Opendata, web and dolomites

ARGO project deliverables

The page lists 11 deliverables related to the research project "ARGO".

 List of Deliverables

ARGO: list of downloadable deliverables.
title and desprition type last update

Detailed project plan including team set-up

A detailed project plan including team set-up will be prepared by the Coordinator. The Coordinator will keep the plan updated constantly during the overall project life, including modifications that can arise during the project development.

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Documents, reports 2020-03-11

ARGO 1.0 F.M. assessed performance through on ground qualification tests

Description and results of testing through on ground facilities, for ARGO 1.0 assessment at TRL8 (Task 6.1)

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Documents, reports 2020-03-09

ARGO 1.0 Flight Model Demonstrator

Flight Model Demonstrator to be used to assess the innovative product performance by tests carried out by night sky test campaign (Task 6.1) and final dedicated IOD Mission (Task 6.4).

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Demonstrators, pilots, prototypes 2020-03-09

User manual of ARGO 1.0 Flight Model

The user manual will describe the attitude measuring system output data together with the allowed working conditions and relative performance.

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Documents, reports 2020-03-09

ARGO 1.0 E.M. assessed performance through night sky test

Performed assessment tests and results achieved both in laboratory and with the night sky test campaign performed in Task 4.2.

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Documents, reports 2019-07-18

Communication actions and updated dissemination material - release 1

Communication actions performed within the project & Dissemination Material prepared within Task 7.1. to be added to Periodic Reports.

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Documents, reports 2019-07-18

ARGO 1.0 E.M. Demonstrator

Demonstrator to assess the innovative product performance by tests carried out by night sky test campaign (Task 4.2) and early shared IOD or balloon (WP 5).

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Demonstrators, pilots, prototypes 2019-07-18

Hardware Components User Manual

The User manual of ARGO 1.0 hardware components will be provided, suitable for ARGO 1.0 integration.

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Documents, reports 2019-07-18

Dissemination material

Dissemination Material prepared within Task 7.1 to facilitate since the project beginning the communication actions towards end-users and relevant stakeholders.

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-07-18

Requirement Specification and Test Plan

ARGO 1.0 performance specifications and test plan for assessing the prototype expected performance from TRL6 to TRL9

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Documents, reports 2019-07-18

Performance assessed by tests performed in simulated environment

The report will describe the test performed within Task 2.2 and the obtained results.

Programme: H2020-EU.2.1.6.;H2020-EU.2.3.1. - Topic(s): SMEInst-04-2016-2017

download deliverable 

Documents, reports 2019-07-18