The page lists 49 deliverables related to the research project "RE-SERVE".
title and desprition | type | last update |
---|---|---|
Report on validation of ICT concepts using live 5G network, gateway and Pan-European infrastructure, V2This report will describe the 5G based network configuration used to the validation of services defined in Tasks 5.1 and 5.2 and the results of performance measurements made in relation to these services. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Second report on project progressProject plans and progress with respect to the plan will be elaborated for both the project as a whole and for the individual work packages in the annual report. Challenges and changes of plan which emerged during the reporting period will be described. Progress towards the KPIs defined for project progress will be described. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Recommendations to policy makers, enterprises (business model design) and other stakeholder groups for designing regulatory frameworks and incentive systemsD6.4 ensures the economic feasibility of the analyzed energy system design and specifies recommendations to policy makers, enterprises (business model design) and other stakeholder groups for designing regulatory frameworks and incentive systems. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on Requirements on scalable ICT to implement voltage control concepts, V2This deliverable will describe the high level design based on the requirements of the new concepts for voltage control and their relation with the 5G base ICT systems. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
WP 2 Drafting of Ancillary Services and Network codes definitions, V2This deliverable will collect the output of the research performed in WP2 and provide input for the work in the WP6 defining the ancillary services and network code definition concerning frequency control. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Regulatory, governance and legal issues of the transition towards 100% RES, V2This deliverable will propose a set of key regulatory principles (options) to be considered when determining the appropriate governance framework for the future electricity transmission networks (beyond 2040) Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Definitions of ancillary services and network codes, V2This deliverable will will analyse environmental, economic and societal CSR aspects of different potential energy systems design on the basis of current designs and designs as outcomes of the other work packages (specifically the results of WP1, WP4, WP5, and WP6.1). Definitions of ancillary services and harmonised network codes will be developed with staggered deployment related to the roadmaps for RES deployment. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on the 100% renewable Irish Scenario, V2This report is an updated of D5.7 and describes the simulation experience performed extrapolating a futuristic scenario of 100% renewable in Ireland. The results obtained in the first campaign in month 24 are reviewed and improved after one more year of experience. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
WP 3 Drafting of Ancillary Services and Network codes definitions, V2This deliverable will summarise the output of the research performed in WP3 and provide relevant input for the work in the WP6 defining the ancillary services and network code definition concerning voltage control. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Definition of ICT requirements for Linear Swing Dynamic Operations, V2This deliverable covers the investigation of the ICT requirements of the new concepts for frequency control and relates them to the capabilities of 5G base ICT systems. The communications and energy architectures required for use of the concepts in relation to the test-bed experiments of WP 5 will be defined. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Adaption of research concepts based on simulation, live ICT tests and field trial results, V2This report is the last version of a series of reports that incrementally describe the process of transferring the knowledge from the simulation to the field. Here we plan to capture the complete process that happened through the project including three complete iterations between theory and implementation Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on trial of frequency control in Laboratory and validation of initial network codes and ancillary service definitions, V2This last version of the report D5.2 is providing conclusions on the use of high reporting rate synchronized measurements on wide area as enabler of RES participation in the frequency control operation. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on eventsReports on the RE-SERVE events organised by FEN will be released regularly at the end of every project year. Details about the carried out activities, the groups of interest involved and the response of the audience will be reported. Based on the feedbacks received, planned changes for improvements to be implemented in the coming events will be described. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
CSR impact of business models and energy systems for the transition towards 100% RES, V2The new energy system designs will result in societal, economic and environmental consequences which need to be thoroughly measured and assessed. Based on the analysis of these consequences, D6.4 will provide the second version of the CSR guidelines for the development of business models and energy system designs that inherent trade-offs into account updating the preliminary results of D6.3. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on field trial of voltage control concepts in Ireland and validation of initial network codes and ancillary service definitions, V3Feed back that would have been continuously provided to WP1,2&3 during months 24 and 36 on potential optimisations and adaptations to concepts which could be made, will be recorded in this V3 of D5.2. Following a number of adaptations, verification of the activities will be undertaken, and this report shall capture the process of adapting and optimising codes by simulating over the WP5 laboratory infrastructure. Concepts outlined in WP1,2&3 will be affirmed based on the outcome of simulations involving real-time data. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Review of relevance of current techniques to advanced frequency controlThe deliverable will extend the concept of virtual inertia, within a frequency reserves containment framework, by extensively using real-time information on the frequency level, the frequency variation (RoCOF) and the active power unbalance in specific areas. The control resources will be based on aggregated individual efforts, with metrological measurements of provided services and with quality of service monitoring. The control resources will be based on aggregated individual efforts, with metrological measurements of provided services and with quality of service monitoring. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
5G extended functionality development to support voltage and frequency controlThis deliverable will describe the functionality existing and for future development in 5G systems in relation to the requirements of the power network for local distributed processing of grid voltage and frequency data and to manage network capabilities. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on the 100% renewable Irish Scenario, V1This reports describes the simulation experience performed extrapolating a futuristic scenario of 100% renewable in Ireland. Using the experience of the smaller scale field experience and using the theory developed for frequency and voltage control, a complete analysis of the futuristic scenario is performed from the point of view of power systems dynamics. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Definitions of ancillary services and network codes, V1This deliverable will will analyse environmental, economic and societal CSR aspects of different potential energy systems design on the basis of current designs and designs as outcomes of the other work packages (specifically the results of WP1, WP4, WP5, and WP6.1). Definitions of ancillary services and harmonised network codes will be developed with staggered deployment related to the roadmaps for RES deployment. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Demonstration of prototype of Laboratory infrastructureThis documents collects the specification for the laboratory interconnection infrastructure. The report details the protocol adopted for the laboratory interconnection as well as the data structure used for the communication. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Functionality of the releases of the real time solver, V2This reports describes the functionality of the second release of the open-source dynamic phasor solver. Any change in the algorithms adopted for the simulation are described together with the new version of the model library. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on field trial of voltage control concepts in Ireland and validation of initial network codes and ancillary service definitions, V2Building on concepts derived by month 12 in WP1, 2 & 3, this report will highlight how WP5 will operationalise, implement and validate a selection of frequency control concepts in the available infrastructure. This is report shall also highlight how the relevant and selected real-time data from WP5 partners can be integrated and added to the laboratory environment, with due consideration given to market operations and privacy constraints. Feedback on progress will be communicated back to WP\'s 1,2&3 to ensure that definitions and concepts can be adapted to the real constraints of electrical and ICT environments. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
First interconnection test of the nodes in pan-European simulation platformThis reports described the experimental results performed by the three partners of the project providing simulation infrastructure: RWTH, POLITO, UCD. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Power Electronics Stability Criteria for AC Three Phase SystemsThis reports describes the first results in the direction to define a system level stability criteria for power electronics based power-system. The theory was mostly developed for DC systems and here substantial changes are introduced to cover the three-phase AC systems. The report includes the definition of the theoretical criterion and its application to simulation setting. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Network impedance characterisation for active distribution networksThis report will detail an approach for network impedance characterisation and identification, in particular in the case of active distribution networks. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Use cases definition for research in Frequency and Voltage controlThis report will describe the reference use cases scenarios that will be used as an input to WP2 and WP3 for the study of voltage and frequency control. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Requirements placed on energy systems on transition to 100% RESThis reports summarizes the requirements for the future automation system starting from the consideration of power system dynamics that represent the fundamental background. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on Requirements on scalable ICT to implement voltage control concepts, V1This deliverable will describe the high level design based on the requirements of the new concepts for voltage control and their relation with the 5G based ICT systems. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on field trial of voltage control concepts in Ireland and validation of initial network codes and ancillary service definitions, V1This initial version of D5.1 shall report on the selection criteria for the frequency control concepts that can be trialled, and how the ancillary services and network codes can be validated on the grid demonstration across the 4 different laboratories in Europe. The report shall also offer detail on the implementation status of trial platforms and infrastructure in the form of a readiness report for activities between month 12 and 36. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
First report on project progressProject plans and progress with respect to the plan will be elaborated for both the project as a whole and for the individual work packages in the annual report. Challenges and changes of plan which emerged during the reporting period will be described. Progress towards the KPIs defined for project progress will be described. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on trial of frequency control in Laboratory and validation of initial network codes and ancillary service definitions, V1This initial version of D5.2. reports findings from synchronized measurements from 4 different laboratories across Europe, in view of validation of elements of the ancillary services and network codes identified in Task 5.1 . This report will analyze measurement information on frequency and ROCOF provided with heterogeneous reporting rates by project partners, based on daily data as inputs for simulation tools. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Specification for an on-line system level monitoring systemFollowing the work described in D3.3., this reports details the architecture of a monitoring system aimed at collecting the information needed for the stability criterion evaluation. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
CSR impact of business models and energy systems for the transition towards 100% RES, V1The new energy system designs will result in societal, economic and environmental consequences which need to be thoroughly measured and assessed. Based on the analysis of these consequences, D6.3 will provide the first version of the CSR guidelines for the development of business models and energy system designs that inherent trade-offs into account. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Functionality of the releases of the real time solver, V1This reports describes the functionality of the first release of the open-source dynamic phasor solver. The main algorithms adopted for the simulation are described together with the models implemented in the library after 12 months of the project. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Definition of ICT requirements for Linear Swing Dynamic Operations, V1This deliverable covers the investigation of the ICT requirements of the new concepts for frequency control and relates them to the capabilities of 5G base ICT systems. The communications and energy architectures required for use of the concepts in relation to the test-bed experiments of WP 5 will be defined. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on fostering support for RE-SERVE codes and ancillary servicesThis report will describe the activities carried out in the Task 7.2 in order to promote the RE-SERVE harmonised network codes and enhanced system services between the DSOs, Stakeholders and the Advisory Board. Feedback and suggestions of the target groups will be also collected and included in the report. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Requirements placed on ICT for energy systems with up to 100% RESThis deliverable will describe the relationship between the power network architectures being considered by the project for up to 100% RES integration and the ICT architectures and capabilities needed to implement them. The ICT architectures will focus on the use of 5G wireless communications capabilities. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Adaption of research concepts based on simulation, live ICT tests and field trial results, V1This report is the first of a series of reports that incrementally describe the process of transferring the knowledge from the simulation to the field. The idea is to work with a set of feedback loops in which the theoretical knowledge is improved by the experience in the field. We plan to update this report every six months. This is the first version. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
WP 3 Drafting of Ancillary Services and Network codes definitions, V1This deliverable will summarise the output of the research performed in WP3 and provide relevant input for the work in the WP6 defining the ancillary services and network code definition concerning voltage control. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Scenarios & architectures for 100% RES and roles of sector actors,This report summarizes the possible steps of integration of renewables, in particular into the use cases (Irish and Romanian networks), up to 100% of penetration. It summarizes also the results of the analysis of the role shift of the main actors and of new players. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Power Electronics System-level stability criteriaThis reports describes the third step in the theoretical development of a stability criterion for power electronics based power system. After focusing on three-phase AC systems and multi-source case, here we bring the theory to the last step defining a system-level criterion able to guarantee voltage stability on a fully power electronic driven. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Linear Swing Dynamics definitionThe objective of this deliverable is to define state-of-the-art models of frequency dynamics and other frequency controllers of non-synchronous devices and study their impact on the behaviour of the power system. The main model that will be utilised is the conventional transient stability model and will use the results of Deliverable 2 of Task 1 to properly simulate the behaviour of the bus frequency during the transients. Simulations will be solved using a probabilistic approach. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Regulatory, governance and legal issues of the transition towards 100% RES, V1This deliverable will propose a set of key regulatory principles (options) to be considered when determining the appropriate governance framework for the future electricity transmission networks (beyond 2040) Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
5G extended functionality integration and testing in pan-European Simulation InfrastructureThis deliverable will describe the integration of the created gateway elements and application software elements with the communication infrastructure, including the 5G mobile core network hosted at Ericsson sites, and the RTDS simulation facilities at ACS in RWTH, Aachen. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Demand Response and DG control considering Voltage Control and StabilityThis report will detail the developed optimal control scheme for DR and DG focussing on the aspects of voltage control and stability. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on validation of ICT concepts using live 5G network, gateway and Pan-European infrastructure, V1This report will describe the 5G based network configuration used to the validation of services defined in Tasks 5.1 and 5.2 and the results of performance measurements made in relation to these services. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Definition of frequency under high dynamic conditionsDefinition of local bus frequencies during transient simulations. This definition of bus Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
Report on marketing toolsThis deliverable will describe the concept for the design of marketing materials and its implementation in a range of media types. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |
WP 2 Drafting of Ancillary Services and Network codes definitions, V1This deliverable will collect the output of the research performed in WP2 and provide input for the work in the WP6 defining the ancillary services and network code definition concerning frequency control. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-19 |