title and desprition type last update

Balancing societal effects and cost-benefit of different infrastructure decisions.

Report on the output of Task 5.3

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Cost effective transition zone design tailored to line type and traffic

Report on output of Task 2.6.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Cost-benefit and societal analysis report illustrated by case study line data

Report on the output of Task 6.4

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Application of lean and automotive industry techniques to produce a step change in railway S&C life and costs

Reporting output of Task 2.3.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

GIS-based web application

Achievement, problems, mitigation action, and any deviations in creation of the GIS-based web application in Task 6.2. Sample of application to be appended.

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Tailored decision support for track and vehicle maintenance through conversion of data to information.

Report on output of Task 4.5

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Data on system damage for different combinations of wire tension, pantograph collector strip material and upload force.

Report on the output of Task 3.5

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Tailoring track to avoid corrugations: Traffic dependant selection of rail cross-section, clips and pads to avoid or delay corrugation

Reporting output of Task 2.4.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Decision support tools for implementation of technologies

Achievement, problems, mitigation action, and any deviations in creation of the decision support tools in Task 6.3. Sample of tool to be appended.

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Final business case synthesis final report

Reporting output of Task 1.6

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Interface definition for input of GNSS (or ground-based train odometry) location data to monitoring technology.

Report on output of Task 4.4

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Status report on current design & maintenance criteria relative to needs, static illustration for case study lines

Report on the output of Task 6.5

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

NeTIRail-INFRA Final brochure

Project communications and publicity

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-03-06

Track and ride quality monitoring technology based on train-borne measurements in standard vehicles.

Report on output of Task 4.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Tailoring lubrication to duty and climate: Safe, effective and eco-friendly avoidance of track wear and damage

Reporting output of Task 2.5.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Case study line data scenarios playable in the web application

Report on output of Task 6.4

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Overview of technical developments and innovation with direct or possible future expected impact on existing guidelines.

Reporting output of Task 7.5

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Incentives final report

Reporting output of Task 1.5

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Cost and User benefit report

Reporting output of Task 1.3

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Overview of project related recommended future development needs.

Reporting output of Task 7.6

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Data report on network-related technical and operational data

Report on the output of Task 6.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Validated monitoring equipment produced by testing of instrumentation in the real environment.

Report on output of Task 4.6

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Harmonised interface to transmit on-board monitoring data to the traffic control centre.

Report on output of Task 4.4

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Development status of smartphone technology for track and ride quality monitoring.

Report on progress in Task 4.3

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Analysis of “big data”: geospatial analysis of costs, drivers of failure and life of track infrastructure.

Reporting output of Task 2.1.

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Wider economic benefits final report.

Reporting output of Task 1.4

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Perception of different service options: User study and data analysis

Report on the output of Task 5.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Project Quality Plan

Generated in work package 8

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Database of economic data on case study lines, with accompanying meta-data description to document structure

Achievement, problems, mitigation action, and any deviations in creation of the database of economic data. Sample data to be appended.

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Project Website (public and private)

Achievement, problems, mitigation action, and any deviations in creation of the project website. Sample of website to be appended.

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Functional, operational and technical specification for simplified interlocking of user autonomous switches in low density lines.

Report on achievement, problems, mitigation action, and any deviations from expectations in demonstration of equipment designed in Task 4.4.

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Preliminary transition zone model and detailed modelling plan

Reporting output of Task 2.6.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Lubrication systems and data available, with estimates of costs and benefits

Reporting output of Task 2.5.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Societal and legal effects of transport decision: Stakeholder analysis.

Report on the output of Task 5.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Confidentiality policy and agreements

Supporting agreements to enable Task 6.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Power supply technologies and practices of low and high-density railways, identifying learning points and future opportunities.

Report on output of Task 3.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Corrugation reduction strategies for NeTIRail-INFRA track types, with estimates of costs and benefits

Reporting output of Task 2.4.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Wider economic benefits intermediate report

Reporting output of Task 1.4

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Model to support increasing the resilience of power supply infrastructure to changing climate.

Report on the output of Task 3.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Cost model development report

Reporting output of Task 1.3

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Development of technology for track and ride quality monitoring

Report on progress in Task 4.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Low cost track based monitoring modules for plain line and S&C.

Report on the output of Task 4.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Modular packages of component grades and design specifications for new installations of power infrastructure tailored to traffic and operational needs.

Report on the output of Task 3.3

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Project Flyer

Project communications and publicity

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-03-06

Project Management Plan.

Generated in work package 8

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-05-30

Low cost smartphone based track and ride quality monitoring technology.

Report on output of Task 4.3

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Analysis of “big data”: tailoring overhead line infrastructure specification and needs through geospatial analysis of duty and life of equipment.

Report on the output of Task 3.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Practices and track technology tailored to particular lines.

Reporting the output of Task 2.2

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Tailored combinations of wire tension, pantograph collector strip material and upload force for optimum performance.

Report on the output of Task 3.4

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Report on selection of case studies

Report on selection of case studies, generated by T1.1.

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

Cost/benefit data and application methodology for lean in railway S&C

Reporting output of Task 2.3.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06

NeTIRail-INFRA Newsletters (3 issues)

Project communications and publicity. Three issues: Month 12, 24, 36.

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Data collection equipment in the laboratory environment, and plan for field trials

Report on the output of Task 4.1

Programme: H2020-EU.3.4. - Topic(s): MG-2.1-2014

download deliverable 

Documents, reports 2019-03-06