Opendata, web and dolomites

ToyLabs project deliverables

The page lists 20 deliverables related to the research project "ToyLabs".

 List of Deliverables

ToyLabs: list of downloadable deliverables.
title and desprition type last update

ToyLabs Added-Value Components Design and Development-final version

D3.5- ToyLabs Added-Value Components Design and Development-final version [M18] - SLG
D3.4 will include input from all tasks to generate an updated and last version of the ToyLabs Added-Value Components Design and Development and a revised version of technical requirements. This deliverable will finalize the development of the different components and will provide their whole functionalities as firstly identified in D3.1 and updated in the context of this deliverable.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Other 2019-05-31

Final Dissemination, Communication, Community Engagement Report

D6.3- Final Dissemination, Communication, Community Engagement Report [M18] - AIJU
This deliverable aims to provide the final report on all dissemination, communication and community engagement activities performed during the 2nd reporting period of the project.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

Updated ToyLabs Concept Definition, Stakeholders’ Requirements and Validation Framework-final version

D1.3- Updated ToyLabs Concept Definition, Stakeholders’ Requirements and Validation Frameworkfinal
version [M16] - NTUA
After the second phase of WP1, D1.3 will include input from all tasks to generate an updated version of the ToyLabs concept and a revised version of stakeholders’ requirements and ToyLabs Validation Framework.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

Dissemination, Communication and Community Engagement Plan-v1

D6.1- Dissemination, Communication and Community Engagement Plan-v1 [M2] - AIJU
This deliverable is related to the provision of a detailed plan for all dissemination and communication activities as well as the provision of a solid plan for the enhancement of community engagement that will be scheduled for the following project’s period until the 1st report under D6.2 [M12].

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

Integrated Platform Design and Developmentv2 and Platform Validation-v1

D4.3- Integrated Platform Design and Development-v2 and Platform Validation-v1 [M15] - SLG
This second release of the Integrated ToyLabs platform will introduce new features, fixes and optimisations, while it will also include a section providing an update on the initial architecture and the integration plan.
First platform’s testing results will be also provided in this deliverable, as a first release of Platform’s Verification and Validation.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Other 2019-05-31

Documentation on Pilot Scenarios Executionv1

D5.2- Documentation on Pilot Scenarios Execution-v1 [M13] – FABLAB LECCE
This deliverable will provide documentation of the pilots operation and execution. This first report will serve as substantial feedback for the refinement of the platform.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

Exploring Progress and Innovation in ToyLabs Tackled Domains and ToyLabs Concept Definition- v1

D1.1- Exploring Progress and Innovation in ToyLabs Tackled Domains and ToyLabs Concept
Definition- v1 [M3] - AIJU
This deliverable is related to the activities to be performed under Task 1.1 and Task 1.2, and will provide a compendium showing the main progress recorded in the ToyLabs relevant domains and best practises that should be taken into consideration for the implementation of the ToyLabs project, recommending also tools, components and mechanisms that should be taken under consideration by the technical partners. Afterwards, it will clarify ToyLabs’ concept while positioning it in the Toy Industry Business Landscape.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

Updated Pilot Scenarios Execution and Pilots Evaluation-final version

D5.3- Updated Pilot Scenarios Execution and Pilots Evaluation-final version[M18] - FABLAB LECCE
This deliverable will provide updated documentation of the pilots operation and execution and will also document all lessons learnt from the project, constituting methodological adoption guidelines for the utilisation of the ToyLabs platform for future related scenarios. Impact assessment measurements for the two pilots are also part of this final deliverable for WP5.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

ToyLabs Added-Value Components Design and Development-v3

D3.4- ToyLabs Added-Value Components Design and Development-v3 [M14] - SLG
D3.4 is the updated version of D3.3 for the ToyLabs Added-Value Components Design and Development

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Other 2019-05-31

Stakeholders’ Requirements Identification and Validation Framework Determination- v1

D1.2- Stakeholders’ Requirements Identification and Validation Framework Determination- v1 [M6] -
NTUA
This deliverable will conduct certain high-level usage scenarios that will lead to extraction of concrete requirements to be used for the methodology and the platform. Additionally, the framework for ToyLabs Validation and Impact Measurement will be initially described in the context of this deliverable.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

ToyLabs Open Innovation and Co-creation Integrated Methodology-v1

D2.1- ToyLabs Open Innovation and Co-creation Integrated Methodology-v1 [M6] - NTUA
This deliverable will be the direct outcome of all WP2 tasks and will contain the integrated methodology that will drive the usage of the ToyLabs platform

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

ToyLabs Added-Value Components Design and Development-v2

D3.3- ToyLabs Added-Value Components Design and Development-v2 [M10] - SLG
D3.3 is the updated version of D3.2 for the ToyLabs Added-Value Components Design and Development.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Other 2019-05-31

ToyLabs Open Innovation and Co-creation Integrated Methodology-final version

D2.2- ToyLabs Open Innovation and Co-creation Integrated Methodology-final version [M13] - NTUA
This deliverable is the second version of the methodology and will be essentially an update of D2.1

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

ToyLabs Integrated Platform Design, Development and Validation- final version

D4.4- ToyLabs Integrated Platform Design, Development and Validation- final version [M18] - SLG
This is the final release of the Integrated ToyLabs platform that will introduce new features, fixes and optimisations as a result of the work performed in this WP, as well as the feedback gained from pilot’s execution and testing. Updates on the initial architecture and the integration plan, will be also available. Finally, all testing of the different components and artefacts that has been implemented during this final
development phase will be reported in this deliverable, D4.4, to provide proper Quality Assurance for the software that has been produced.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Other 2019-05-31

Technology Requirements and ToyLabs Components Analysis-v1

D3.1- Technology Requirements and ToyLabs Components Analysis-v1 [M6] - SLG
This deliverable will identify the technical requirements for the ToyLabs components and interfaces and will analyse the functionalities of each of them.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

Integrated Platform Design and Developmentv1

D4.2- Integrated Platform Design and Development-v1 [M11] - SLG
These deliverable will provide the first release of ToyLabs Integrated Platform (including the fronted used by toy manufacturers and the frontend used by the community). In this first release, the components will have been integrated but without providing their full functionalities. This deliverable will also include all relevant
documentation and guides for the operation, maintenance and possible extension of the platform and of the different tools, as part of the project’s open source sustainability strategy.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Other 2019-05-31

First Dissemination, Communication and Community Engagement Report and Updated Plan

D6.2- First Dissemination, Communication and Community Engagement Report and Updated Plan
[M12] - AIJU
This deliverable will report on all activities performed during the 1st reporting period of ToyLabs until M12 and will also provide a plan for all dissemination, communication and community engagement activities that will be scheduled for the 2nd reporting period of the project, from M12 until the end of the project [M18].

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Documents, reports 2019-05-31

ToyLabs Added-Value Components Design and Development-v1

D3.2- ToyLabs Added-Value Components Design and Development-v1 [M7] - SLG
D3.2 is the first version for the design and development of the identified ToyLabs added-value components.
D3.2 includes early mock-ups for each of these components, architecture diagrams, all design documents as well as the release of the so far implemented MVP features.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Data Management Handling Plan

This deliverable is related to the detailed plan about which data will be collected and generated during the project and how it will be shared and opened. This information is essential to decide the best sustainability model for project results and disseminate according to this plan the open data provided by the project. The deliverable will be updated at end of the project. An updated report will be provided in D7.5 at the end of the project.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Open Research Data Pilot 2019-05-31

Collaboration Platform Design and Development- v1

D4.1- Collaboration Platform Design and Development- v1 [M8] - SLG
This deliverable will include the initial architecture for the development of ToyLabs Collaboration Platform, a first release for the Collaboration Platform and the integration plan for the added-value components.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-21-2016

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31