Opendata, web and dolomites

StepUP SIGNED

Solutions and Technologies for deep Energy renovation Processes UPtake

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 StepUP project word cloud

Explore the words cloud of the StepUP project. It provides you a very rough idea of what is the project "StepUP" about.

data    cycle    epbd    energy    models    operations    feedback    gap    disruption    methodology    integrate    party    minimise    attractive    constantly    decarbonised    comfort    generation    decarbonisation    verifying    retrofits    continuous    financing    barriers    big    protocol    plug    drastically    plan    shallow    identifies    innovative    intelligence    re    ready    technologies    site    service    play    vision    iterative    accelerate    performance    investment    buildings    demand    optimal    10    maximum    fast    ecm    market    advancing    solutions    platform    update    time    storage    interconnected    minimal    deep    accessible    operation    refining    interoperability    software    environment    stepup    2050       financial    consumption    optimisation    near    res    smes    loops    40    interventions    reduce    investments    improvement    building    rates    stock    2018    impacts    life    renovation    ieq    constraints    stage    optimise    progressive    persist   

Project "StepUP" data sheet

The following table provides information about the project.

Coordinator
INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED 

Organization address
address: KELVIN CAMPUS WEST OF SCOTLAND SCIENCE PARK HELIX BUILDING
city: GLASGOW
postcode: G20 0SP
website: www.iesve.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country United Kingdom [UK]
 Total cost 4˙944˙962 €
 EC max contribution 3˙692˙578 € (75%)
 Programme 1. H2020-EU.3.3.1. (Reducing energy consumption and carbon foorpint by smart and sustainable use)
 Code Call H2020-LC-SC3-EE-2018
 Funding Scheme IA
 Starting year 2019
 Duration (year-month-day) from 2019-08-01   to  2023-01-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    INTEGRATED ENVIRONMENTAL SOLUTIONS LIMITED UK (GLASGOW) coordinator 239˙750.00
2    MANNI GROUP SPA IT (VERONA) participant 743˙925.00
3    FUNDACIO EURECAT ES (CERDANYOLA DEL VALLES (BARCELONA)) participant 539˙000.00
4    CONSTRUCCIONES ACR SA ES (AIZOAIN) participant 386˙015.00
5    IES R&D IE (DUBLIN 1) participant 370˙825.00
6    SUNTHERM APS DK (HOEJSLEV) participant 357˙551.00
7    ABUD MERNOKIRODA KFT HU (BUDAPEST) participant 344˙662.00
8    UNISMART PADOVA ENTERPRISE SRL IT (PADOVA) participant 297˙500.00
9    BUDAPEST FOVAROS XVIII. KERULET PESTSZENTLORINC-PESTSZENTIMRE ONKORMANYZATA HU (BUDAPEST) participant 231˙350.00
10    ENERGINVEST BE (Bruxelles) participant 182˙000.00

Map

 Project objective

The 2018 EPBD update identifies deep renovation as key to drastically reduce energy demand and achieve the EU vision of a decarbonised building stock by 2050. The technology to achieve this reduction is available on the market today. Renovation rates are still far from the target 3% and shallow retrofits persist with low impacts on energy consumption. StepUP will develop a new process for deep renovation for decarbonisation, with fast design to operation feedback loops to minimise performance gap and optimise investments. The project will deliver plug&play technologies for minimal disruption, interconnected for maximum impact on energy, costs, IEQ and user comfort. The new iterative approach to renovation, based in big data for continuous performance improvement, will reduce financial barriers and make decarbonisation of existing buildings a reliable, attractive investment. StepUP will: 1. Make renovation more attractive and reliable with a new methodology based on near-real time data intelligence to identify cost-optimal, high impact interventions at any stage of the building life; 2. Reduce the performance gap to 10% via an integrated life-cycle software platform to plan renovation steps, identify high value ECM, improve IEQ, integrate RES (including storage) and optimise operations by constantly refining and verifying targets and constraints; 3. Minimise time on site to 40% by advancing innovative technologies for deep renovation to a market-ready renovation package of Plug & Play Technologies, including RE generation and storage for decarbonisation; 4. Optimise renovation investments via innovative financing models for optimisation of energy, comfort and cost performance over the building life, based on progressive financing and building performance as a service; 5. Accelerate the renovation market via an open protocol for interoperability of the StepUP solutions with third party market products, fostering a plug&play environment accessible to innovative SMEs.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "STEPUP" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "STEPUP" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.1.)

EERAdata (2019)

Data-driven decision-support to increase energy efficiency through renovation in European building stock.

Read More  

sEEnergies (2019)

Quantification of synergies between Energy Efficiency first principle and renewable energy systems

Read More  

ENEFIRST (2019)

Making Energy Efficiency First principle operational

Read More