Opendata, web and dolomites

RETRAINER project deliverables

The page lists 17 deliverables related to the research project "RETRAINER".

 List of Deliverables

RETRAINER: list of downloadable deliverables.
title and desprition type last update

Report on the multicenter clinical trial

Multicenter clinical trial results

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12

Preliminary results of acceptance of systems refinements

Preliminary results from refinements tests.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12

Ethical issues deep investigation

Document about dignity, freedom and privacy issues, as raised by the research, and which explains how the researchers will deal with these issues. The document will be updated at M15 and M37 if needed, to take into account the needs of the different validation phases.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12

Integration of S1 completed

S1 full integrated system is ready

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Project website

Project website including public and private areas.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-02-12

First complete prototype available

Availability of S1 first complete prototype

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Recruitment criteria

Details on the procedures and criteria that will be used to identify/recruit research participants. The document will be updated at M15 and M37 if needed, to take into account the needs of the different validation phases.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12

Indication for multicenter clinical trial

Multicenter clinical trial design

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12

Integration of S2 completed

Full S2 integrated system is ready

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Definition of methodology and metrics for multicenter clinical trial

Methodology and metrics for multicenter clinical trial

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12

Full set of S2 tested prototypes available for delivery to clinical partners

Tested S2 prototypes are ready for delivery to clinical partners

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Incidental findings policy

Description of RETRAINER incidental findings policy.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12

Full set of S1 tested prototypes available for delivery to clinical partners

Full set of S1 tested prototypes are ready for delivery to clinical partners

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Realtime embedded control available

Availability of the embedded real time control of S1 prototype.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

First complete prototype available Leader TUW

Availability of S1 complete prototype

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-02-12

Informed consent procedures full description

Informed consent procedures description including sample informed consent documentation. The document will be updated at M15 and M37 if needed, to take into account the needs of the different validation phases.

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12

Definition of methodology and metrics for pilot test

Methodology and metrics for pilot test

Programme: H2020-EU.2.1.1.5. - Topic(s): ICT-23-2014

download deliverable 

Documents, reports 2020-02-12