Opendata, web and dolomites

DiSIEM project deliverables

The page lists 17 deliverables related to the research project "DiSIEM".

 List of Deliverables

DiSIEM: list of downloadable deliverables.
title and desprition type last update

Fully operating, integrated visualisation system with diverse SIEMs

This deliverable will encompass all the visualisation related modules that work in harmony with the underlying systems and fulfill all the functionalities required. This deliverable will be the main result of task T5.2, T5.3 and T5.4.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-11-22

Refinements of the models and metrics based on pilot deployments

This deliverable presents the updates and refinements of the models and metrics defined in D3.1 and D3.2 based on feedback received from deployments in WP7. This deliverable will be the main result of task T3.3.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-11-22

Results of the competition on machine learning for security

This will report the results of the two iterations of the threat prediction machine learning competition that will be organized by the consortium and sponsored by the project. This document should report everything about the competition, including technical details about the wining algorithms and what was learned at the end.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-11-22

Validation plan

Definition of the methodology and criteria for validating the components considering the different environments provided by EDP, Amadeus and ATOS. This deliverable
will be the main result of T7.1.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-11-22

Early-stage prototypes

The prototype will provide the proof-of-concept and will be later used in evaluation activities. Also, interactive visualisation system where the visualisations are operating in a linked, expendable fashion. This deliverable will be the main result of tasks T5.2 and T5.3.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-11-22

Security metrics and measurements

This deliverable presents a detailed analysis of the reviewed security metrics and defines the metrics that we plan to integrate in the SIEMs. This deliverable will be the main result of task T3.1

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Preliminary architecture and service model of infrastructure enhancements

This deliverable presents a detailed description of the design and underlying assumptions of the components developed in the work package. This represents the partial results of T6.1, T6.2 and T6.3.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Visualisation system infrastructure and requirement analysis

This report includes results that will inform and enable later stages of visualisation related developments. This deliverable will be the main result of task T5.1

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Probabilistic modelling of diversity for security and of security trends

This deliverable presents a detailed analysis of developed, evaluation and validation of the probabilistic models in T3.2. This deliverable will be the main result of task T3.2.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

In-depth analysis of SIEMs extensibility

This deliverable will present an indepth analysis of the state of the art in SIEM systems, with particular focus on how such systems can be extended with custom connectors and new event visualisation tools. D2.1 will be the main result from T2.1.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Internal and external IT communication infrastructure

The external IT communication infrastructure constitutes a guideline for communication of the DiSIEM project to external target groups including conferences, marketing measures and communication channels. Furthermore this deliverable constitutes the launch of the internal DiSIEM communication infrastructure including the establishment of mailing lists, an internal file repository (with version control), and the project website. This deliverable is marked with nature “DEC” and will be accompanied by a small written report outlining its structure and purpose in order to justify the achievement of this deliverable. This deliverable will be a first initial result of T8.1.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Techniques and tools for OSINT-based threat analysis

This deliverable presents an in-depth analysis of the security-related OSINT data sources and how the information from these sources can be extracted, including a description of tools and methods that can be employed for this. It will also contain some initial study of the models and techniques that can be used to process OSINT data for predicting threats against a given organisation. This deliverable will report the main results of T4.1 and some preliminary results of T4.2.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Data management plan

This deliverable will establish the main elements of the data management policy that will be used by the applications with regard to all the datasets that will be gathered, generated and used by the project. Such datasets are fundamental for the DiSIEM project, as most of its components aim to extract useful information from big data (collected events, open-source intelligence, etc.) The data management plan is not a fixed document, but evolves during the lifespan of the project. More developed versions of the plan can therefore be included as additional deliverables at later stages. According to the Guidelines on Data Management in H2020, the data management plan should address data set reference and name, data set description, standards and metadata, data sharing and archiving and preservation (including storage and backup) on a dataset by dataset basis and should reflect the current status
of reflection within the consortium about the data that will be produced.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Risk assessment plan

The Risk assessment plan will include a Critical Path Analysis (CPA) of the main project activities, identifying risk points, and procedures to deal with them. This deliverable is also a result from T9.1.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

OSINT data fusion and analysis architecture

This deliverable describes the machine learning techniques and tools used to analyse the OSINT information to identify security-related trends and predict threats to the managed infrastructure. This includes detailed models and algorithms to be
implemented on OSINT-based threat predictors. This deliverable will be the main result of T4.2.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Reference architecture and integration plan

This deliverable documents the DiSIEM reference architecture and how the contributions devised in work packages 3-5 will be integrated in existing SIEM systems. This report will be the main results from T2.2 and T2.3.

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Documents, reports 2019-07-26

Project quality plan

\"The project quality plan (the project handbook) constitutes a set of project templates, explanations on the project management process, review process, quality checks, meeting organisation, which is communicated to all partners. This deliverable is marked with nature \"\"OTHER\"\" (software, technical diagram, etc.) and will be accompanied by a small written report outlining its structure and purpose in order to justify the achievements of the deliverable. This is a result from T9.1.\"

Programme: H2020-EU.3.7. - Topic(s): DS-04-2015

download deliverable 

Other 2019-07-26