Opendata, web and dolomites

EKOMAP

Eco friendly marine antifouling paint

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "EKOMAP" data sheet

The following table provides information about the project.

Coordinator
EKOMARINE PAINT AB 

Organization address
address: HALLTORP 1
city: MARIEFRED
postcode: 647 91
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://www.ekomarine.se/nyheter
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-1-2014
 Funding Scheme SME-1
 Starting year 2015
 Duration (year-month-day) from 2015-02-01   to  2015-06-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    EKOMARINE PAINT AB SE (MARIEFRED) coordinator 50˙000.00

Map

 Project objective

The objective of the proposed project as a whole (phase 1-3) is to plan, develop, secure and bring to market an innovative non-toxic and eco-friendly self-polishing boat hull paint. In the proposed project Ekomarine Paint AB will introduce the patented non-toxic anti-fouling marine hull paint to the European and the global commercial shipping market and to the global leisure boat industry. The reason why Ekomarine Paint can do this, and no one else, is that the innovation is based on a patented technology and over 11 years of research (before year 2007 research had been performed in Ekomarine AB since 2003). Exactly what we wish to achieve through the project is to develop an optimized application for commercial vessels (which is a new market for the company) and a much improved application for leisure boats (partly existing customers). This will be achieved through a well-planned project plan where Ekomarine Paint will demonstrate in full scale and in real environment, in conjunction with potential customers, the functionality, economic and environmental benefits as well as working environment improvements in various geographical and meteorological settings. In terms of technology readiness level (TRL) we will move from TRL 6 towards TRL 9 during the project life-cycle.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EKOMAP" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "EKOMAP" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

DUSTCOMB (2018)

A Novel Technology to Reduce Industrial Dust Pollution and to Enable Most Efficient Energy Recovery

Read More  

EPIC (2017)

Environmentally Friendly Recycled Plastic Floors in Containers

Read More  

PAIR (2015)

Plasma active pollution control system

Read More