EU-SysFlex: list of downloadable deliverables.
title and desprition type last update

\"D8.2 Feedback report (#1)\"

Feedbacks of the EDF Concept Grid demonstrator: technical feasibility of multi-services provision and optimal coordination of multi-resources. Only public information (Task 8.2)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.12 Project newsletter (#3)\"

Six monthly newsletter presenting the las novelties of the project and related information. Task 11.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.23 Policy workshops in Brussels (#3)\"

Public report presenting the workshops conclusions Task 11.5

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D6.5 Optimization tools and first applications in simulated environments

Report about the range of flexibilities determined and utilize in each demonstrator.(Task 6.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.11 Project newsletter (#2)\"

Six monthly newsletter presenting the las novelties of the project and related information. Task 11.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D8.1 Detailed specification for field testing

Functional specifications and alignment to overall use cases requirements / architecture (Task 8.1)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.32 Project Management Plan (#2)\"

This deliverable includes a schedule per task, responsible partner related subtasks, related deliverables and dependencies on other tasks. It involves an update of the Gantt chart. The due date is foreseen in M16 because the firt reporting period will be close.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D4.4 Operation and integration considerations for distinct Qualifier trial providing units of system services. Considerations for large scale deployment of same including operator application requirements and scheduling software (#1)\"

Considerations for large scale deployment of same including operator application requirements and scheduling software (Task 4.4)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.18 Project flier and brochure (#1)\"

A simple flyer and a brochure for multiple stakeholders, based on infographics and images and inviting recipients to visit the website for more detailed information.Task 11.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.3 Communication and dissemination plan (#2)\"

The D&C plan based on an impact-enabling approach will be focussed on the replication involving multiple stakeholders. Task 11.1

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D2.3 Report on updated models consistent with scenarios described in D2.2

Description of global structure and operating principles of the continental European model and NI-IRE System model (Task 2.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D2.2 Report on scenarios for the simulation of system flexibility assessment

Description of HiRes and LoRes scenarios with electrification of heat and transport, with at least 50% RES-E (Task 2.2)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D11.1 Project website and social media channels

The repository of any communications and public contents but also a major distribution channel designed for multiple audiences. Task 11.3

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D6.6 Demonstrators for flexibility provision from decentralised resources, common view

Deployment plan which includes technical specifications, procurement procedures for technical equipment, timeline for installations and monitoring procedures) (Task 6.4)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.19 Project flier and brochure (#2)\"

A simple flyer and a brochure for multiple stakeholders, based on infographics and images and inviting recipients to visit the website for more detailed information.Task 11.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.2 Communication and dissemination plan (#1)\"

The D&C plan based on an impact-enabling approach will be focussed on the replication involving multiple stakeholders. Task 11.1

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D2.1 State-of-the-art by the most recent results obtained in various research and development projects across and beyond Europe on the integration of RES in a power system

State-of-the-art by the most recent results obtained in various research and development projects across and beyond Europe on the integration of RES in a power system (Task 2.1)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.5 Communication and dissemination plan (#4)\"

The D&C plan based on an impact-enabling approach will be focussed on the replication involving multiple stakeholders. Task 11.1

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.31 Project Management Plan (#1)\"

This deliverable includes a schedule per task, responsible partner related subtasks, related deliverables and dependencies on other tasks. It involves completing the initial Gantt chart.

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.4 Communication and dissemination plan (#3)\"

The D&C plan based on an impact-enabling approach will be focussed on the replication involving multiple stakeholders. Task 11.1

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.26 Policy workshops in national capitals (#1)\"

Public report presenting the workshops conclusions Task 11.5

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.21 Policy workshops in Brussels (#1)\"

Public report presenting the workshops conclusions Task 11.5

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D6.4 General description of the used data as a basis for a general data principle

Report including the communication interfaces between the actors involved in the 3 demonstrators (Task 6.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D3.1 Product definition for innovative system services

Classification, detailed description and analysis of selected products for needed system services. (Task 3.1)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D1.1 Consortium operating procedures

Project management plan summarizing all the required knowledge for the good management of the project (in terms of administrative forms, financial aspects, quality process, etc.) (Task 1.1)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.10 Project newsletter (#1)\"

Six monthly newsletter presenting the las novelties of the project and related information. Task 11.2

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D6.1 Demonstrators’ system use cases description

The developed business use cases from WP3 translated into system use cases Task 6.2)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

\"D11.22 Policy workshops in Brussels (#2)\"

Public report presenting the workshops conclusions Task 11.5

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D6.3 Grid Simulations and simulations tools. Preliminary results

Report including the first results regarding the models and simulations of the networks from the different demonstrations (Task 6.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017

download deliverable 

Documents, reports 2020-04-24

D3.3 Business use cases for innovative system services

A repository of applicable BUCs, both in UML format and generated word documents, for the demonstrations (Task 3.3)