The page lists 24 deliverables related to the research project "5G-TRANSFORMER".
title and desprition | type | last update |
---|---|---|
D7.5 – Final Project ReportThis report constitutes the non-financial part of the Final Report to be delivered after the end of the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D5.3 – Experimentation results and evaluation of achievements in terms of KPIsThis deliverable presents evaluation results of the experimentation and demonstration. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D1.3 – 5G-TRANSFORMER refined architectureThis deliverable is an update of D1.2 and it describes the refined system design considering the feedback from the results of other technical WPs. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D6.4 – Technical and Exploitation Workshops held during second yearThe project commits to organise at least a workshop on the technical contents of the project during the second year and an internal Exploitation workshop intended to maximise and find new ways of exploiting the results produced by the project. This deliverable corresponds to both workshops. As metrics for validation, we will check the attendance and will produce a satisfaction poll on the audience. The workshop will be satisfactory if the poll results in higher than 70% of positive votes. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Other | 2020-02-27 |
D3.3 – Final design and implementation report on the Vertical Slicer (report)This deliverable reports on the algorithms of the VS and the extensions of MEC services, application specific monitoring, and extensions of the virtualization platform, focusing on T3.2 and T3.3. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D5.4 – 5G-TRANSFORMER Report on trials resultsThis deliverable presents a report on the implementation of the overall architecture and a software release of the complete platform. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D4.3 – Final design and implementation report on service orchestration, federation and monitoring platform (report)This deliverable will describe the final design of all algorithms developed in WP4. This includes refinements of the design outlined in D4.1, containing final validation results and the implementation of the service monitoring platform. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D1.4 – 5G-TRANSFORMER final system design and Techno-Economic AnalysisThis deliverable describes the final system design considering the results provided by experimentation. It also includes the techno-economic analysis. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D5.2 – Integration and proofs of concept planThis deliverable will provide the refined implementation, integration and demonstration plans. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D6.6 – Demonstrations at Mobile World Congress’19 and EUCNC’19 or equivalentTechnology demonstration in a high impact venue, such as MWC’19 (preferable) and/or similar venue. As evaluation metric we will use number of people stopping by the booth and the increase of number of web page visits during the exposition time. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Demonstrators, pilots, prototypes | 2020-02-27 |
D2.3 – Final design and implementation report on the MTP (report)D2.3 will report the final MTP design. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D6.7 – Communication, Dissemination, and Exploitation achievements through the project, exploitation plan after the end of the project and assessment of the contribution of 5G-TRANSFORMER in support of the 5G standardThis final deliverable will report the achievements of WP6 during the project lifetime and will present an update of the Communication, Dissemination, and Exploitation Plan (CoDEP), which will focus on the actions after the finalization of the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D6.5 – Report on WP6 progress and update of CoDEPReport on the progress of this WP and an update of CoDEP Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-27 |
D7.3 – First periodic report of the projectThis report constitutes the non-financial part of the Periodic Report to be delivered two months after the end of the period (M14). Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D4.1 – Definition of service orchestration and federation algorithms, service monitoring algorithmsThis deliverable will describe the initial versions of all algorithms for service orchestration, federation, and monitoring to be developed in WP4. This deliverable will also include the specification, design and implementation of the service monitoring platform. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D3.1 – Definition of vertical service descriptors and SO NBIThis deliverable reports the description of service descriptors, the use of blueprints to describe vertical services, and the API of the SO, focusing on T3.1 and T3.2. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D6.2 – Communication, Dissemination, and Exploitation achievements of Y1 and plan for Y2This deliverable will report the achievements of WP6 during the first year and will present an update of the Communication, Dissemination, and Exploitation Plan (CoDEP) after the initial phase of the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D6.3 – Demonstrations at EUCNC’18 or equivalentTechnology demonstration in a high impact venue, such as EuCNC’18 or similar venue. As evaluation metric we will use number of people stopping by the booth and the increase of number of web page visits during the exposition time. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Demonstrators, pilots, prototypes | 2020-02-17 |
D1.2 – 5G-TRANSFORMER initial system designThis deliverable describes the initial system architecture design. Furthermore, it reports the set of defined use cases and their technical requirements on the system design. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D2.1 – Definition of the Mobile Transport and Computing PlatformThis deliverable will provide the first version of the MTP design and the internal procedures/workflows for its operation and APIs towards the SO. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D5.1 – Definition of vertical testbeds and initial integration plansThis deliverable will provide a description of the vertical test-beds, as well as initial implementation and integration plans to be done during the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D1.1 – Report on vertical requirements and use casesReport on the set of identified use cases and the initial requirements coming from vertical industries. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D6.1 – Initial Communication, Dissemination, and Exploitation Plan (CoDEP) draft including Standardization roadmapReport on the initial CoDEP Plan and the roadmap for the coordinated standardization activities. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |
D7.1 – Project handbookSet-up of management procedures and documentation handbook. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2020-02-17 |