR impact of business models and energy systems for the transition towards 100% RES, V2

The new energy system designs will result in societal, economic and environmental consequences which need to be thoroughly measured and assessed. Based on the analysis of these consequences, D6.4 will provide the second version of the CSR guidelines for the development of business models and energy system designs that inherent trade-offs into account updating the preliminary results of D6.3.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on field trial of voltage control concepts in Ireland and validation of initial network codes and ancillary service definitions, V3

Feed back that would have been continuously provided to WP1,2&3 during months 24 and 36 on potential optimisations and adaptations to concepts which could be made, will be recorded in this V3 of D5.2. Following a number of adaptations, verification of the activities will be undertaken, and this report shall capture the process of adapting and optimising codes by simulating over the WP5 laboratory infrastructure. Concepts outlined in WP1,2&3 will be affirmed based on the outcome of simulations involving real-time data.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Review of relevance of current techniques to advanced frequency control

The deliverable will extend the concept of virtual inertia, within a frequency reserves containment framework, by extensively using real-time information on the frequency level, the frequency variation (RoCOF) and the active power unbalance in specific areas. The control resources will be based on aggregated individual efforts, with metrological measurements of provided services and with quality of service monitoring. The control resources will be based on aggregated individual efforts, with metrological measurements of provided services and with quality of service monitoring.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

5G extended functionality development to support voltage and frequency control

This deliverable will describe the functionality existing and for future development in 5G systems in relation to the requirements of the power network for local distributed processing of grid voltage and frequency data and to manage network capabilities.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on the 100% renewable Irish Scenario, V1

This reports describes the simulation experience performed extrapolating a futuristic scenario of 100% renewable in Ireland. Using the experience of the smaller scale field experience and using the theory developed for frequency and voltage control, a complete analysis of the futuristic scenario is performed from the point of view of power systems dynamics.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Definitions of ancillary services and network codes, V1

This deliverable will will analyse environmental, economic and societal CSR aspects of different potential energy systems design on the basis of current designs and designs as outcomes of the other work packages (specifically the results of WP1, WP4, WP5, and WP6.1). Definitions of ancillary services and harmonised network codes will be developed with staggered deployment related to the roadmaps for RES deployment.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Demonstration of prototype of Laboratory infrastructure

This documents collects the specification for the laboratory interconnection infrastructure. The report details the protocol adopted for the laboratory interconnection as well as the data structure used for the communication.
Requirements in terms of time delay performance are also discussed in relation to the simulation requirements.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Functionality of the releases of the real time solver, V2

This reports describes the functionality of the second release of the open-source dynamic phasor solver. Any change in the algorithms adopted for the simulation are described together with the new version of the model library.
A second version of the code will also made available within the consortium.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on field trial of voltage control concepts in Ireland and validation of initial network codes and ancillary service definitions, V2

Building on concepts derived by month 12 in WP1, 2 & 3, this report will highlight how WP5 will operationalise, implement and validate a selection of frequency control concepts in the available infrastructure. This is report shall also highlight how the relevant and selected real-time data from WP5 partners can be integrated and added to the laboratory environment, with due consideration given to market operations and privacy constraints. Feedback on progress will be communicated back to WP\'s 1,2&3 to ensure that definitions and concepts can be adapted to the real constraints of electrical and ICT environments.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

First interconnection test of the nodes in pan-European simulation platform

This reports described the experimental results performed by the three partners of the project providing simulation infrastructure: RWTH, POLITO, UCD.
The reports details the measurement of the performance of the laboratory interface as well as the first test of the new simulation platform developed within the project

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Power Electronics Stability Criteria for AC Three Phase Systems

This reports describes the first results in the direction to define a system level stability criteria for power electronics based power-system. The theory was mostly developed for DC systems and here substantial changes are introduced to cover the three-phase AC systems. The report includes the definition of the theoretical criterion and its application to simulation setting.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Network impedance characterisation for active distribution networks

This report will detail an approach for network impedance characterisation and identification, in particular in the case of active distribution networks.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Use cases definition for research in Frequency and Voltage control

This report will describe the reference use cases scenarios that will be used as an input to WP2 and WP3 for the study of voltage and frequency control.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Requirements placed on energy systems on transition to 100% RES

This reports summarizes the requirements for the future automation system starting from the consideration of power system dynamics that represent the fundamental background.
Starting from the assumption of 100% renewable, the key dynamics are defined and quantifies to assess the challenges for the voltage and frequency control to be developed in the following WPs

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on Requirements on scalable ICT to implement voltage control concepts, V1

This deliverable will describe the high level design based on the requirements of the new concepts for voltage control and their relation with the 5G based ICT systems.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on field trial of voltage control concepts in Ireland and validation of initial network codes and ancillary service definitions, V1

This initial version of D5.1 shall report on the selection criteria for the frequency control concepts that can be trialled, and how the ancillary services and network codes can be validated on the grid demonstration across the 4 different laboratories in Europe. The report shall also offer detail on the implementation status of trial platforms and infrastructure in the form of a readiness report for activities between month 12 and 36.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

First report on project progress

Project plans and progress with respect to the plan will be elaborated for both the project as a whole and for the individual work packages in the annual report. Challenges and changes of plan which emerged during the reporting period will be described. Progress towards the KPIs defined for project progress will be described.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on trial of frequency control in Laboratory and validation of initial network codes and ancillary service definitions, V1

This initial version of D5.2. reports findings from synchronized measurements from 4 different laboratories across Europe, in view of validation of elements of the ancillary services and network codes identified in Task 5.1 . This report will analyze measurement information on frequency and ROCOF provided with heterogeneous reporting rates by project partners, based on daily data as inputs for simulation tools.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Specification for an on-line system level monitoring system

Following the work described in D3.3., this reports details the architecture of a monitoring system aimed at collecting the information needed for the stability criterion evaluation.
Data will be collected from the local sources and then processed at substation level to assess the current condition of stability. Possible feedback information can be then dispatched by the substation to the local sources.
The reports formally describes the architecture, the ICT requirements and the algorithm implementation.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

CSR impact of business models and energy systems for the transition towards 100% RES, V1

The new energy system designs will result in societal, economic and environmental consequences which need to be thoroughly measured and assessed. Based on the analysis of these consequences, D6.3 will provide the first version of the CSR guidelines for the development of business models and energy system designs that inherent trade-offs into account.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Functionality of the releases of the real time solver, V1

This reports describes the functionality of the first release of the open-source dynamic phasor solver. The main algorithms adopted for the simulation are described together with the models implemented in the library after 12 months of the project.
A first version of the code will also made available within the consortium.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Definition of ICT requirements for Linear Swing Dynamic Operations, V1

This deliverable covers the investigation of the ICT requirements of the new concepts for frequency control and relates them to the capabilities of 5G base ICT systems. The communications and energy architectures required for use of the concepts in relation to the test-bed experiments of WP 5 will be defined.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on fostering support for RE-SERVE codes and ancillary services

This report will describe the activities carried out in the Task 7.2 in order to promote the RE-SERVE harmonised network codes and enhanced system services between the DSOs, Stakeholders and the Advisory Board. Feedback and suggestions of the target groups will be also collected and included in the report.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Requirements placed on ICT for energy systems with up to 100% RES

This deliverable will describe the relationship between the power network architectures being considered by the project for up to 100% RES integration and the ICT architectures and capabilities needed to implement them. The ICT architectures will focus on the use of 5G wireless communications capabilities.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Adaption of research concepts based on simulation, live ICT tests and field trial results, V1

This report is the first of a series of reports that incrementally describe the process of transferring the knowledge from the simulation to the field. The idea is to work with a set of feedback loops in which the theoretical knowledge is improved by the experience in the field. We plan to update this report every six months. This is the first version.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

WP 3 Drafting of Ancillary Services and Network codes definitions, V1

This deliverable will summarise the output of the research performed in WP3 and provide relevant input for the work in the WP6 defining the ancillary services and network code definition concerning voltage control.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Scenarios & architectures for 100% RES and roles of sector actors,

This report summarizes the possible steps of integration of renewables, in particular into the use cases (Irish and Romanian networks), up to 100% of penetration. It summarizes also the results of the analysis of the role shift of the main actors and of new players.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Power Electronics System-level stability criteria

This reports describes the third step in the theoretical development of a stability criterion for power electronics based power system. After focusing on three-phase AC systems and multi-source case, here we bring the theory to the last step defining a system-level criterion able to guarantee voltage stability on a fully power electronic driven.
The theory is presented, documented and supported by simulation results

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Linear Swing Dynamics definition

The objective of this deliverable is to define state-of-the-art models of frequency dynamics and other frequency controllers of non-synchronous devices and study their impact on the behaviour of the power system. The main model that will be utilised is the conventional transient stability model and will use the results of Deliverable 2 of Task 1 to properly simulate the behaviour of the bus frequency during the transients. Simulations will be solved using a probabilistic approach.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Regulatory, governance and legal issues of the transition towards 100% RES, V1

This deliverable will propose a set of key regulatory principles (options) to be considered when determining the appropriate governance framework for the future electricity transmission networks (beyond 2040)

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

5G extended functionality integration and testing in pan-European Simulation Infrastructure

This deliverable will describe the integration of the created gateway elements and application software elements with the communication infrastructure, including the 5G mobile core network hosted at Ericsson sites, and the RTDS simulation facilities at ACS in RWTH, Aachen.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Demand Response and DG control considering Voltage Control and Stability

This report will detail the developed optimal control scheme for DR and DG focussing on the aspects of voltage control and stability.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on validation of ICT concepts using live 5G network, gateway and Pan-European infrastructure, V1

This report will describe the 5G based network configuration used to the validation of services defined in Tasks 5.1 and 5.2 and the results of performance measurements made in relation to these services.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Definition of frequency under high dynamic conditions

Definition of local bus frequencies during transient simulations. This definition of bus
frequency will consider the frequency as it is distributed across the network, as opposed to considering it as a global system variable (i.e., the concept of centre of inertia), which is the current status quo in power systems analysis. The definition of the frequency in this paradigm is thus closer to that of real-world devices, such as PMUs, and is based on sampling phase quantities, filtering the noise and defining the time-varying frequency of the fundamental component of the signal. These methods will be based on phasor analysis, and the accuracy of results can be compared to those found using EMT analysis which includes all fast electro-magnetic dynamics, the three-phase, possibly unbalanced models of every dynamic element of the grid, and detailed PMU models.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

Report on marketing tools

This deliverable will describe the concept for the design of marketing materials and its implementation in a range of media types.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19

WP 2 Drafting of Ancillary Services and Network codes definitions, V1

This deliverable will collect the output of the research performed in WP2 and provide input for the work in the WP6 defining the ancillary services and network code definition concerning frequency control.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-02-19