Opendata, web and dolomites

PJ06 ToBeFREE project deliverables

The page lists 4 deliverables related to the research project "PJ06 ToBeFREE".

 List of Deliverables

PJ06 ToBeFREE: list of downloadable deliverables.
title and desprition type last update

Solution PJ06-02 V2 Data Pack

Solution PJ06-02 V2 Data Pack content:
• OSED/SPR/INTEROP V2
• Report of Technical specification (TS) and Interface requirements (IRS) check
• CBA V2

Programme: H2020-EU.3.4.7. - Topic(s): SESAR.IR-VLD.Wave1-13-2015

download deliverable 

Documents, reports 2020-03-11

Solution PJ06-01 V3 Data Pack

Solution PJ06-01 V3 Data Pack content:
• OSED/SPR/INTEROP V3
• Report of Technical specification (TS) and Interface requirements (IRS) check
• CBA V3

Programme: H2020-EU.3.4.7. - Topic(s): SESAR.IR-VLD.Wave1-13-2015

download deliverable 

Documents, reports 2020-03-11

Final Project Report

Final Project Report

Programme: H2020-EU.3.4.7. - Topic(s): SESAR.IR-VLD.Wave1-13-2015

download deliverable 

Documents, reports 2020-03-11

Solution PJ06-02 V1 Data Pack

Solution PJ06-02 V1 Data Pack content:
- OSED V1

Programme: H2020-EU.3.4.7. - Topic(s): SESAR.IR-VLD.Wave1-13-2015

download deliverable 

Documents, reports 2020-03-11