The page lists 53 deliverables related to the research project "ETC".
title and desprition | type | last update |
---|---|---|
Open Standards & Requirements for IASOpen Standards document that will be published and can be used by other parties to implement a Interoperable Account System and connect it to the central authentication and routing hub of the ETC. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Other | 2019-05-31 |
Test ReportThis is the final test report. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
Acceptance of the Dutch Account in GermanyThe validators in the German vehicles must accept the unique identifier which is stored on the Dutch OV-chipkaart. This approach allows the current VDV travelers to use their existing VDV-card and the new (pilot) users to use the OV-chipkaart to pay for the trip and ‘travel on account’. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
ABT systems & equipmentABT-systems connected with pilot region. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Mobile Travel AppMobile Travel App ready to provide access to all website functionality and including a ticket feed in which transactions are shown, as soon as they are received from the front-end terminals. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Test in a Lab situtationTest of the use cases of the Dutch Pilot in the ETC lab in Amersfoort. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Acceptance of the German Account in the NetherlandsThe validators in the Netherlands vehicles must accept the unique identifier which is stored on the German smartcard in public transport. This approach allows the current VDV travelers to use their existing VDV-card and the new (pilot) users to use the OV-chipkaart to pay for the trip and ‘travel on account’. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
EquipmentEquipment ready to be used in the pilot with ABT software integrated. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Travel InformationReport with specifications for cross-border Mobility-Information. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
Running PilotEnd of the German Pilot Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Running Pilot (Introduction of GST)End of the Dutch Pilot Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Medium for TravellersFare Medium for travellers with ETC-token ready. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Test & Evaluation PlanA detailed document which describes the test entry and exit criteria and the criteria for evaluating the pilot. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
Demo-System Interoperable Account SystemDemo system ready with Demo Interfaces, Open API, Demo Reference Mobile Apps Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Functional Specifications Interoperable Travellers Interface (ITI)Document that describes the design elements, interfaces, APIs. core components and common standards necessary for the interoperable provisioning of the following services to Travellers travelling in a foreign travel scheme or between two or more Travel Schemes: Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
Demo System ITIDemo System ready to select and integrate core back-end components in concert with a reference Mobile App Front end for demonstration purposes. Conduct User Panels to refine User Experience. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Open Standards & Requirements ITIOpen Standards document that will be published and can be used by other parties to implement a Interoperable Travellers Interface and connect it to the central authentication and routing hub of the ETC. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Other | 2019-05-31 |
Franchise FrameworkA document that describes the franchise structure for the ETC, and will be used for the franchise contracts. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
Ecosystem ABTA white paper that describes the whole eco-system for interoperable account-based ticketing. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
End-to-End Test ReportReport with results of the end-to-end tests. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
Business Case ABTA white paper on the Business Case for interoperable ABT is published. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
Functional Specifications Interoperable Account SystemFunctional specifications document which describes: Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-31 |
Pilot ReportA detailed document with results of the pilot, based upon the Test and evaluation Plan. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-30 |
Lab Expansion PlanPlan for expansion of the Lab, consisting of the following: Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-30 |
Close-out ReportBased upon the final report and the results of the final stakeholder meeting this report will not only focus on the results of the programme, but also on the recommendations for the (near) future. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-30 |
License AgreementA license agreement which is aligned with the business model requirements as set forth in work package 3. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-30 |
ETC Business PlanThe business plan document for the ETC. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-30 |
Pilot Report LuxembourgA detailed document which provides the results of the pilot, based upon the Test and evaluation Plan. This report will be used to draft the overall Final Report. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-05-30 |
Open Standards & RequirementsThe standards, requirements and performance benchmarks for the ETC Hubs will be published to allow Travel Schemes wishing to develop their own local or regional hubs the chance to. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Other | 2019-05-30 |
Service PlatformReservation- and ticketing platform ready and based on the principles of Account based Ticketing. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Final ReportA document with the results of the whole programme. This will be presented in the final stakeholder meeting. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-03-11 |
Smart Privacy RequirementsSMART System Requirements for embedding privacy measures in local travel scheme systems. Stating acceptable operation parameters and the certification bandwidths and thresholds to be used for service level monitoring. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-03-11 |
Franchise ContractsThe franchise contracts for the members of the European Travellers Club. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-03-11 |
Audit ProceduresAudit Procedures for: Data Processors, Data Traders & Credential Processors. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Other | 2019-03-11 |
Standards & Requirements for GermanyTranslate Standards and Requirements for Incorporation in the German eTicket standard. Specifications from relevant work packages are translated into the technical environment and the rules and regulations of the German eTicket standard so that the German-pilot can be copied to each other e-ticket implementation in Germany. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Other | 2019-02-26 |
Privacy Reference DesignDetailed design incorporating the relevant best practices for security, privacy and single sign on in the context of a Pan European Account Based Ticketing Solution with federated local multifunctional services and payment methods. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Other | 2019-02-26 |
Program PlanA document that describes the whole programme with milestones, planning, scope, work packages, relation between work packages, communication, budget, risks etc. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2018-11-27 |
Pilot Design DocumentA document that describes the design and full scope of the pilots. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2018-11-23 |
ETC statutesStatutes of the European Travellers Club, a not-for-profit entity, to be set up. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2018-11-23 |
Test report GSTThis test reports consists of: Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2018-11-23 |
Test Case SpecificationsThis document specifies the different test cases, used in the interoperable testing. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2018-11-23 |
Pilot LuxembourgStart of the pilot in Luxembourg Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-03-04 |
Test SuiteIn this test suite all tests are described, programmed for: Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-03-04 |
Inception ReportA document that includes all the up-dates resulting from the Grant Agreement preparation phase. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2018-11-23 |
Interface Specification DocumentThis document describes: Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Other | 2018-11-23 |
Master Test PlanIn this document the overall test plan and test strategy is described with input from all the work packages. Also all relevant pilot use cases will be included in this document. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2018-11-23 |
Staging ServerPrototyping & Staging Server for the Lab. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-03-04 |
Project Plan PilotsA detailed document for the execution of the pilots, based on the input from work packages <11>, <12> and <13>. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2018-11-23 |
Online PortalThis portal will be used to communicate with stakeholders and users of the ABT (in the different pilots). During the whole period of the programme this portal will be used to communicate, receive feedback with above mentioned groups. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-03-04 |
Low-cost Implementation StrategyDocument that describes the low-cost implementation strategy for existing and greenfield (including the SAM based implementation of the GST terminal). Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-02-22 |
Showcase LabA showcase for the pilot teams and stakeholders in the Lab. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2019-03-04 |
Hub DesignDesign documentation of the central authentication and routing hub including system of hubs and token ID-management. Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Documents, reports | 2019-02-22 |
GST implementation on Java Card PlatformBased upon the specifications of the version 2 the token will be implemented on a Java Card based platform (chip). Programme: H2020-EU.3.4. - Topic(s): MG-7.2a-2014 |
Demonstrators, pilots, prototypes | 2018-11-27 |