Opendata, web and dolomites

DOMINOES project deliverables

The page lists 16 deliverables related to the research project "DOMINOES".

 List of Deliverables

DOMINOES: list of downloadable deliverables.
title and desprition type last update

Overview of the validation framework

Report covering the setup of the three validation sites, their tools, components, resources and systems including the integration with the local market architecture. The framework preparation will go through an internal review and acceptance process to guarantee feasibility. The deliverable is part of task T4.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Design and implementation of a data security framework

This deliverable reports the architecture and design of the data security framework created in the DOMINOES project. It shows the development technologies used in the design and the simulation conducted in different dynamic environments. The deliverable is part of task 2.5. The data security framework will be reviewed and accepted by the project partners.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Scalable local energy market architecture (second release)

The report will introduce the second release of a transparent local market design and a final implementation to be used in WP3 and WP4. The architecture is verified/considered ready if all the project partners approve the feasibility of the architecture and the dependencies to other WPs have been analysed. The deliverable is part of task 2.2.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Information exchange processes and solutions to integrate local and centralized energy markets

The deliverable provides a description of the sources and types of information that will be shared in local markets. An overview of system components that can establish a connection from energy communities to centralized markets. The deliverable is part of task 2.3.

To verify the deliverable results/quality, the partners will complete a stakeholder survey and analysis of the information needs (including type of data and time resolution) in the local and centralized markets. The report will be made available on the project website.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Tools for local energy market and end-user interaction

This deliverable will specify tools that will enable end-user engagement with the local market processes. The tools include functionalities for consumers/prosumers and interfaces towards the local market architecture. The deliverable is part of task 2.4.

The tool specifications will include at least web and mobile interfaces for end-users and back office tools for local energy market and end-user interaction.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Use cases and application scenarios requirements

This deliverable will describe the complete set of use cases and application scenarios requirements conveying all value chain perspectives. The use cases will take into account stakeholders like DSO, TSO, Energy Provider, Aggregator and Local Community. This deliverable is part of task 1.2.

As a verification of quality, the deliverable will include at least two full described use cases with direct application for each of the validation frameworks. They should follow a common structure for future validation in WP4. Those use cases should include full description of both functional and non-functional requirements.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Standardization proposals Year 1

The deliverable lists all standardization activities of all project partners for the first year. The deliverable\'s focus is on the status of new standards. The report will be part of task 6.2.

The quality of the deliverable will be judged e.g. by number of standardization proposals made, impact of the standardization proposal, and number of standardization organization meetings attended by partners.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Implementation plan for the validation environment

The implementation plan will summarize descriptions of the validation environments, requirements for their implementation and equipment & systems specifications, following the works of tasks 1.1 and 1.2 (D1.1, D1.2 and D1.3). Furthermore, main KPIs for validation of key project results will be defined. Preliminary KPIs were set out in the Grant Agreement, which will be revised in this deliverable to ensure they correspond with the defined use cases. This deliverable is part of task 1.3.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Scalable local energy market architecture (first release)

This report will introduce the first release of a transparent local market design including first implementation version and instructions for market structures, transactions, interfaces and responsibilities. The architecture is verified/considered ready if all the project partners approve the feasibility of the architecture. The deliverable is part of task 2.2.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Enabling technology for transparent local p2p energy markets

This deliverable provides a review covering the technologies required to set up a local market architecture. The report will focus on analysing technology related to local trading, information exchange towards markets and transactive control of resources. This deliverable is part of task 2.1.

The review should include a detail analysis of the state of the art of technologies needed at the different levels, from Hardware to Software, by p2p markets according to the defined use cases, applications, functional and non-functional requirements. With that in mind, implemented technologies in DOMINOES should be fully defined in order to meet the established objectives.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Dissemination Activity Report Year 1

The report, as part of task 6.1, lists all dissemination activities of all project partners from the first year.

The quality of the achieved dissemination level will be analysed based on the number of partners with reported participation in dissemination activities; No. of dissemination activities addressed by the partners, including: creation of the project logo development of the project web-site, general promotion of the project, social media approach, plan for traditional media promotion and communication of regular news and announcements, plan for campaign on dissemination of the project’s achievements in simplified language directed mostly towards the general public, plan for results publication in scientific journals, special book chapters and participation to workshops and international conferences, plan for organization of scientific events, conferences, workshops and summer school.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Formulation of alternative local market place enabled business models

The review will deliver a definition of alternative DSO business models, including a specification of the frameworks formulating relationship environment between the local market and its stakeholders, and related strategic use of contracts.

The report will deliver number of alternative business models for local markets. Topics addressed by the defined business models include: a) definition of processes and stakeholders in transactive energy exchanges; b) definition of the necessary transactions and the corresponding and required information models; c) definition of contracts; d) strategic use of contracts for third party resources. The deliverable is part of task 5.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Local market reference architecture and business requirements

This deliverable will present the requirements of DSOs, prosumers/consumers, aggregators, BRPs and retailers for the local markets. Based on the business requirements a reference architecture will be delivered that will serve as a baseline for WP2. As means of verification, the architecture is available to other tasks and the requirements have been accepted by the partners. The deliverable is part of task 1.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

ICT platform and connected energy network reference architecture design

This deliverable, as part of task 1.1, will describe the reference architecture design from the ICT connected energy network technology perspective. The report will define how the main network components will be organised and will communicate meeting interoperability, reliability and data protection requirements. The deliverable will be completed after iterations with local market reference architecture and business requirements and validation environment definition.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Project guidelines

The deliverable includes a description of the guidelines related to the project internal processes. Items included in the deliverable will include at least a) submission and review of deliverables; b) quality management procedures; c) risk management; d) meeting principles. The guidelines will be verified with the acceptance from all project partners. Guidelines preparation is part of the project coordination task 7.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-04-16

Project website online

Public website, which will include a list of DOMINOES publications, events, news, etc. The deliverable is verified ready once the website is open for public access. The deliverable is part of task 6.1.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-04-16