The page lists 37 deliverables related to the research project "PROMOTION".
title and desprition | type | last update |
---|---|---|
CBA methodology for offshore gridsBased on the existing ENTSO-E Guideline for Cost Benefit Analysis of Grid Development Projects and on recommendations issued by Task 7.2, this task will formalize a CBA methodology adequate for offshore grids. The main indicators that must be computed in a CBA will be defined, and guidelines on the approach that must be followed to compute them will be defined. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Intermediate document on tasks 7.2 for stakeholder consultation.The interim document will contain the draft proposals on the economic regulatory properties of an EU framework, covering a range of proposals on e.g. cross border cost –benefit allocation, revenue models and investment incentives. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Document on recommendations for specifying DC GIS systmemsA guideline for correctly specifying, i.e. determining the ratings, of DC GIS for application in offshore HVDC meshed networks will be provided in this deliverable. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Report on the re-evaluation of the requirements based on results by other WPsThe requirements that have been set in MS2 are re-evaluated within the project and if adaptations are needed, agreed upon and shared within the project. This will avoid incompatibilities in the final result of the project which result from incompatible requirements. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Preliminary analysis on key technical, financial, economic, governmental, regulatory and market barriers and a related portfolio of solutionsPreliminary analysis on all necessary building blocks for the development of the future European offshore grid. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Performance of ancillary services provision from WPPs connected to DR-HVDCThe deliverable will include the simulation results for the capabilities of DR_HVDC connected WPPs to provide ancillary services. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Test case overviewOverview of all defined test cases to be investigated on the test bench Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Intermediate document on tasks 7.3 for stakeholder consultationFinanceability is related on the one hand related to the regulatory framework which is established by tasks 7.1 and 7.2 but also on the the possibilities on funding and investor participation. This document will contain draft proposals including as assessment of the appropriate governace model for a North Sea grid. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Exploitation PlanExploitation Plan Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Software and analysis report on candidate test-circuits and their effectivenessSoftware for the characterization of candidate test circuits based on capacitor, reactor and AC generator storage sources Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Report with the compliance test procedures for DR and VSC connected WPPsThe report will describe in detail the proposed test procedures for compliance evaluation, for wind turbine and wind power plant level. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Document on test requirements, procedures and methodsThis document will provide a comprehensive list of test requirements, i.e. aspects of DC GIS that need to be verified prior to installation, and test procedures, i.e. how to verify those aspects, and methods i.e. the test circuits. The deliverable will ensure close alignment with existing and ongoing standardization techniques. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Executive summary of project interim and final reportWP 14 supports WP 13 in editing and layouting interim and final reports. The content and final responsibility of project reporting has WP 14. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Intermediate document on tasks 7.1 for stakeholder consultationThis interim document contains the draft conclusions on an alternative legal framework for the development of a north sea offshore grid. The recommendation could be to propose additional legislation, Member State agreement or a combination thereof. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Operation of WPPs connected to DR-HVDCA report that will present the results of the operation of WPPs connected to DR-HVDC, including startup, normal and disturbance operations Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Report on the broad comparison of protection philosophies for the identified grid topologiesBased on a literature study, a shallow analysis of selected protection methods is performed using the developed test grids and the benchmark scenarios. The report explores various approaches and identifies those methods that are robust for fault detection and the system effects of the fault occurrence and the fault clearing. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Document on test requirementsList of test requirements from an electrical point of view: rate-of-rise of current, current interruption and commutation, transient voltage inception, energy dissipation, reclosing time and stresses. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Document on test proceduresList of procedures to pass through in testing Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Offline models for mechanical DC CBsThese models will represent basic functions and limitations of mechanical DC CB as required for protection system development Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Other | 2020-03-25 |
Report with a synthesis of the available studies on offshore meshed HVDC grids and related barriers/gaps at the inception of the projectNumerous studies have been carried out on the topic of (meshed) offshore grids. Their lessons learned are captured and connected in a report that is used as input for D1.5 Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Offline models for hybrid DC CBsThese models will represent basic functions and limitations of hybrid DC CB as required for protection system development. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Other | 2020-03-25 |
Report and computer demonstration with a draft roadmap and reference off –shore grid expansion planThe draft roadmap is described in this deliverable. It is taking into account the development pace of off-shore wind and technical and economic factors. A business case is made to assess the viability. The initial roadmap and some typical flows are visualised interactively on a geographic map. This initial roadmap will be enriched by WP12 Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Guiding principles / catalogue with requirements for other work packagesThe list of requirements that have been delivered in MS1 is quantified in this deliverable at MS2 Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
External Communication via marketing material and media workTo ensure a wide distribution of the project SOW will prepare and support external communications activities e.g. media work (press briefings), multimedia formats, Youtube channel, display tools, Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Websites, patent fillings, videos etc. | 2020-03-25 |
Mailing list - regularly updatedThe targeted mailing list is based on the input of all project partners and will contain contact details of relevant policy and industry stakeholders Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Websites, patent fillings, videos etc. | 2020-03-25 |
Establishment of internal/external Project information systemThe main communication tool for this project will be the website with its intranet function. This function will enable the exchange of internal knowledge and data within the partnership. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Websites, patent fillings, videos etc. | 2020-03-25 |
Publications (x number of papers, articles, reports, conf. presentations …)Partners will publish articles and papers based on the progress and the results of the project. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Newsletter – bi-annualThe project newsletter will be distributed twice a year. It will contain project results and activities, as well as project related topics and the findings of other related projects. For the content generation of the newsletter input from the other partners is an absolute must. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Websites, patent fillings, videos etc. | 2020-03-25 |
Report on fault stress analysis for the various technologiesDescription of the electrical stresses during the interruption process at each DCCB technology offered Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Report documenting results of the questionnaire on best practicesA questionnaire is sent out to manufacturers, developers, TSOs, governments, regulators and academia to capture the gained experience in the existing built or planned offshore grid. The results of this questionnaire is consolidated and used as an input for the requirements in D1.5 Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Detailed functional requirements to WPPsThe deliverable will cover, both DR and VSC concepts, both compared to conventional AG grid connection requirements. It will also include specifications for WTG and aggregated wind park models Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Stakeholder interactionTo ensure the interaction with stakeholders an Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Other | 2020-03-25 |
Development of Project IdentityThe project identity will contain a project logo, a claim and a corporate design, e.g. templates for power point presentations, reports and papers, flyers, rollups. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Websites, patent fillings, videos etc. | 2020-03-25 |
Report with reference scenario and related offshore meshed HVDC grid topologyThe scenarios for installed generation and demand development are described in this deliverable. This includes both on- and offshore figures which are in input for the business case study. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Specifications of the control strategies and the simulations test casesThe report contains the detailed specifications and requirements for the control of WT/WPP and it describes the test cases used to verify in simulations the proposed controllers. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Report describing the fault analysis severity versus fault locationStatistically base study of faults in CIGRE test system to identify worst fault case scenario and its probabilistic distribution Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |
Detailed description of the requirements that can be expected per work packageFor each technical requirement that is quantified in WP1, items that are used per WP are listed. This gives a comprehensive insight in which requirements are commonly used by multiple WPs. Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2015 |
Documents, reports | 2020-03-25 |