Opendata, web and dolomites

LICORNE project deliverables

The page lists 10 deliverables related to the research project "LICORNE".

 List of Deliverables

LICORNE: list of downloadable deliverables.
title and desprition type last update

Communication architecture

D5.1 Communications architecture between the different systems (Month 20)

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2019-09-13

Setting-up specifications for the control cell

Setting-up specifications for the control cell

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2019-09-13

Benchmarking report

D4.1 Report describing the results of the benchmarking performed (Month 19)

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2019-09-13

Technical & Scientific Publications

D6.4 Publications in technical reviews and websites about the LICORNE
Robotic Vacuum Forming (Month 22)
Detection by Machine Vision (Month 24)
Big Data Algorithm (Month 24)

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2019-09-13

Fair, event presentation

D6.2 Fair, event presentation (Month 30) – to be adjusted with the progresses of the project

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2019-09-13

LICORNE Website

D6.3 Website of the LICORNE project (Month 16)

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-09-13

Operative workstation

D4.6 Two workstations with a robot and the machine vision (Month 26)

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-13

Big Data Algorithms

D5.3 Hardware infrastructure and evaluation of the algorithm to predict how is going to behave the process, the quality and the maintenance (Month 24)

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2019-09-13

Communication Protocols

D5.2 Industrial communication Protocol identified and consolidated (Month 21)

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2019-09-13

Setting-up plans for vacuum forming

D1.2 Setting-up plans compatible of the plant organization (Month 3)

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2019-09-13