Opendata, web and dolomites

WiSHFUL project deliverables

The page lists 46 deliverables related to the research project "WiSHFUL".

 List of Deliverables

WiSHFUL: list of downloadable deliverables.
title and desprition type last update

First Dissemination Report

This public deliverable will report on dissemination and promotion activities within the first year of the project.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Final operational network control

This public document gives a detailed description of the full functionality of the final network control software platform.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Specification of first showcases

This public deliverable will provide a detailed description of the first set of showcases to be implemented by the end of Year 1 and according key functionalities that will be demonstrated. This document will serve as guideline for showcase implementations in WP3, WP4, WP5 and WP6.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Final software development kit and toolset for network control

Software deliverable. Final release of the network control software on the WiSHFUL portal, together with the supporting documentation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Support of Third Party experiments in Year 2

This public deliverable reports on the support given by the WiSHFUL consortium to experiments by Third Parties.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Second Dissemination Report

This public deliverable will report on dissemination activities within the second year of the project.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

First implementation of testbed on the move

This public document gives a detailed description of the capabilities and operation of the testbed on the move in year 1. This deliverable also provides guidelines for packaging, transport, insurance and initial setup of the hardware. This deliverable will also include the improvements and extensions to be implemented in year 2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

First operational network control software platform

This public document gives a detailed description of the capabilities and performance of the first network control software platform that follows the Path 1 innovation strategy (black-box). This deliverable will also include a list of improvements and extensions to be implemented in year 2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Design of software architecture for radio control

This public deliverable will report on the generalised software architecture for radio control and its unified programming interfaces. The document will serve as a guideline for the implementation of the basic radio control software platform that will be offered for the first open calls at the end of year 1.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Final testbed-on-the-move toolset

Final release of software tools on the WiSHFUL portal for setting up a testbed on the move, together with the supporting documentation (including scenarios where a wireless control channel is feasible and instruction manual for deployment).

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Second experimentation toolset

Second release of new and extended experimentation tools on the WiSHFUL portal, together with the supporting documentation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Second software development kit and toolset for radio control

Software deliverable. Second release of the radio control software on the WiSHFUL portal, together with the supporting documentation (white-box innovation path)

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Results of final set of showcases

This public deliverable will report on the results of the third and final set of showcases that have been implemented, including showcases using optimised, advanced and flexible implementations of the intelligence engine.
This deliverable reports on activities in WP3, WP4, WP5, WP6 and WP10 that are related to the showcases.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Second testbed-on-the-move toolset

Second release of software tools on the WiSHFUL portal for setting up a testbed on the move, together with the supporting documentation (including scenarios where a wireless control channel is feasible and instruction manual for deployment).

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

First experimentation toolset

First release of new and extended experimentation tools on the WiSHFUL portal, together with the supporting documentation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Final experimentation toolset

Final release of new and extended experimentation tools on the WiSHFUL portal, together with the supporting documentation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

First software development kit and toolset for radio control

Software deliverable. First release of the radio control software on the WiSHFUL portal, together with the supporting documentation (black-box innovation path)

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Implementation of optimised experimentation tools

This public document gives a detailed description of the capabilities and operation of the optimized experimentation tools implemented in year 2. This deliverable will also include a list of improvements and extensions to be implemented in year 3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Standardization and Regulation Report

This public deliverable will report on standardization and regulation activities within the first and second year of the project.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Second operational network control software platform

This public document gives a detailed description of the capabilities and performance of the network control software platform that follows the Path 2 innovation strategy (white-box). This deliverable will also include a list of improvements and extensions to be implemented in year 3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Implementation of final experimentation tools

This public document gives a detailed description of the capabilities and operation of the final experimentation tools implemented in year 3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Support of Third Party extensions in Year 2

This public deliverable reports on the support given by the WiSHFUL consortium to Third Parties for extension.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Second operational radio control software platform

This public document gives a detailed description of the capabilities and performance of the radio control software platform that follows the Path 2 innovation strategy (white-box). This deliverable will also include a list of improvements and extensions to be implemented in year 3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Support of Third Party experiments in Year 3

This public deliverable reports on the support given by the WiSHFUL consortium to experiments by Third Parties. This report includes the lessons learnt.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Results of second set of showcases

This publication deliverable will report on the results of the first set of showcases that have been implemented. This deliverable will also include the specifications of the third set of showcases to be implemented by the end of Year 3.
This deliverable reports on activities in WP3, WP4, WP5 and WP6 that are related to the showcases.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Optimised implementation of testbed on the move

This public document gives a detailed description of the capabilities and operation of the testbed on the move in year 2. This deliverable provides optimised guidelines for packaging, transport, insurance and initial setup of the hardware. This deliverable will also include the improvements and extensions to be implemented in year 3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Initial implementation of experimentation tools

This public document gives a detailed description of the capabilities and operation of the new and extended experimentation tools implemented in year 1. This deliverable will also include a list of improvements and extensions to be implemented in year 2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Support of Third Party extensions in Year 3

This public deliverable reports on the support given by the WiSHFUL consortium to Third Parties for extension. This report includes the lessons learnt.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Final operational radio control software platform

This public document gives a detailed description of the full functionality of the final radio control software platform.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Third Dissemination Report

This public deliverable will report on dissemination activities within the third year of the project.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

Final implementation of testbed on the move

This public document gives a detailed description of the capabilities and operation of the testbed on the move in year 3. This deliverable provides consolidated guidelines for packaging, transport, insurance and initial setup of the hardware.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

First testbed-on-the-move toolset

First release of software tools on the WiSHFUL portal for setting up a testbed on the move, together with the supporting documentation (including scenarios where a wireless control channel is feasible and instruction manual for deployment).

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Final software development kit and toolset for radio control

Software deliverable. Final release of the radio control software on the WiSHFUL portal, together with the supporting documentation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

High level requirements for testbeds and software platforms

This public deliverable will give a high-level description of the basic capabilities of WiSHFUL native testbeds and software platforms, and will serve as a guide for implementations in WP3, WP4, WP5 and WP6. This deliverable relates to the activities in Task 2.1, Task 2.2 and Task 2.3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-31

First software development kit and toolset for network control

Software deliverable. First release of the network control software on the WiSHFUL portal, together with the supporting documentation (black-box innovation path)

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Second software development kit and toolset for network control

Software deliverable. Second release of the network control software on the WiSHFUL portal, together with the supporting documentation (white-box innovation path)

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-31

Design of experimentation tools

This public deliverable will report on the design of extensions to existing experimentation tools and new experimentation tools, both complying with the FED4FIRE interoperability standards. The document will serve as a guideline for the implementation of the experimentation tools that will be offered for the first open calls at the end of year 1.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Final intelligent modules and hierarchical control software prototype

This software deliverable will consist of the final implementation of the modules populating the Intelligence Framework.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

First operational radio control software platform

This public document gives a detailed description of the capabilities and performance of the first radio control software platform that follows the Path 1 innovation strategy (black-box). This deliverable will also include a list of improvements and extensions to be implemented in year 2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

First intelligent modules and hierarchical control software prototype

This software deliverable will consist of the initial implementation of the modules populating the Intelligence Framework. The framework will be made available for the 3rd, 4th and 5th open call for experimentation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Other 2019-05-30

Design of software architecture for intelligent control and showcases

This public deliverable will report on the generalized software architecture for intelligent radio and network control. The document will serve as a guideline for the implementation of the basic intelligence modules that will be offered for the 3rd open call of WiSHFUL. This public deliverable will also provide a detailed description on how the showcases defined in D2.2 are augmented with intelligent adaptations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Specification of testbed on the move

This public deliverable will report on the specifications for equipment portability, wireless control channel and deployment strategies for testbeds on the move. The document will serve as a guideline for the preparation of equipment and the implementation of the wireless control channel that will be offered in the first open calls at the end of year 1.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Final operational intelligence framework

This public document gives a detailed description of the full functionality of the final intelligence framework.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Results of first set of showcases using basic intelligence

This public deliverable will report on the results of the first set of showcases that have been implemented and use basic intelligence in the form of static rules.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Results of first set of showcases

This public deliverable will report on the results of the first set of showcases that have been implemented. This deliverable will also include the specifications of the second set of showcases to be implemented by the end of Year 2.
This deliverable reports on activities in WP3, WP4, WP5 and WP6 that are related to the showcases.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30

Design of software architecture for network control

This public deliverable will report on the generalised software architecture for network control and its unified programming interfaces. The document will serve as a guideline for the implementation of the basic network control software platform that will be offered for the first open calls at the end of year 1.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-11-2014

download deliverable 

Documents, reports 2019-05-30