Opendata, web and dolomites

AllOxITD project deliverables

The page lists 4 deliverables related to the research project "AllOxITD".

 List of Deliverables

AllOxITD: list of downloadable deliverables.
title and desprition type last update

Delivery of parts for destructive and non-destructive testing

Delivery of 20 parts (if segmented) or in agreed No. for destructive and non-destructive tests (must meet acceptance limits)

Programme: H2020-EU.3.4.5.5. - Topic(s): JTI-CS2-2014-CFP01-ENG-02-01

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Dissemination Report

Documents the dissemination steps and the measures to maximize the success of dissemination and the specified acceptance standards for the production of OCMCs.

Programme: H2020-EU.3.4.5.5. - Topic(s): JTI-CS2-2014-CFP01-ENG-02-01

download deliverable 

Documents, reports 2020-02-07

Report on limitations of braided structures for CMC

Report on limitation of l braided structures for CMC according to WP 2.2.

Programme: H2020-EU.3.4.5.5. - Topic(s): JTI-CS2-2014-CFP01-ENG-02-01

download deliverable 

Documents, reports 2020-02-07

Testmatrix

Documentation of the test matrix: the type of test (with norm or standard to be followed), the number and type parameter to be kept constant. The Testmatrix will be review and probably amended along the project. Review and amendments will not be made public.

Programme: H2020-EU.3.4.5.5. - Topic(s): JTI-CS2-2014-CFP01-ENG-02-01

download deliverable 

Documents, reports 2020-02-07