The page lists 7 deliverables related to the research project "COMPILE".

 List of Deliverables

COMPILE: list of downloadable deliverables.
title and desprition type last update

Dissemination and Communication plan

The report will provide guidance to all dissemination and outreach activities that will be carried out. In addtion it will include a COMPILE media package which will contain a set of graphical/visual elements: logo and wordmark, web-design, icons, colours, fonts, style of images, presentation styles, etc whcih will be used to build up theCOMPILE Project Brand Identity.

The deliverable is related to the work done in task: T8.1.

Programme: H2020-EU.3.3.4. - Topic(s): LC-SC3-ES-3-2018-2020

download deliverable 

Documents, reports 2020-04-02

System architecture

The deliverable will contain results of T2.3: architecture of COMPILE ICT system with description of components, their main functionalities, and interfaces. The architecture definition will be based on the European SGAM model (Smart Grid Architecture Model) defined by CEN-CENELEC-ETS. The report will contain the system and functional requirements for the EV charging architecture for all the COMPILE demo pilot sites.

Programme: H2020-EU.3.3.4. - Topic(s): LC-SC3-ES-3-2018-2020

download deliverable 

Documents, reports 2020-04-02

Newsletters and Brochures 1

A newsletter will be made with the project news/work that was carried out in the first 6 months of the project. The newsletter will use the element from COMPILE media package.

The deliverable is related to the work done in task: T8.1.

Programme: H2020-EU.3.3.4. - Topic(s): LC-SC3-ES-3-2018-2020

download deliverable 

Websites, patent fillings, videos etc. 2020-04-02

Report on interoperability guidelines

The deliverable will provide the guidelines on interoperability, specifying the interfaces and routines of the COMPILE tools needed to cooperate, as defined in T2.4: Interoperability via common interfaces. The report provide the technical characteristics of different appliances and processes controlled by COMPILE products and assesment of their technical capability for involvement into controlled operation of the microgrid.

Programme: H2020-EU.3.3.4. - Topic(s): LC-SC3-ES-3-2018-2020

download deliverable 

Documents, reports 2020-04-02

Demonstration site movies 1

Demonstration site movie for one of the COMPILE pilot sites will be made, to spread out the word of COMPILE. The movie will include the elements from COMPILE media package.

The deliverable is related to the work done in task: T8.1.

Programme: H2020-EU.3.3.4. - Topic(s): LC-SC3-ES-3-2018-2020

download deliverable 

Websites, patent fillings, videos etc. 2020-04-02

LES: Operational requirements, use cases and KPIs

The deliverable will contain results of T2.1 and T2.4: definition of energy island and identification of its specific characteristics; identification of use cases and applicable measures for optimisation of energy island’s operation; determination of KPIs for assessment of implementation of COMPILE system in LES.

Programme: H2020-EU.3.3.4. - Topic(s): LC-SC3-ES-3-2018-2020

download deliverable 

Documents, reports 2020-04-02

Newsletters and Brochures 2

A newsletter will be made with the project news/work that was carried out from M6 to M12 of the project. The newsletter will use the element from COMPILE media package. In addition, the 1st COMPILE brochure, presenting the project, will be made.

The deliverable is related to the work done in task: T8.1.

Programme: H2020-EU.3.3.4. - Topic(s): LC-SC3-ES-3-2018-2020

download deliverable 

Websites, patent fillings, videos etc. 2020-04-02