Real-Time-Mining project deliverables

The page lists 18 deliverables related to the research project "Real-Time-Mining".

 List of Deliverables

Real-Time-Mining: list of downloadable deliverables.
title and desprition type last update

Public comprehensive documentation of industry field test in two applications including results on performance assessments and further potential for improvement

Scientific article highlighhting the practical results of the integrated Real Time Mining concept experimentally tested at selected field test sites. Its purpose is to provide a foundation for follow up development.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Report on field measurement results for the positioning system including accuracy and reliability measurements

Report on field measurement results for the positioning system including accuracy and reliability measurements

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Real-Time-Mining Flyer, Newsletters

Real-Time-Mining Flyer, Newsletters (months 12;24;36;48)

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-02-12

Demonstrator for the combined underground positioning system

Integration of the three technologies, inertial navigation system, ultra-wideband system and geometrical scanners into a modular system. Constriuction, demonstration and evaluation.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Report on Integration of central Real-Time Mining control cockpit from WP6 with ZG from task 9.1

Report on Integration of central Real-Time Mining control cockpit from WP6 with ZG from task 9.1

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Report on field measurement results on machine performance sensors – cutting equipment

Report on field measurement results on machine performance sensors – cutting equipment

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Comprehensive documentation of the application demonstration including the data management framework

Report documenting development of a robust, intuitive, real-time database management and integration system.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Report with definitive interfaces linking SPI, controlling factors influencing the KPI’s and geological and technical machine or system parameters that need to be measured for effective extraction process control

As per title, the deliverable will be a report that specifies the agreed interfaces linking SPI, controlling factors influencing the KPI’s and geological and technical machine or system parameters that need to be measured for effective extraction process control

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Documentation on central mine monitoring and control station “Zentrale Grubenwarte” (IGW)

Report describing an advanced mine monitoring control, operation and safety system suitable for small scale mines. The report will document the modifications to integrate systems generated in the Real-Time-Mining module

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Statistical inference rule for linking SPIs and sensor measurements and optimized bulk sampling schemes

Report describing a statistical inference rule linking SPI’s with sensor measurements for single, bulk and insitu - sample measurements.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Concepts and algorithmic tools to support decision support in unit operation and auxiliary processes taking advantage of real-time data

Report describing and documenting concepts and algorithmic tools to support decision support in unit operation and auxiliary processes taking advantage of real-time data

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Validated computer assisted short-term scheduling and production control tool utilizing real-time deposit information

Report document a short term mine planning and production control methodology developed during the Real Time Mining project.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

D1.3 Catalogue of Sustainability and Industrial Viability Indicators specifically related to REAL-TIME-MINING including a description of required sensor functionality, precision and accuracy needed to quantify SPIs

report cataloguing the development of a set of detailed Sustainable Performance Indicators (SPI) of the process allowing for a measureable quantification of impacts of Real-Time-Mining.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Proceedings of European Conference for Real-Time Mining

Published compilation of key project findings to date

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Public documentation and detailed description of the theoretically developed algorithms for rapid sequential resource/reserve model updating

Peer reviewed article describing a theoretical framework for updating of resource models developed within the Real Time Mining project.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Report defining specification of sensor combinations incorporating required precision, identifying preferred location for sensor acquired data acquisition, techno-economic assessment

Report that summarises the initial assessment of sensor requirements with discussion and assessment of suitable sensor combinations.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Documents, reports 2020-02-12

Project website

Project website for public project visibility

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-02-12

Validated computer assisted long- and medium term UG mine planning tool taking geological uncertainty into account and the ability to pre-sort and back-fill zero-value material

Report describing a demonstration activity using a mine planning methodology developed during the Real Time Mining project.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12