Opendata, web and dolomites

5G-TRANSFORMER project deliverables

The page lists 24 deliverables related to the research project "5G-TRANSFORMER".

 List of Deliverables

5G-TRANSFORMER: list of downloadable deliverables.
title and desprition type last update

D7.5 – Final Project Report

This report constitutes the non-financial part of the Final Report to be delivered after the end of the project.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D5.3 – Experimentation results and evaluation of achievements in terms of KPIs

This deliverable presents evaluation results of the experimentation and demonstration.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D1.3 – 5G-TRANSFORMER refined architecture

This deliverable is an update of D1.2 and it describes the refined system design considering the feedback from the results of other technical WPs.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D6.4 – Technical and Exploitation Workshops held during second year

The project commits to organise at least a workshop on the technical contents of the project during the second year and an internal Exploitation workshop intended to maximise and find new ways of exploiting the results produced by the project. This deliverable corresponds to both workshops. As metrics for validation, we will check the attendance and will produce a satisfaction poll on the audience. The workshop will be satisfactory if the poll results in higher than 70% of positive votes.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Other 2020-02-27

D3.3 – Final design and implementation report on the Vertical Slicer (report)

This deliverable reports on the algorithms of the VS and the extensions of MEC services, application specific monitoring, and extensions of the virtualization platform, focusing on T3.2 and T3.3.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D5.4 – 5G-TRANSFORMER Report on trials results

This deliverable presents a report on the implementation of the overall architecture and a software release of the complete platform.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D4.3 – Final design and implementation report on service orchestration, federation and monitoring platform (report)

This deliverable will describe the final design of all algorithms developed in WP4. This includes refinements of the design outlined in D4.1, containing final validation results and the implementation of the service monitoring platform.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D1.4 – 5G-TRANSFORMER final system design and Techno-Economic Analysis

This deliverable describes the final system design considering the results provided by experimentation. It also includes the techno-economic analysis.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D5.2 – Integration and proofs of concept plan

This deliverable will provide the refined implementation, integration and demonstration plans.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D6.6 – Demonstrations at Mobile World Congress’19 and EUCNC’19 or equivalent

Technology demonstration in a high impact venue, such as MWC’19 (preferable) and/or similar venue. As evaluation metric we will use number of people stopping by the booth and the increase of number of web page visits during the exposition time.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Demonstrators, pilots, prototypes 2020-02-27

D2.3 – Final design and implementation report on the MTP (report)

D2.3 will report the final MTP design.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D6.7 – Communication, Dissemination, and Exploitation achievements through the project, exploitation plan after the end of the project and assessment of the contribution of 5G-TRANSFORMER in support of the 5G standard

This final deliverable will report the achievements of WP6 during the project lifetime and will present an update of the Communication, Dissemination, and Exploitation Plan (CoDEP), which will focus on the actions after the finalization of the project.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D6.5 – Report on WP6 progress and update of CoDEP

Report on the progress of this WP and an update of CoDEP

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-27

D7.3 – First periodic report of the project

This report constitutes the non-financial part of the Periodic Report to be delivered two months after the end of the period (M14).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D4.1 – Definition of service orchestration and federation algorithms, service monitoring algorithms

This deliverable will describe the initial versions of all algorithms for service orchestration, federation, and monitoring to be developed in WP4. This deliverable will also include the specification, design and implementation of the service monitoring platform.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D3.1 – Definition of vertical service descriptors and SO NBI

This deliverable reports the description of service descriptors, the use of blueprints to describe vertical services, and the API of the SO, focusing on T3.1 and T3.2.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D6.2 – Communication, Dissemination, and Exploitation achievements of Y1 and plan for Y2

This deliverable will report the achievements of WP6 during the first year and will present an update of the Communication, Dissemination, and Exploitation Plan (CoDEP) after the initial phase of the project.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D6.3 – Demonstrations at EUCNC’18 or equivalent

Technology demonstration in a high impact venue, such as EuCNC’18 or similar venue. As evaluation metric we will use number of people stopping by the booth and the increase of number of web page visits during the exposition time.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Demonstrators, pilots, prototypes 2020-02-17

D1.2 – 5G-TRANSFORMER initial system design

This deliverable describes the initial system architecture design. Furthermore, it reports the set of defined use cases and their technical requirements on the system design.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D2.1 – Definition of the Mobile Transport and Computing Platform

This deliverable will provide the first version of the MTP design and the internal procedures/workflows for its operation and APIs towards the SO.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D5.1 – Definition of vertical testbeds and initial integration plans

This deliverable will provide a description of the vertical test-beds, as well as initial implementation and integration plans to be done during the project.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D1.1 – Report on vertical requirements and use cases

Report on the set of identified use cases and the initial requirements coming from vertical industries.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D6.1 – Initial Communication, Dissemination, and Exploitation Plan (CoDEP) draft including Standardization roadmap

Report on the initial CoDEP Plan and the roadmap for the coordinated standardization activities.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17

D7.1 – Project handbook

Set-up of management procedures and documentation handbook.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017

download deliverable 

Documents, reports 2020-02-17