The page lists 8 deliverables related to the research project "PANTHEON".

 List of Deliverables

PANTHEON: list of downloadable deliverables.
title and desprition type last update

Real-world (1:1 scale) hazelnut orchard for final demo

This deliverable will collect the outcomes of task 2.2 and will comprise a detailed description of the dimensioning of the hazelnut orchard and related farming operations to be considered for the final demo.

Programme: H2020-EU.2.1.1. - Topic(s): SFS-05-2017

download deliverable 

Documents, reports 2019-11-13

Requirements, Specifications and Benchmark

This document will collect the outcomes of task 2.1 and will contain:
• Analysis of the requirements for the management of an orchard.
• Analysis of the functional specifications definition.
• Identification of appropriate means to verify the set of benchmarks.

Programme: H2020-EU.2.1.1. - Topic(s): SFS-05-2017

download deliverable 

Documents, reports 2019-11-13

Public website

A public website will be developed which describes PANtHEOn, and will be periodically updated with the progress and outputs from PANtHEOn.

Programme: H2020-EU.2.1.1. - Topic(s): SFS-05-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-11-13

Guidelines for Components and Documentation compatibility

This deliverable will be composed of a Wiki page containing the guidelines to ensure the compatibility of software/hardware components and the coherence of all the PANtHEOn documentation. The page will also contain an updated description of the overall architecture of the system and of its components.

Programme: H2020-EU.2.1.1. - Topic(s): SFS-05-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-11-13

Water Management Control

The control mechanism developed for the control of the irrigation level is completed and works properly.

Programme: H2020-EU.2.1.1. - Topic(s): SFS-05-2017

download deliverable 

Other 2019-11-13

Data Management Plan – Open Data Pilot

Data Management Plan

Programme: H2020-EU.2.1.1. - Topic(s): SFS-05-2017

download deliverable 

Open Research Data Pilot 2019-11-13

Project Management Guidelines

Guidelines to instruct all partners on the procedures to be followed for fully complying with the EC procedures on scientific, technical and financial reporting

Programme: H2020-EU.2.1.1. - Topic(s): SFS-05-2017

download deliverable 

Documents, reports 2019-11-13

Multispectral LiDAR Point Clouds

The processing pipeline is implemented and delivers homogenized multispectral point clouds as input to Task 4.3 and 4.8.

Programme: H2020-EU.2.1.1. - Topic(s): SFS-05-2017

download deliverable 

Other 2019-11-13