The page lists 39 deliverables related to the research project "INTERMODEL EU".
title and desprition | type | last update |
---|---|---|
Final dissemination brochure completed and available for distributionFinal dissemination brochure completed and available for distribution Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Websites, patent fillings, videos etc. | 2020-04-09 |
Summary of results of work packages 2-7 and implications. Recommendations for new and to be renewed intermodal terminals (functional, economic, and environmental perspective). (Month 8)Summary of results of work packages 2-7 and implications. Recommendations for new and to be renewed intermodal terminals (functional, economic, and environmental perspective). (Month 8) Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Communication Plan 6Communication Plan 6 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Non-confidential project report for further public dissemination.Non-confidential project report for further public dissemination. Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Websites, patent fillings, videos etc. | 2020-04-09 |
Assessment of rail interconnection resilienceAssessment of rail interconnection resilience Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Conference paper 4: Logistics Congress in Darmstadt ICPLT 2019Conference paper 4: Logistics Congress in Darmstadt ICPLT 2019 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Assessment of the rail interconnection pilot casesAssessment of the rail interconnection pilot cases Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Assessment and validation workshops onsite at selected terminals with local specialistsAssessment and validation workshops onsite at selected terminals with local specialists Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Set of Key Performance Indicators for assessing and operating intermodal terminals (functional, economic and environmental perspective)Set of Key Performance Indicators for assessing and operating intermodal terminals (functional, economic and environmental perspective) Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 3Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 3 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Assessment (meta study) of current transportation and logistics studies and trade statisticsAssessment (meta study) of current transportation and logistics studies and trade statistics Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Data Management plan 1Data Management plan 1 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
BIM Execution Plan GuidelineBIM Execution Plan Guideline Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Risk and contingency plan. Month 6. Updated every six months. 1Risk and contingency plan. Month 6. Updated every six months. 1 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Operational simulation simulation model of the second real-life case.Operational simulation simulation model of the second real-life case. Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Demonstrators, pilots, prototypes | 2020-04-09 |
External mobility simulation modelExternal mobility simulation model Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Demonstrators, pilots, prototypes | 2020-04-09 |
Risk and contingency plan. Month 6. Updated every six months. 3Risk and contingency plan. Month 6. Updated every six months. 3 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
BIM model Demonstration of both real locationsBIM model Demonstration of both real locations Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Demonstrators, pilots, prototypes | 2020-04-09 |
Operational simulation simulation model of the first real-life case.Operational simulation simulation model of the first real-life case. Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Demonstrators, pilots, prototypes | 2020-04-09 |
Communication Plan 5Communication Plan 5 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Risk and contingency plan. Month 6. Updated every six months. 4Risk and contingency plan. Month 6. Updated every six months. 4 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Conference paper 1: Integrated planning environment in terminal projectsConference paper 1: Integrated planning environment in terminal projects Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Integrated planning environment architectureIntegrated planning environment architecture Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Data Management plan 2Data Management plan 2 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Website and intranetWebsite and intranet Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Websites, patent fillings, videos etc. | 2020-04-09 |
Risk and contingency plan. Month 6. Updated every six months. 2Risk and contingency plan. Month 6. Updated every six months. 2 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Definition and description of functional, economic and environmental analysis.Definition and description of functional, economic and environmental analysis. Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Risk and contingency plan. Month 6. Updated every six months. 5Risk and contingency plan. Month 6. Updated every six months. 5 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Requirements for terminal projectsRequirements for terminal projects Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Communication Plan 2Communication Plan 2 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Communication Plan 3Communication Plan 3 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Study of the state of the art and description of KPI and KRI of terminals, hinterland mobility and rail networkKPI and KRI of terminals, hinterland mobility and rail network Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 2Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 2 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 1Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 1 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Electronic project brochure completed and available for distributionElectronic project brochure completed and available for distribution Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Websites, patent fillings, videos etc. | 2020-04-09 |
Communication Plan 1Communication Plan 1 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Conference paper 3: Key Performance Indicators for intermodal freight terminals.Conference paper 3: Key Performance Indicators for intermodal freight terminals Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Communication Plan 4Communication Plan 4 Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Documents, reports | 2020-04-09 |
Conference paper 2: Decision support for owners of terminal projects (VTT; WP1; M26)Conference paper 2: Decision support for owners of terminal projects (VTT; WP1; M26) Programme: H2020-EU.3.4. - Topic(s): MG-8.4a-2015 |
Websites, patent fillings, videos etc. | 2020-04-09 |