Opendata, web and dolomites

SETRIS project deliverables

The page lists 45 deliverables related to the research project "SETRIS".

 List of Deliverables

SETRIS: list of downloadable deliverables.
title and desprition type last update

Report on the most relevant structure for supporting TRA continuous business

Report on the most relevant structure for supporting TRA continuous business including tasks to be performed

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Final handbook for TRA strategy aspects

Final handbook for TRA strategy aspects. This consolidated version will also include some aspects of the other deliverables

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ALICE Research and Innovation Roadmap on the Physical Internet

ALICE Research and Innovation Roadmap on the Physical Internet

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Strategic Research Agenda and Implementation Plan

Strategic Research Agenda and Implementation Plan on cross-modal long distance freight transport. A preliminary version will be released in M12 for consultation purposes

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ERRAC - Update of ERRAC Technology roadmaps’ implementation plan

ERRAC -Update of ERRAC Technology roadmaps\' implementation plan

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Long distance passenger’s synergies report

To improve the coordinated efficiency of all modes by determining the most appropriate mode(s) when considering the different categories of travel. A preliminary version will be released in M12 and M18 for consultation purposes prior to the final delivery

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Draft handbook for TRA strategy aspects

Draft handbook for TRA strategy aspects. This preliminary version will be released for consultation purposes

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Report on links and coordination with key stakeholders

Describing links with stakeholders needed to implement an integrated transport systems for passengers and freight such as the private sector, European Commission, ERA-Net, Member States and Associated Countries National Representatives, national platforms, international portals and databases including TRIP follow-on, HERMES, US-TRB, OECD/JRC and other global players, including the European Standardisation Organisations (CEN-CENELEC-ETSI). In addition reports will be provided on the motivation and perceived barriers for important stakeholders in implementing an integrated transport system such as industry (both large and small businesses), transport sector financers and developers, and representative freight and passenger groups for examples, the European Intermodal Association (EIA), International Union for Road-Rail Combined Transport (UIRR), Chartered Institute of Logistics and Transport in the UK - CILT(UK) (and similar national freight and logistics entities of other countries), The European Passenger Federation (EPF), European Transport Safety Council (ETSC) and the various national passenger transport authorities.

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Report on the implementation of the selected structure and model of TRA governance

Report on the implementation of the selected structure and model of TRA governance (incl. performance of tasks)

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ERRAC - Alignment of ERRAC priorities with national rail strategies

ERRAC - Alignment of ERRAC priorities with national rail strategies

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Update to Dissemination, Exploitation and Engagement Strategy

Update to Dissemination, Exploitation and Engagement Strategy (i.e. document produced within D4.1)

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

An updated and comprehensive printed Maritime SRIA and accompanying summary brochure

An updated and comprehensive printed Maritime SRIA that identifies and communicates the main R&I priorities, including a summary printed brochure, communicating the main Waterborne SRIA priorities and their context within European Transport as a whole.

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Final report on sustainable TRA business model

Final report on sustainable TRA business model

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Final report on TRA structures

Final report on TRA structures i.e. -OC, -MC and -PC functioning

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ETP – Past Project Evaluation Technique

ETP – Past Project Evaluation Technique

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Benchmark research and innovation activities (ii)

Benchmark research and innovation activities identifying gaps and developing SRA Implementation Plans on Urban Logistics report (ii)

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ERRAC – Knowledge and Dissemination Strategy

ERRAC – Knowledge and Dissemination Strategy

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ALICE Research Roadmaps implementation Plans and Monitoring

ALICE Research Roadmaps implementation Plans and Monitoring

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ALICE Research Roadmaps implementation Plans and Monitoring follow up

ALICE Research Roadmaps implementation Plans and Monitoring follow up

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Final report on TRA sponsorship strategies

Final report on TRA sponsorship strategies

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ALICE Report on the activities performed with Clusters and Member States

ALICE Report on the activities performed with Clusters and Member States. A preliminary version will be released in M12 for discussion purposes

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Final Event and high quality publication

Final Event and high quality publication

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Urban mobility Transport SRIA Implementation Plan

Based on integrated research agenda and roadmaps at the multi-modal level taking into account user needs and policy requirements. A preliminary version will be released in M12 and M18 for consultation purposes prior to the final delivery. UITP

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Final report on TRA practical organisation

Final report on TRA practical organisation including technical and communication aspects

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Waterborne Research Evaluation

Waterborne research evaluation

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Benchmark research and innovation activities (i)

Benchmark research and innovation activities identifying gaps and developing SRA Implementation Plans on Urban Logistics report (i)

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Updated Report on links and coordination with key stakeholders

Updated Report on links and coordination with key stakeholders as described in D4.3, but further describing the progress towards the actual implementation of the integrated transport systems identified

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Waterborne Research Evaluation Methodology

Waterborne research evaluation methodology

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Recommendations on sponsorship and exhibitors’ strategies for TRA

Recommendations on sponsorship and exhibitors’ strategies for TRA

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

SETRIS webpage

SETRIS webpage

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Other 2019-05-31

EC-funded research contribution to roadmapping of long distance transport

This deliverable will summarise the status of existing SRIAs as well as identifying where relevant EC-funded research that have directly contributed in the past five years to the roadmaps and vision activities of the ETPs

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

EC-funded research contribution to roadmapping of urban transport

This deliverable will summarise the status of existing SRIAs as well as identifying where relevant EC-funded research that have directly contributed in the past five years to the roadmaps and vision activities of the ETPs.

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Project Management plan

Project Management plan

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

ACARE – Status Report on the SRIA

ACARE – Status Report on the SRIA

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

\"Defining of the concept a \"\"truly integrated transport system for logistics” (i)\"

\"Defining of the concept a \"\"truly integrated transport system for logistics” for both urban and long distance freight. 1st Version of report\"

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Establishment of a cross-modal permanent group of stakeholders and experts in the long distance freight transport.

Establishment of a cross-modal permanent group of stakeholders and experts in the long distance freight transport.

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Report on the common methodology

Report on the common methodology as described in “T6.1.1 - Inception”

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Dissemination exploitation and engagement Strategy

A detailed Dissemination Strategy will be developed at the beginning of the project on the basis of above objectives. This will define a number of dissemination methods and channels for the project, including (but not restricted to): shaping the link and cooperation with key players (such as identified in tasks 4.2), developing a dedicated webpage to be made available on each ETPs website, and other communications material.

The strategy will also include a proposal for the articles to be published regularly between months 4 and 24.

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Recommendations on TRA structures

Recommendations on TRA structures i.e. -OC, -MC and -PC functioning

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Truly integrated long distance transport system

Definition based on maximising the efficiency and effectiveness of transport as well as supporting EU policies, in particular those related to transport, energy and environment. This deliverable will provide the structure for the routemapping activities e.g. defining targets, obstacles, regulatory issues.

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Recommendations for a sustainable TRA business model

Recommendations for a sustainable TRA business model

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Challenges Outline

Agreed set of challenges (physical, operational, economical, political) identifying the level of integration required and metrics to measure future implementation success.

This Deliverable will contain clear information on what needs to be changed for implementation success, what the target is and who the early enablers and adopters are to be, also the governance of the process required to reach consensus and implement the changes

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

\"Defining of the concept a \"\"truly integrated transport system for sustainable and efficient logistics” (ii)\"

\"Defining of the concept a \"\"truly integrated transport system for sustainable and efficient logistics” for both urban and long distance freight. Final version of report\"

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Guidelines for TRA2016 practical organisation

Guidelines for TRA2016 practical organisation (technical and communication aspects)

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31

Truly integrated urban transport system

Definition based on maximising the efficiency and effectiveness of transport as well as supporting EU policies, in particular those related to transport, energy and environment. This deliverable will provide the structure for the routemapping activities e.g. defining targets, obstacles, regulatory issues.

This Deliverable will contain clear information on what needs to be changed for implementation success, what the target is and who the early enablers and adopters are to be, also the governance of the process required to reach consensus and implement the changes

Programme: H2020-EU.3.4. - Topic(s): MG-9.6-2014

download deliverable 

Documents, reports 2019-05-31