Opendata, web and dolomites

SCOTT project deliverables

The page lists 22 deliverables related to the research project "SCOTT".

 List of Deliverables

SCOTT: list of downloadable deliverables.
title and desprition type last update

Safety-critical Sandbox (Beta)

Implementation and evaluation of formal model using model checker/big data analytics techniques – M24

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Demonstrators, pilots, prototypes 2020-03-24

Progress Report “Managed Wireless for Smart Infrastructure” Year 2

The main objective of this deliverable is to provide detailed technical description of the use case development level after year 2.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Safety-Critical Sandbox Final Specification

Augmenting Sandbox with improved model checking, plus its evaluation – M26

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Service Enabling Software Routing

This deliverable will address software enabled routing as the prerequisite for service slicing in wireless infrastructures. Novel services and their service requirements will be taken up, to address the routing requirements. As an example, Voice over Wifi (VoWifi) requires an uptime of the communication between the wireless and the device, with requirements both to the network and the mobile phone. Ambitious novel concepts as BasicInternet and IoT-network slicing will be introduced and described.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

2nd Report on Standardization/Regulation/Certification Activities

D31.3: 2nd Report on Standardization/Regulation/Certification activities.
This deliverable is a comprehensive progress report summarizing the overall progress of SCOTT regarding Standardization/Regulation/Certification activities after the 2nd year of the project. [Month 24]

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Autonomous Wireless Network Requirements Specification

Requirements will be derived from the use cases identified within this WP. The requirements will be collected, harmonized and documented according to SP1 guidelines.
This deliverable will include the identification of requirements for WSN associated modules, GWs associated modules, and the Logistics and Maintenance Cloud Platform and the End-User Application associated modules.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Autonomous Wireless Network Development Progress Report Year 1

This report will include a summary of the status of the work within WP2.12 at the end of the first year of the project, as well as a summary of the main achievements during this period coming from the results of the requirements specification and the early design specification tasks.
This deliverable will also include the following detailed technical information:
D18.2.IR1: Autonomous Wireless Network High Level Design [INDRA, M10]
This document will include the specification at a high level of the Energy Autonomous Wireless Network for Rail Logistics and Maintenance resulting from T2.1.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Foundations for Building Trusted Systems

D28.1: The deliverable “Foundations for Building Trusted Systems” is a public report, which will summarize the relevant trust factors and state of the art of building trusted systems. The deliverable will describe the detailed process framework that will be used within SCOTT to ensure that system trust is actually achieved. M6.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

SCOTT Requirements Management Guidelines

The deliverable “SCOTT Requirements Management Guidelines” is a public report, which will be made available very early in the project (M2) to ensure an efficient and harmonized requirements management process in SCOTT, enabling optional iterations, cross use-case/domain synergies and efficient progress tracking. M2.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Critical Area Trustable Warning System Development Progress Report Year 1

This report will include a summary of the status of the work within WP20 at the end of the first year of the project, as well as a summary of the main achievements during this period coming from the results of the requirements specification and the early design specification tasks.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Sandbox Specification

Requirements identification and initial specifications for the sandbox– M7

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Standardization/Regulation/Certification Approach of SCOTT

D31.1: Standardization/Regulation/Certification approach of SCOTT.
This deliverable will describe the generic methodologies and processes to facilitate standardization, regulation and certification of the out coming solutions developed in SCOTT. [Month 4]

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

\"Use Case Specification \"\"Secure Car Access\"\"\"

A document shall be written covering the detailed description of the use case scenario “secure car access” including typical application scenarios as well as typical state-of-the-art passive keyless entry solutions.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Managed Wireless Framework

This document will provide the framework for managed wireless access. Starting from the state-of-technology, the challenges will be identified. These challenges will be converted into market numbers, e.g. the costs of customer services for Internet Service Providers (ISPs). The report will then focus on the two key aspects, (i) the remote management of wireless to achieve better service quality, and (ii) the expected upcoming/novel services and their service requirements towards trustable Wireless

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Critical Area Trustable Warning System Requirements Specification

Requirements will be derived from the use cases identified within this WP. The requirements will be collected, harmonized and documented according to SP1 guidelines.
Requirements to be collected will include WSN requirements for hardware/software elements, communications and sensing; I2V/V2I communication technology requirements; and CATWS GW requirements among others.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

1st Report on Standardization/Regulation/Certification Activities

D31.2: 1st Report on Standardization/Regulation/Certification activities.
This deliverable is a comprehensive progress report summarizing the overall progress of SCOTT regarding Standardization/Regulation/Certification activities after the 1st year of the project. [Month 12]

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Industrial Use Cases – Specification, Integration, Demonstration and Evaluation Management Methodology

Deliverable D6.1 describes how specification, integration, demonstration and evaluation management will be performed. Proper tools and methods that will be used in order to fulfil WP6 objectives will be delivered and described. Key roles, responsibilities as well as deadlines will be described. This deliverable specifies the structure of D6.2, D6.3, D6.4 documents.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Progress Report “Managed Wireless for Smart Infrastructure” Year 1

The main objective of this deliverable is to provide detailed technical description of the use case development level after year 1.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Assessment of technology

This document will perform a high-level assessment of the envisaged technology lines in SP3. The assessment is based on factors like innovation type (technology, product, social, market) and expectations of applicability in the SCOTT use cases.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24

Sandbox (Alpha)

Initial implementation of the Sandbox and its evaluation and deployment (without model checker) – M14

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Demonstrators, pilots, prototypes 2020-03-24

Demonstrator Generation 1

Goal is to demonstrate the applicability of Use Cases and Building Blocks (Iteration 1), integrated in an industry automotive test environment, specifically a powertrain test bed and a mobile test vehicle.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Demonstrators, pilots, prototypes 2020-03-24

First Evaluation of Technical Progress & Assessment of Project Objectives

The deliverable “First Evaluation of Technical Progress & Assessment of Project Objectives” will provide a summary of the technical progress and thus assess achievement of project objectives as input for the overall year 1 progress report. M11.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2016-2

download deliverable 

Documents, reports 2020-03-24