Opendata, web and dolomites

STOP-IT project deliverables

The page lists 7 deliverables related to the research project "STOP-IT".

 List of Deliverables

STOP-IT: list of downloadable deliverables.
title and desprition type last update

Corporate identity and general dissemination material

D9.1 consists of the corporate design for the project.

Programme: H2020-EU.3.7.4.;H2020-EU.3.7.2. - Topic(s): CIP-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-02-25

Risk Identification database

D3.2 consists in the STOP-IT risk identification database (RIDB), which provides a comprehensive list of risk event expressed by events that can impact the achievement of FR water utilities objectives defined in T 3.1. The RIDB is supported by an accompanying document describing the database content, structure and use.

Programme: H2020-EU.3.7.4.;H2020-EU.3.7.2. - Topic(s): CIP-01-2016-2017

download deliverable 

Other 2020-02-25

STOP-IT secure exchange mechanism including public warning system service

D6.2 consists of a Public Warning System (PWS) to communicate emergency states to a broad number of stakeholders.

Programme: H2020-EU.3.7.4.;H2020-EU.3.7.2. - Topic(s): CIP-01-2016-2017

download deliverable 

Other 2020-02-25

First Annual Magazine issued

D9.2 consists of the first annual magazine (a four pages brochure in A4 format) to be distributed electronically. Magazines will be released on annual basis.

Programme: H2020-EU.3.7.4.;H2020-EU.3.7.2. - Topic(s): CIP-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-02-25

Guidelines for CoPs setup and animation

\"D2.1 provides a guideline with brief definition of goals, methodologies and time planning for a co-joint participation process in STOP-IT. D 2.1. has the character of a \"\"cook book\"\" to ensure similar standards within all CoPs and case study involvements.\"

Programme: H2020-EU.3.7.4.;H2020-EU.3.7.2. - Topic(s): CIP-01-2016-2017

download deliverable 

Documents, reports 2020-02-25

Course(s) design for multiple end users and levels of expertise

D8.1 will define the main training requirements in collaboration with the end-users (FR and FL) considering inputs from the CoPs, and design specialized courses for different identified end-user profiles.

Programme: H2020-EU.3.7.4.;H2020-EU.3.7.2. - Topic(s): CIP-01-2016-2017

download deliverable 

Documents, reports 2020-02-25

Data Management Plan first version (updates in M12, 18, 24, 36, 48)

D1.3 will detail what data the project will collect and generate how it will be exploited or made accessible,and/or how it will be preserved. Updates at M12 and 24 will be delivered as internal project reports. Updates at M18, 36 and 48 will be submitted to the EC as integral part of the project periodic reports.

Programme: H2020-EU.3.7.4.;H2020-EU.3.7.2. - Topic(s): CIP-01-2016-2017

download deliverable 

Documents, reports 2020-02-25