The page lists 16 deliverables related to the research project "RINGO".

 List of Deliverables

RINGO: list of downloadable deliverables.
title and desprition type last update

Periodic Report 1 including request for first interim payment

Periodic Report 1 including request for first interim payment

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-25

Final Data Management Plan

The project data management plan will be developed during the first six months of the project and show the close connection to the ICOS RI operational data management. It is envisaged that the data obtained in the framework of the RINGO project will be published under the same conditions as ICOS data. ICOS has decided to use the Creative Commons 4.0 BY license that ensures open and free data access.The final data mangement plan will also include archiving solutions.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-25

Final Risk Management Plan

Risk Management Plan will be updated twice a year in terms of risks identified and impact/likelihood and presented half-yearly to EB and yearly to General Assembly. Final risk management plan will focus on the final deliverables and transfer of results into the operations of ICOS RI.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-25

Final Dissemination Strategy

The Dissemination Strategy for the RINGO project will be drafted in the first six months and updated twice during the course of the project. The final dissemination startegy will focus on the final results and deliverables achieved during the project.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-25

Ocean-atmosphere flux NRT data calculation routine including satellite data streams on surface temperature, skin effects, wave state and wind speeds.

D1.6 Ocean-atmosphere flux NRT data calculation routine including satellite data streams on surface temperature, skin effects, wave state and wind speeds. (UoE)

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Demonstrators, pilots, prototypes 2020-04-24

First Updated Data Management Plan

The project data management plan will be developed during the first six months of the project and show the close connection to the ICOS RI operational data management. It is envisaged that the data obtained in the framework of the RINGO project will be published under the same conditions as ICOS data. ICOS has decided to use the Creative Commons 4.0 BY license that ensures open and free data access. The first update will reflect practicalities of this process during the first period.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-24

Concept for ICOS involvement in carbon and GHG flagship inside GEO and IG3IS program by WMO.

ICOS ERIC will steer the cooperation process and develop official relationships with partner institutions. An international cooperation of regional Networks is envisaged and should be based on official cooperation documents (e.g. Memorandums of Understanding). The report will described the achievements of ICOS ERIC in managing the further development of this cooperation and integration of ICOS into the framework of GEO and IG3IS.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-24

Online platform as part of ICOS webpages including technical and scientific training material.

Online platform as part of ICOS webpages including technical and scientific training material. (M12)

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-04-24

First Updated Project Dissemination

The Dissemination Strategy for the RINGO project will be drafted in the first six months and updated twice during the course of the project. The first update will take early developments in the project into account.
The dissemination of results will be integrated in the general dissemination strategy of ICOS. A detailed dissemination plan will be developed during the first six months of the project. The Dissemination Strategy for the RINGO project will comprise the following target groups: scientists inside and outside ICOS, related research infrastructures, national stakeholders and ESFRI, European Commission, international organisations such as UNFCCC, IPCC, WMO, GEO, general public.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-24

Concept document on collaboration with countries and stations outside European Union

Collaboration with countries and stations outside European Union can be very valuable from network design and science point of views. The concept will take specific requirements of this cooperation into account.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-24

First Updated Risk Management Plan

Risk Management Plan will be updated twice a year in terms of risks identified and impact/likelihood and presented half-yearly to EB and yearly to General Assembly. Updated risk management plan will be reported at months 18.

The project risk management will be conducted in very close connection with the overall risk management of ICOS RI and will follow the same approach. Risk Management Plan is created during the first six months of the project implementation containing identification, classification (for probability and impact) and mitigation measures in consultation with the Work Package and Task Leaders. Risks are categorized using the scoring based on their probability of occurrence and impact on the overall project, deliverable and/or task. Mitigating actions will be tailored to limit the likelihood of the risks to occur and aimed to minimize the impact. Risk Management Plan will be monitored continuously throughout the project by Work Package and Task Leaders.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-24

Project Dissemination Strategy

The dissemination of results will be integrated in the general dissemination strategy of ICOS. A detailed dissemination plan will be developed during the first six months of the project. The Dissemination Strategy for the RINGO project will comprise the following target groups: scientists inside and outside ICOS, related research infrastructures, national stakeholders and ESFRI, European Commission, international organisations such as UNFCCC, IPCC, WMO, GEO, general public.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-24

Project website and internal communication (intranet, email-lists, telephone connections) operational.

A project website will be integrated into the ICOS website (www.icos-ri.eu), where reports can be published but also blogs and new media such as twitter will be utilized.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Demonstrators, pilots, prototypes 2020-04-24

Organisation of project Kick-off meeting, including an Executive Board and a General Assembly meeting.

The project Kick-off meeting and the first General Assembly will be organized. The General Assembly will appoint an Executive Board. Furthermore, the Kick-off meeting will be used for re-fining the work and for formulating internal milestones for enhancing project management.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Other 2020-04-24

Initial Risk Management Plan.

The project risk management will be conducted in very close connection with the overall risk management of ICOS RI and will follow the same approach. Risk Management Plan is created during the first six months of the project implementation containing identification, classification (for probability and impact) and mitigation measures in consultation with the Work Package and Task Leaders. Risks are categorized using the scoring based on their probability of occurrence and impact on the overall project, deliverable and/or task. Mitigating actions will be tailored to limit the likelihood of the risks to occur and aimed to minimize the impact. Risk Management Plan will be monitored continuously throughout the project by Work Package and Task Leaders. Risk Management Plan will be updated twice a year in terms of risks identified and impact/likelihood and presented half-yearly to EB and yearly to General Assembly.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-24

Initial Data Management Plan (DMP).

The project data management plan will be developed during the first six months of the project and show the close connection to the ICOS RI operational data management. It is envisaged that the data obtained in the framework of the RINGO project will be published under the same conditions as ICOS data. ICOS has decided to use the Creative Commons 4.0 BY license that ensures open and free data access.

Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-03-2016-2017

download deliverable 

Documents, reports 2020-04-24