The page lists 18 deliverables related to the research project "EASY-RES".
title and desprition | type | last update |
---|---|---|
D1.2 Report on the Definition of the Converter Reactive Power CapabilityParametric design of the Reactive Power Capability of Converter Interfaced DRES/BESS systems. This deliverable corresponds to the 1st of the 3 aims of T1.2. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D7.6 Report on the 1st period of disseminationDescription of the dissemination and communication activities performed during the first period of the project. Report on the 1st period running WP7. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D2.2 1st Report on the Electric and thermal dynamic modelling of DRES/BESSInitial work done for T2.2. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D3.2 1st Report on methodologies regarding the reaction of DRES and storage systems during faultsReport on the initial work done T3.2 validated with simulations. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D8.4 Second Version of Risk AnalysisThis is updated version of D8.2 Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D4.1 Report on Initial ICT ArchitectureReport on the work done in T4.1 providing a list of functional and non-functional requirements and a small set of well-defined use-cases regarding the ICT infrastructure of EASY-RES. Further, a high-level substrate architecture will be specified exploring virtualization as basic paradigm and clearly identifying interfaces, storage and processing locations alongside the ICAs and µGs, and providing an analysis and assessment of available communication channels and infrastructures. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D3.3 1st Report on the methodology for detection of fault type and proximityReport on the initial work done in T3.3 validated with simulations. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D5.2 Report presenting the Portfolio of ASReport on the work done in T5.2 Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D7.1 Dissemination and Communication PlanThe dissemination Plan will be continuously updated throughout the Project lifetime with updates expected every six months. Work done in T7.1. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D7.5 Press releasesAimed to involve the press, a press note for the project as a whole will be prepared, and updated continuously. Each partner will generate, based upon the generic press note, localized press notes. A press note will be sent out every 6 months. Part of work done in T7.3. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2020-03-06 |
D5.1 Report Reviewing the Current Market Regulatory FrameworkReport on the initial work done in T5.1, i.e. review the current market regulatory framework Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D8.2 First Version of Risk AnalysisReport on the possible risks during this project period and guidelines for resolution. It contains part of the work done in T8.2. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D2.1 Description of the metrics developed with respect to transient and dynamics response and report on the Review of the respective Current Grid CodesReport on the work done in T2.1. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D3.1 Report on the work done in T3.1review of current FRT requirements, development of generic FRT curve, parametric sizing of the required FSS and metrics for contribution to fault clearing Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D7.4 Project LeafletThe brochure will contain: main objectives and the project, activity carried out during the project progress, results and contact details. English and participant countries\' languages versions if required will be issued. Part of work done in T7.3. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2020-03-06 |
D1.1 Description of the metrics developed for the Quasi-Steady-State Operation and report on the Review of the respective Current Grid CodesReport on the work done in T1.1 Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D7.3 Project presentation and scientific articlesA standard project presentation will be developed and used by all the partners in their dissemination activities, in English and the other participant countries\' languages. The presentation will be updated continuously while partners will localize the presentation for local and national dissemination activities. Furthermore, scientific articles in selected peer-reviewed publications will be published by partners, as further described in Section 2.2. Part of work done in T7.4. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
D7.2 Project websiteThe website and portal will be ready at an early stage, but updated continuously. Main page will be developed in English and other participant countries\' languages. Work done in T7.2. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2020-03-06 |