Opendata, web and dolomites

GateOne project deliverables

The page lists 7 deliverables related to the research project "GateOne".

 List of Deliverables

GateOne: list of downloadable deliverables.
title and desprition type last update

Report on best practice on “How to Work with SME”

This report aims to identify the good practices to be shared among the partners for future interaction with SMEs. The local specificities will be stressed and more generic issues related to the company size will be discussed.

Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014

download deliverable 

Open Research Data Pilot 2019-05-31

Remaining demonstrators ready to be tested

This deliverable is the set of demonstrators selected in the D20 and D21.

Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Minimum of 5 demonstrators ready to be tested

This deliverable is the set of demonstrators listed in the D4.1.

Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-03-04

promotion material

From the mapping of candidate demonstrators (200 products), some promotion documents will be generated, mainly in electronic format. It will be flyers, powerpoint presentations ... The content will be defined in the frame of WP2.

Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-02-13

Promotion material (2)

This deliverable will be composed of an update of the D9, due to a possible turn over in the list of demonstrators, which may occur after the first year of the project.

Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-03-04

More than 25 demonstrators ready to be tested

This deliverable is the set of demonstrators selected in the D4.2.

Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-02-13

GateOne Website

The website of GateOne will be online in M4.

Programme: H2020-EU.2.1.1.1. - Topic(s): ICT-02-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-02-13