Opendata, web and dolomites

CL-Windcon project deliverables

The page lists 27 deliverables related to the research project "CL-Windcon".

 List of Deliverables

CL-Windcon: list of downloadable deliverables.
title and desprition type last update

Integrated wind farm controllers

In this deliverable wind farm control technologies from deliverables 2.1, 2.2 and 2.3 will be combined and further assessed. As the usual assumptions for the validity of the aeroelastic tools is exceeded in the advanced control concepts more advanced tools will be used to evaluate certain critical conditions like e.g. stability issues for various technologies.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Documentation of test campaigns

Wind tunnel tests of the combined controllers for individual wind turbines and wind farms are accomplished, and all relevant experimental results are available. Wake deflection as a function of operational parameters (misalignment and environmental conditions) is characterized and the relevant test data is available.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Optimized farm layout

SimWindFarm (Engineering wind farm simulator) is used to produce an average model of wakes and turbulence. A two dimensional distribution of wind velocity and direction is used to calculate tower loads, drive train loads, and power production resulting in an assessment of layout options.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Cost-Benefit Analysis

A report on the economics of the new control technology on the scale of a Life Cycle (Cost) Assessment giving guidance on the dominating effects and potential for optimization when implementing the technology in existing and future wind farms.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-23

Final validation report

This will include a comparison of simulations against scaled tests in wind tunnel and the calibration of model parameters such as to obtain best match between simulations and wind tunnel experiments. In addition, a comparison of simulations against full scale field testing, with the calibration of model parameters such as to obtain best match between simulations and field tests. Finally, analysed data coming from open loop filed tests and if available, documentation of results from closed-loop wake deflection algorithms in field tests.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Review on Standards and Guidelines

A report detailing the missing link between new technology and existing standards in the area of safety and protection systems, grid code compliance and design load cases. Recommendations are derived to be used as input to new Standards.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-24

Demonstration of combined turbine / farm level controls by simulations

Controllers that operate at the combined wind-turbine/wind-farm level are demonstrated in a simulation environment.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-03-23

Minimal loading power curtailment control techniques

A power curtailment strategy that minimizes the wind farm loading.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Control methodology for induction based control and for wake redirection control

An induction based feedforward-feedback controller design methodology that finds the optimal control settings. A yaw based feedforward + feedback controller design methodology that finds the optimal yaw control settings.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Assessment of controller key performance indicators & Guidelines on controller application for the management of existing wind farms

A complete report containing the comparison of the KPIs analyzed in task 4.1.1 and 4.1.2. The assessment of component loading on the individual wind turbine level is used to derive wind farm level implications in task 4.2 and formulation of reliability levels in task 4.4. A complete report containing the comparison of the KPIs analyzed in task 4.1.1 and 4.1.2. The assessment of component loading on the individual wind turbine level is used to derive wind farm level implications in task 4.2 and formulation of reliability levels in task 4.4.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Feasibility by re-design

A report detailing the new redesigned wind turbine and the new wind farm, both designed taking into account the wind farm control algorithms. The guidelines for wind turbine and wind farm redesign will also be included. This report will also analyze the KPIs for wind turbine, in terms of loads, and also for the wind farm.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Operation and maintenance cost modelling

A report on the developed O&M cost model including the results of implemented probabilistic cost scenarios. The scenarios include a baseline formulation in offshore and onshore conditions, documentation of updated reliability values due to introduced new control technology and presentation of improvement potential in O&M strategies. The parameterized model is used to determine the O&M costs needed for Task 4.5.1.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Definition of wind tunnel testing conditions

The operating conditions for wind tunnel testing are defined in terms of all relevant parameters. This also leads to the definition of the testing matrix, and to an exact schedule of all wind tunnel experiments.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Report Communication Plan and clustering with other projects (first version)

Communication Plan and educational program, M14, revision M18. It will include visual identity and communication material. Relation of activities to reinforce project messages through networking.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Process Handbook and documents templates

Process Handbook including rules for reports writing, project image, revision rules, etc.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

A common pre- and post-processor for wind farm simulations

The deliverable includes the implementation of the common pre- and post-processor and a user manual, which describes how the tools can be used by all participants and the interface definition. Software and user manual will be uploaded to the public web site.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2020-01-21

Methodology for active load control

An event-triggered IPC algorithm will be developed, and integrated with the WT controller for the reference machines defined in WP1, so it can be used in task 2.4. An overview of alternative wake control methodologies using advanced flow actuators.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Definition of reference wind farms and simulation scenarios

The defined reference wind farm layouts with wind turbines and corresponding baseline reference controllers will be described and specified simulations scenarios for wind farm control will be introduced to enable a classification of the developed models and a comparison for the different technologies developed in WP 2.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

On line collaboration platform

Project management through a dedicated Platform based on Emdesk or similar in parallel to the Web site.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-01-21

Definition of field-testing conditions

The operating conditions for field testing are defined in terms of all relevant parameters. This also leads to the definition of the configuration of all supporting equipment.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Minimal loading wind turbine de-rating strategy and active yaw controllers

An optimal derating strategy will be described and a WT controller for the reference machines defined in WP 1 will be provided, so it can be used by Partners for induction based control. In addition, an active yaw controller for the reference machines defined in WP1 will be developed, and provided to Partners for wake redirection control. This controller will be integrated with the controller of subtask 2.1.1, so that it can be used in task 2.4.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Hardware and infrastructure conditions for energy capture and fatigue improvements

The report will describe how the proposed wind farm control affects the operations of existing wind farms in terms of energy capture, hardware, and communication infrastructure and power system compliance. The report will identify which of the developed techniques are applicable to existing wind farms.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Classification of control-oriented models for wind farm control applications

The developed control-oriented models of task 1.2 will be classified with respect to their capabilities. The descriptions include conditions under which the developed models can be used for the various applications in WP 2.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Testing in the wind tunnel of wind turbines controllers

Wind tunnel tests of the controllers for individual wind turbines are accomplished, and all relevant experimental results are available.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Demonstration of wind turbine controllers and supporting technologies by simulations

Controllers for individual wind turbines are demonstrated in a simulation environment. Also supporting technologies that operate at the level of single wind turbines, as for example wind observers, are similarly demonstrated.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21

Description of the reference and the control-oriented wind farm models

The deliverable includes the implementation of the reference wind farms in SOWFA and a user manual, which describes how the simulations can be repeated by all participants. Software and user manual will be uploaded to the public web site. In addition, the deliverable includes the implementation of the different control-oriented wind farm models and a user manual, which describes how the models can be used by all participants. Software and user manual will be uploaded to the public web site.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Other 2020-01-21

Report Communication Plan and clustering with other projects (revision)

Communication Plan and educational program, M6, revision M18. It will include visual identity and communication material. Relation of activities to reinforce project messages through networking.

Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017

download deliverable 

Documents, reports 2020-01-21