The page lists 9 deliverables related to the research project "COFRARE 2.0".
title and desprition | type | last update |
---|---|---|
NDI reports for coupons, elements and sub-componentsNDI and descructive analysis reports for coupons, elements and sub-components Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-04-18 |
Final report including final TRL evaluation and certificability monitoringFinal report including final TRL evaluation and certificability monitoring Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-04-18 |
Coupons, elements and sub-components test reports and results analysisCoupons, elements and sub-components test reports and results analysis Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-04-18 |
Design of full scale sector composite frame demonstratorREport and CAD/CAE data Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-04-18 |
Final manufacturing and cost/weight assessment reportFinal manufacturing and cost/weight assessment report Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-04-18 |
Test Plan for level 2 and 3Test Plan for level 2 and 3 Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-05-30 |
Technology Development Plan for manufacturingtrials and preliminary cost estimationTechnology Development Plan for manufacturing trials and preliminary cost estimation for the selected processes with an overviwe if the benchmark and of the state of the art. Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-05-30 |
Test Plan for level 1Structural, chemical and physical test for coupons Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-05-30 |
Configuration/process selection and preliminary cost/weight estimation trade-off reportConfiguration/process selection and preliminary cost/weight estimation trade-off report based on the manufacturing trials. Programme: H2020-EU.3.4.5.4. - Topic(s): JTI-CS2-2015-CFP02-AIR-02-16 |
Documents, reports | 2019-05-30 |