Opendata, web and dolomites

RobMoSys project deliverables

The page lists 28 deliverables related to the research project "RobMoSys".

 List of Deliverables

RobMoSys: list of downloadable deliverables.
title and desprition type last update

Dissemination Plan and Report – m30

Dissemination plan and report of the project updated within the first month of each year on annual basis. The deliverable reports on activities carried out in tasks T6.1, T6.2, T6.3, T6.4, T6.5 and T6.6. All the consortium members participate to this deliverable.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Business Models for the EcoSystem – m30

Documents reporting on the market analysis pursued in tight collaboration of Tier-1 experts coming from the business world, and taking into account the return of experience of I4MS projects (BEinCPPS, HORSE) and related initiatives as ROBOTT-NET. The market analysis aims at identifying business models for the ecosystem. A special focus will be paid on open-source models. Main contributors to this deliverables are CEA, EFE, EUR and TUM.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Modelling Foundation Guidelines and Meta-Meta-Model Structure - m30

Specification of meta-model structure and static modelling.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Eclipse Project and Eclipse Project Proposal – m30

Deliverable reporting on activities related to the creation of an Eclipse project to host the RobMoSys open-source platform. This deliverable is in link with task Task 6.4. The deliverable will present the proposal for the open-source project in the first year and will be updated on annual basis.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Progress Report on Open Call I Experiments

Document reporting on the progress of the experiments selected in the context of call I.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Reports of Experts Workshops

Documents reporting on Tier-1 Experts workshops related activities: content of the workshops and outcomes. This deliverable is updated on annual basis and it is related to Task T6.5.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Improved (meta-)models, prototypical DSLs, tools and implementations

Improved (meta-)models, prototypical DSLs, tools and implementations as needed as in- put for the other WPs and for preparing the second wave of open calls (including intermediate pick-up of results from open call projects in M18, and at their end in M24)

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Open Call II preparation documents

Call preparation documents: Guide for applicants, Model Contract, Proposal Template, Draft of Call Text, Publication plan and Document describing how the recommandations of Tier-1 members are integrated in the scope of the call II. The document will be updated at M28 with the final call text ready for publication (Milestone MS14).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Reports of Experts Workshops – m30

Documents reporting on Tier-1 Experts workshops related activities: content of the workshops and outcomes. This deliverable is updated on annual basis and it is related to Task T6.5.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

First draft of software and tools for motion, perception and world-model stacks

First draft of software for motion, perception stacks and world-model stacks. The software will conform to the models in D3.1.

Improved version of software for motion, perception and world-model stacks in compliance with models included in D3.3.

Document reporting on the software tooling provided to help “stack” and task developers use the formal models provided in Task T3.1 and the
concrete implementations of Task T3.2, in the maximally composable Model- Driven Engineering methodology developed in WP 2.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Modeling Foundation Guidelines and Meta-Meta-Model Structure - m18

Specification of meta-model structure and static modeling. Update expected at M33.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Sustainability Plan – m30

Sustainability plan aiming at supporting RobMoSys related activities beyond the end-of-the project. The document is updated on an annual basis. Main contributors are CEA, EUR and EFE. Outcomes of D7.1 and D7.2 will contribute to this deliverable.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Final Report on Open Call I Experiments

Document reporting on the experiments selected in the context of call I, this final report includes evaluation and assessment of Open Call I results provided by Robmosys partners and Tier-1 experts.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Second report on pilot cases

Second report on progress of pilot cases. This document reports on the Pilot Applications to be used by third-parties selected during the second open call.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Second motion, perception and world-model stacks specifications

Second motion, perception and world model stacks contributions to Call II text for third
party funding. The deliverable includes an improved version of the models needed in the motion control, perception and world-model stacks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2020-02-07

Annual Reports

Report on the progress of work from a technical and financial point of view on annual basis. The annual progress report will be updated every year.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Eclipse Project and Eclipse Project Proposal

Deliverable reporting on activities related to the creation of an Eclipse project to host the RobMoSys open-source platform. This deliverable is in link with task Task 6.4. The deliverable will present the proposal for the open-source project in the first year and will be updated on annual basis.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Initial preparation of (meta-)models, prototypical DSLs, tools and implementation

Initial preparation of (meta-)models, prototypical Domain Specific Languages (DSLs), tools and implementations as needed as input for the other WPs and for preparing the first wave of open calls (including expertise from related communities).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Open Call I preparation documents

Call preparation documents: Guide for applicants, Model Contract, Proposal Template, Call Text Draft, Publication plan and Document describing how the recommandations of Tier-1 members are integrated in the scope of the call I. The document will be updated at M7 with the final call text ready for publication (Milestone MS10)

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Evaluation and selection report for Open Call I

Documents reporting on the evaluation and selection of proposals in the context of the Open Call I. The report includes statistics for Open Call I: number of applicants, number of selected proposals, selection rate, overall considerations.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Periodic Progress Reports

Report on the progress of work from a technical and financial point of view. A risk management issues will be included as well. The periodic progress report will be updated every 6 months.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

First motion, perception and world-model stacks specifications

Specification of the first motion, perception and world-model stacks for contribution to Call I text for third party funding. The deliverable includes the first version of the models needed in the motion control, perception and world-model stacks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Modeling Foundation Guidelines and Meta-Meta-Model Structure

Specification of meta-model structure and static modeling. Updates expected at M18 and M33.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Dissemination Plan

Dissemination plan of the project updated within the first month of each year on annual basis. The deliverable reports on activities carried out in tasks T6.1, T6.2, T6.3, T6.4, T6.5 and T6.6. All the consortium members participate to this deliverable.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

First report on pilot cases

First report on progress of Pilot Cases. This document reports on the design of Pilots including the shared system models and software components.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Sustainability Plan

Sustainability plan aiming at supporting RobMoSys related activities beyond the end-of-the project. The document is updated on an annual basis. Main contributors are CEA, EUR and EFE. Outcomes of D7.1 and D7.2 will contribute to this deliverable.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Business Models for the EcoSystem

Documents reporting on the market analysis pursued in tight collaboration of Tier-1 experts coming from the business world, and taking into account the return of experience of I4MS projects (BEinCPPS, HORSE) and related initiatives as ROBOTT-NET. The market analysis aims at identifying business models for the ecosystem. A special focus will be paid on open-source models. Main contributors to this deliverables are CEA, EFE, EUR and TUM.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07

Quality Management Plan

Report on the quality management which contains quality procedures applied in the project to assure the conformity and the quality of all project deliverables with their requirements and to perform assessment. 6-montly updated.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-26-2016

download deliverable 

Documents, reports 2019-10-07