The page lists 17 deliverables related to the research project "STORY".

 List of Deliverables

STORY: list of downloadable deliverables.
title and desprition type last update

Case study report chapter on building integrated storage

Study of 5 buildings equipped with different energy storage equipments.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-04-22

Report on Large Scale Impact Simulations

With the cases and scenarios defined, the simulations can be prepared, simulated and the results evaluated. The focus is on understanding the following issues (both economic and technical) for each of the market-driven, regulated and mixed methods of implementing storage:
• Impact of large scale implementation of distributed energy storage on the grid operation challenges, required grid investments and maximization of RES integration.
• Possible mitigation measures for the detrimental impacts (e.g. investment needs and potential investors).

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Other 2020-04-22

Newsletter 6

Advances of the project to be disseminated to the other LCE 6-10 projects.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-22

Newsletter 5

Advances of the project to be disseminated to the other LCE 6-10 projects.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-22

Periodic report 2

Periodic report 2: Draft report to the Commission covering period 2 i.e. months 13-24 of the project (M24). Final report to be delivered, to the EC, within 60 days after the end of the reporting period.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Documents, reports 2020-04-22

Newsletter 4

Advances of the project to be disseminated to the other LCE 6-10 projects.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-22

Report on interoperability guidelines

Guidelines addressing in-depth interoperability, substantially improving on the state-of-the-art. These guidelines contain solutions on how to design and build interoperable components and subsystems that can be integrated with little effort and time. The guidelines allow the integration of components and subsystems into an overall system while insuring good performances.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Documents, reports 2020-04-22

Requirements definition of the hardware to be deployed

Market screening to find the hardware components that best match the project defined criteria. A best fit and best price/quality fit is selected for the building, neighborhood, and district communication in the demonstration sites.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Documents, reports 2020-04-22

Newsletter 3

Advances of the project to be disseminated to the other LCE 6-10 projects.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-22

Brochure 2

Brochures and flyers related to the project progress to be distributed to the stakeholders.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-22

Periodic Report 1

Periodic report 1: Draft Report to the Commission covering period 1 i.e. months 1-12 of the project (M12). Final report to be delivered, to the EC, within 60 days after the end of the reporting period.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Documents, reports 2020-04-22

Newsletter 2

Advances of the project to be disseminated to the other LCE 6-10 projects.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-22

Newsletter 1

Advances of the project to be disseminated to the other LCE 6-10 projects.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Websites, patent fillings, videos etc. 2020-04-22

Demonstrated embedment in 3 different controllable devices able to support flexibility of the energy demand

Different approaches for adding multiple services on a single ICT structure are compared using the inputs form the analyses on interoperability and gateway requirements.
One selected approach is used to demonstrate the feasibility in 3 pieces of controllable devices able to support flexibility of the energy demand.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Demonstrators, pilots, prototypes 2020-04-22

Structured overview of communication standards for smart grids

Overview of the current and emerging standards for smart grids.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Documents, reports 2020-04-22

Overview of requirement for embedding measurements for services on ICT

Overview of the typical requirements that measurement and data logging equipment poses on the ICT infrastructure.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 

Documents, reports 2020-04-22

Brochure 1

Brochures and flyers related to the project progress to be distributed to the stakeholders.

Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014

download deliverable 