Opendata, web and dolomites

SABRE project deliverables

The page lists 28 deliverables related to the research project "SABRE".

 List of Deliverables

SABRE: list of downloadable deliverables.
title and desprition type last update

D3.7 Project leaflet to identified stakeholders

Project leaflet to identified stakeholders

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-04-08

D2.4 Initial surrogate model of inertial twist and report

Initial surrogate model of inertial twist and report

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08

D1.1 Selection of baseline rotor

Selection of baseline rotor

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D1.4 S4 CA results on morphing performance

S4 CA results on morphing performance

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D1.5 Initial morphing concept design targets

Initial morphing concept design targets

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D1.3 Decide common format for exchange of surrogate models

Decide common format for exchange of surrogate models

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D3.10 Report on dissemination and exploitation strategy

Report on dissemination and exploitation strategy

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D2.7 Initial surrogate model of FishBAC

Initial surrogate model of FishBAC

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08

D3.3 SABRE Project Handbook

SABRE Project Handbook

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-04-08

D2.16 Initial active tendon surrogate model

Initial active tendon surrogate model

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08

D2.29 Interim report on negative stiffness design and optimisation

Interim report on negative stiffness design and optimisation

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D2.13 Initial surrogate model of variable chord extension

Initial surrogate model of variable chord extension

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08

D2.27 Whirl tower test proof load requirements

Whirl tower test proof load requirements

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D2.25 Wind tunnel test proof load requirements

Wind tunnel test proof load requirements

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D3.6 Public website, LinkedIn profile, and ResearchGate profile set up

Public website, LinkedIn profile, and ResearchGate profile set up

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-04-08

D1.12 Initial morphing concept CFD polars delivered to T1.2

Initial morphing concept CFD polars delivered to T1.2

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D3.5 Intra consortium website set up for SABRE

Intra consortium website set up for SABRE

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-04-08

D3.1 Partner List and copies of EC contract and Consortium Agreement.

Partner List and copies of EC contract and Consortium Agreement.

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D3.4 SABRE Project Overview Presentation

SABRE Project Overview Presentation

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-04-08

D3.8 Phase 1 Reporting (Minutes of checkpoint meeting, Activity report)

Phase 1 Reporting (Minutes of checkpoint meeting, Activity report)

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D3.9 Preliminary Design Review (PDR)

Preliminary Design Review (PDR)

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D2.10 Initial surrogate model of TRIC concept

Initial surrogate model of TRIC concept

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08

D1.11 Surrogate model of emissions versus rotor power required

Surrogate model of emissions versus rotor power required

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08

D1.6 CFD/CSD coupled analysis running

CFD/CSD coupled analysis running

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08

D3.2 Minutes of the Kick-Off meeting

Minutes of the Kick-Off meeting

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D1.10 Rotorcraft emissions model

Rotorcraft emissions model

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08

D1.2 Report on analytical adaptive rotor studies

Report on analytical adaptive rotor studies

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Documents, reports 2020-04-08

D2.1 Initial surrogate model of SMA active twist and report

Initial surrogate model of SMA active twist and report

Programme: H2020-EU.3.4. - Topic(s): MG-1.1-2016

download deliverable 

Other 2020-04-08