Opendata, web and dolomites

NanoREG II project deliverables

The page lists 30 deliverables related to the research project "NanoREG II".

 List of Deliverables

NanoREG II: list of downloadable deliverables.
title and desprition type last update

Report on integrated safety assessment framework

Content : This deliverable will produce a set of conclusions derived from D2.2 and D2.3 on risk mitigation and management prior and after SbD applications.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Public version of D4.4

Public version of D4.4

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

perspectives on how regulations can keep pace with innovation (paper)

perspectives on how regulations can keep pace with innovation (paper)

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

report on NanoReg2 - OECD conference on grouping

A summary report on the conference with all presentations and a set of recommendations for grouping and its relationship to RA will be prepared. It will be presented as an official peer reviewed set of publications

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Final comparative risk assessment for candidate materials after SbD implementation in “hot spots” along the life cycle

Content : Candidate materials will be further assessed after SbD concept implementation following RA rules. This exercise will reveal if SbD has covered gaps identified prior to SbD implementation.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Initial standardisation plan

the first version of the Standardisation plan (a report) is ready.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Final Report on the barriers (and addressing thereof) to the application of grouping and Safety-by-Design Concepts.

Content:
This report will provide an summary of the results from the workshops, the survey and case studies in terms of the barriers to implementation of the SbD concepts how these barriers have been or can be addressed.
Impact:
SbD concepts can only be successfully introduced if accepted by relevant stakeholders. Early identification of the barriers to implementing such concepts will be critical in the acceptance and ensure that the SbD concepts and tools and SOPs are realistic.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Impact of the NANoREG II liaisons

Content:
Value of the liaison, synergy potential identified and integrated, acceptance of NANoREG’s SAFE INNOVATION approach and Safe-by-Design concept and recommendations to improve the liaisons.
Impact:
Lessons learned and recommendations to improve the efficiency and collaboration between the liaison partners and NANoREG II.
draft m12, update m24, final m36

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Training workshop

a training workshop is organised and held by INERIS.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-04-01

Final meeting

Organisation of the Final NANoREG II meeting (All participants, EC, invited speakers)

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-04-01

Document on outlook after TRL 5-6 and how it can be dealt within the Safe Innovation Approach

Content : Prediction report carrying the results of implementing the Safe Innovation Approach to a new level beyond NANoREG and NANoREG II, examining the practical implementation after TRL 5 including recommendations and analysis.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Document on the feasibility to come to organized pre-regulatory safety dossiers

Content : Report in which the regulatory relevance of specific MNM data has been collated and sorted in such a manner that it can give a prediction of the feasibility of attaining pre-regulatory safety dossiers. It will present the feasibility study of an organized pre-regulatory safety dossier, which may be brought in line with REACH requirements.
version at m18, revised and final m36

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Report on the defined ISA-TAB nano templates

Content: Report
Impact: Important for data sharing in particular in a regulatory accepted manner
recurrent, (M12, M24, M36)

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Database/structural model and report describing the relationships between functionality, physicochemical properties and hazard, and allowing for integration in the safe innovation approach

Content : This deliverable will describe the database model/structure that contains information on physicochemical characteristics and toxicity, and physicochemical characteristics and functionality on the other hand. The database will help to gain insight into physicochemical properties optimally leading to best achievable safety levels without compromising functionality.
This deliverable will be made in relation with the production of Task 1.6 [D1.5 and D1.8]
A first draft willbe deliver at M12, updated at M24 and final at M35.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Safe Innovations Guidance manual for decisions per gate

Content : A report describing an analysis of the (changing) role of various actors along the innovation chain and their potential incentives for interaction and information exchange at each stage. This analysis is needed to gain insight in the feasibility that the Safe-by-design approach will be implemented by various stakeholders.
A first draft willbe deliver at M12, updated at M24 and final at M35.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Report on Validated grouping approach

Content: This work will be done in close collaboration with Task 1.4 (D1.6) and describe the validation of the grouping approaches.
Impact: Highly important for regulatory acceptance (according to OECD criteria).

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

NANoREG II newsletter

NANoREG II regularly sends out a newsletters in electronic form to (a) people that sign up on the NANoREG II website to receive news, (b) NANoREG II liaison partners, and (c) any additional recipients deemed relevant.
updates every 6 months from m6 to m36

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-01

Organisation of a Kick-Off Meeting (All Participants, EC)

A kick off meeting will be made at the starting of the project, based on a 2 days schedule, combining general assemblees and technical sessions.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-04-01

NANoREG II website

the NANoREG II website will be launched

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-01

Implementation manual of the Safe Innovations Approach for all users

user guide and manual

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Report on existing Grouping Strategies (NANoREG, OECD, ECHA or others) and available datasets from other projects (e.g. NANoREG, NanoTEST, MARINA) State of the Art Analysis

Content: Report on the existing grouping strategies based on ongoing activities in other projects (e.g. NanoREG I, Nanosolution, NanoMile or others) or from organizations like OECD, ECHA, ECETOC. This will be compiled as an state-of the art description. In parallel we will identify available datasets for developing grouping from other finished or nearly finished projects.
Impact: This is the basis for our own work to be done in Task 1.4

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Final version of safe innovation approach, publication

Content : This deliverable will describe the principles and ideas of the Nanoreg II Safe Innovations approach and the implementation of this approach including the steps to achieve this.
As starting point for the implementation, the pivotal information to assess the risk potential of new nanomaterials, instruments and standard operational procedures will be proposed for each stage. Besides the implementation of the Safe Innovations approach, a blue print for the creation of trusted environments will presented. This will include a proposal for a pre-regulatory dossier addressing each stage of the industrial innovation process.
It will be the final report on the Safe Innovations approach, delivered at the end of the project duration but with a yearly draft starting at M6.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Report on Regulatory Needs for implementing grouping

Content: Report in the format of a careful review of the existing regulations in the various different sectors (e.g. REACH, biocide, cosmetic etc.).
Impact: Ensure that the contents, which will be developed by NanoREG meet the regulatory requirements.
This deliverable is PU as an extended consultation process would increase the acceptance.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Organisation of General Assemblies (All participants)

held each 12 months of the project

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-04-01

Overview of barriers and possible solutions for implementation of the Safe Innovations Approach

overview of the barriers to implementation of Safe by design, and list of potential solutions

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Document describing a blueprint for the creation of trusted environments per stage gate to share information among stakeholders/actors

Content : Report in which an analysis of required conditions and organization to create an environment in which stakeholders can share information relevant for decision making, each from their point of view, in how to proceed with new nanomaterials. The report will contain a template or blueprint for each stage gate, describing identifiable boundaries and tolerances (including IP issues) which provide interested stakeholders and actors with incontrovertible data for decision making at each gate.
draft m12, update m24 final m36

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Guidance on the practical implementation of SbD in the nano-technology community

Content:
This report will provide an overview of the SbD tools and SOPs developed based on the results of the case studies and other WPs.
Impact:
These tools and SOPs will provide an critical contribution to the overall acceptance of the SbD concepts.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Final Standardisation plan

the final version of the standardisation plan is ready.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Progress review reports by industrial technical advisors on the overall progress of the project and on progress within each Workpackage, Delivery (before EC review)

Progress review reports by industrial technical advisors on the overall progress of the project and on progress within each Workpackage, Delivery (before EC review)

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01

Report on PPPs

Building on the agreement achieved in WP6, a report on PPPs is developed and finalised.

Programme: H2020-EU.2.1.2.2.;H2020-EU.2.1.2.5. - Topic(s): NMP-26-2014

download deliverable 

Documents, reports 2020-04-01