DEMOWFLOAT

Demonstration of the WindFloat Technology

 Coordinatore EDP INOVACAO SA 

 Organization address address: PRACA MARQUES DE POMBAL 12
city: LISBOA
postcode: 1250 162

contact info
Titolo: Mr.
Nome: Tiago
Cognome: Romano Gonçalves
Telefono: 351210000000
Fax: 351210000000

 Nazionalità Coordinatore Portugal [PT]
 Totale costo 5˙982˙249 €
 EC contributo 3˙563˙870 €
 Programma FP7-ENERGY
Specific Programme "Cooperation": Energy
 Code Call FP7-ENERGY-2011-2
 Funding Scheme CP
 Anno di inizio 2011
 Periodo (anno-mese-giorno) 2011-07-15   -   2014-07-14

 Partecipanti

# participant  country  role  EC contrib. [€] 
1    EDP INOVACAO SA

 Organization address address: PRACA MARQUES DE POMBAL 12
city: LISBOA
postcode: 1250 162

contact info
Titolo: Mr.
Nome: Tiago
Cognome: Romano Gonçalves
Telefono: 351210000000
Fax: 351210000000

PT (LISBOA) coordinator 0.00
2    A. Silva Matos - Energia, SA

 Organization address city: Sever do Vouga

contact info
Titolo: Mr.
Nome: Pedro
Cognome: Pinheiro
Telefono: +351 234 590 301

PT (Sever do Vouga) participant 0.00
3    ALLIANCE FOR SUSTAINABLE ENERGY LLC

 Organization address address: COLE BLVD 1617
city: GOLDEN
postcode: 80401

contact info
Titolo: Mr.
Nome: Walter
Cognome: Musial
Telefono: +1 303 384 6956

US (GOLDEN) participant 0.00
4    CAIXA BANCO DE INVESTIMENTO SA

 Organization address address: Rua Barata Salgueiro
city: Lisboa

contact info
Titolo: Dr.
Nome: Paulo
Cognome: De Sousa
Telefono: 351214000000
Fax: 351213000000

PT (Lisboa) participant 0.00
5    INSTITUTO DE SOLDADURA E QUALIDADE

 Organization address address: AVENIDA DO PROFESSOR DOUTOR CAVACO SILVA 33 PARQUE DAS TECNOLOGIAS
city: OEIRAS
postcode: 2740 120

contact info
Titolo: Mr.
Nome: João Paulo
Cognome: De Figueiredo Duarte
Telefono: 351214000000
Fax: 351214000000

PT (OEIRAS) participant 0.00
6    Laboratorio Nacional de Energia e Geologia I.P.

 Organization address address: Rua da Amieira
city: S.Mamede de infesta
postcode: 4466-901

contact info
Titolo: Prof.
Nome: Ana
Cognome: Estanqueiro
Telefono: 351936000000

PT (S.Mamede de infesta) participant 0.00
7    PRINCIPLE POWER (EUROPE) LIMITED

 Organization address address: PARK VIEW
city: LONDON

contact info
Titolo: Mr.
Nome: Peter
Cognome: Delf
Telefono: +44 20 8882 9332
Fax: +4420 8882 9411

UK (LONDON) participant 0.00
8    REPSOL NUEVAS ENERGIAS UK Ltd

 Organization address address: 5TH FLOOR, PRINCES STREET
city: EDINBURGH

contact info
Titolo: Mr.
Nome: Allan
Cognome: Macaskill
Telefono: +44 7712 864013

UK (EDINBURGH) participant 0.00
9    SCHEEPSWERF DAMEN GORINCHEM BV

 Organization address address: AVELINGEN WEST 20 INDUSTRIETERREIN
city: Gorinchem
postcode: 4202 MS

contact info
Titolo: Mr.
Nome: Peter
Cognome: Robert
Telefono: +31 183 655177

NL (Gorinchem) participant 0.00
10    SGURRENERGY LTD

 Organization address address: Bath Street
city: Glasgow

contact info
Titolo: Mr.
Nome: Charlie
Cognome: Briggs
Telefono: +44 141 227 1700

UK (Glasgow) participant 0.00
11    VESTAS WIND SYSTEMS A/S

 Organization address address: HEDEAGER 44
city: AARHUS
postcode: 8200

contact info
Titolo: Mr.
Nome: Karsten Helbo
Cognome: Karsten Helbo Larsen
Telefono: +45 97303493

DK (AARHUS) participant 0.00
12    WAVEC/OFFSHORE RENEWABLES - CENTRO DE ENERGIA OFFSHORE ASSOCIACAO

 Organization address address: RUA DOM JERONIMO OSORIO 11
city: LISBOA
postcode: 1400 119

contact info
Titolo: Ms.
Nome: Carla
Cognome: Bacelar
Telefono: +351 21 8482655

PT (LISBOA) participant 0.00

Mappa


 Word cloud

Esplora la "nuvola delle parole (Word Cloud) per avere un'idea di massima del progetto.

million    demonstration    offshore    financial    significant    installation    windfloat    megawatt    first    install    monitoring    portuguese    performance    windplus    pilot    jv    floating    euros    pre    wind   

 Obiettivo del progetto (Objective)

Consistent with industrial initiative of the SET Plan this project addresses the objective of a grid-connected multi-megawatt fully integrated offshore wind turbine hosted on a floating support structure. The Proposed Project is in the unique position to leverage significant pre-existing financial and intellectual capital invested by the project coordinator, WindPlus in a PILOT unit installation of the WindFloat with a 2MW Vestasturbine. WindPlus joint vesnture partners and Consortium members of the Project, realize that the design, fabrication and installation of a WindFloat unit is only the first step towards a full demonstration of a floating offshore wind system. It also represents the highest cost, in economic terms, however the WindPlus, as the proposed Project coordinator is proposing to use the installed PILOT unit to demonstrate benefits of floating offshore system and its cost competiveness.

The PILOT project, funded by the JV partners and the Portuguese Member State, will design, fabricate and install the WindFloat system. The Portuguese member state has contributed 7 million Euros to the pre-existing project out of a total investment of 20million Euros. Due to financial constraints, the operational/ demonstration phase of the project is currently limited to a minimum set of tests.

The Proposed Project (“Project”) addresses the next step, which is to demonstrate the long-term performance capabilities of the system. It is imperative that the system passes the scrutiny of the financial sector, as without project financing it is impossible to install multi-megawatt floating offshore wind parks. A period of extensive testing and monitoring is needed to demonstrate the system’s performance.

As with any new technological development, this system requires a significant degree of testing, monitoring, data gathering and analysis as part of a detailed demonstration process. WindPlus JV partners and the Portuguese governmenttook the first step – they have funde

Altri progetti dello stesso programma (FP7-ENERGY)

CORES (2008)

Components for Ocean Renewable Energy Systems

Read More  

BESTF2 (2013)

Bioenergy Sustaining the Future 2

Read More  

SIRBATT (2013)

Stable Interfaces for Rechargeable Batteries

Read More